December 31, 1998 Mr. OlivIr D. Kingsley, Pr:sident Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove, IL 60515 SU' JECT: REGULATORY GUIDE 1.97 - BOILING WATER REACTOR NEUTRON FLUX B
MONITORING - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
-(TAC NOS. M51124 AND M51125)
Dear Mr. Kingsley:
Section 6.2 of Generic Letter 82-33 requested applicants and licensees to provide a report on their implementation of Regulatory Guide 1.97. The BWR Owners' Group responded by submitting NEDO-31558, " Position on NRC Regulatory Guide 1.97, Revision 3, Requirements for Post-Accident Neutron Monitoring System," which proposed attemative criteria for neutron flux monitoring instrumentation in lieu of the Category 1 criteria stated in the regulatory guide.
In a safety evaluation dated January 13,1993, the staff concluded that the criteria of NEDO-31558 was acceptable.
By letter dated June 3,1993, the staff requested you to review the Quad Cities Nuclear Power Station, Units 1 and 2, neutron flux monitoring instrumentation against the criteria of NEDO-31558 and document the results of your review. Your letters dated November 12,1993, April 24,1998 and November 13,1998, provided the results of your review.
The staff has completed its review of your submittals and determined that the deviations from NEDO-31558 specified in your submittais are acceptable. Therefore, the post-accident neutron
- flux monitoring instrumentation at the Quad Cities Nuclear Power Station, Units 1 and 2, is an acceptable attemative to the guidance in Regulatory Guide 1.97.
Sincerely, 1
()
ORIGINAL SIGNED BY:
Robert M. Pulsifer, Project Manager 9901110271 981231 Project Directorate 111-2 PDR ADOCK 05000254 Division of Reactor Projects - Ill/IV P
PDR Office of Nuclear Reactor Regulation Docket Nos. 50-254,50-265 cc: See next page
, n -, g r Qy e e' 1.,L U d, d,3 M f 5 i m.-
DISTRIBUTION.
Docket File PUBLIC PDill-2 r/f BMarcus E. Adensam, EGA1 S. Richards C. Moore R. Laufer R. Pulsifer OGC,015B16 ACRS, T2E26 J. Wermiel M. Ring. Rlli DOCUMENT NAME: G:\\PD3-2\\CM\\ QUAD \\QC1-97.LTR To receive a copy of this document. Indicate in the kw: "C" = Copy without enclosures "E" = Copy witt mnclosures "N" = No copy OFFICE PM:PDill-2
(
LWPDlji-a, c DRCH/kijQB E
D:PDill L f-NAME R. PULSIFG&R
$@ CME JWE@lh.
SRICHARDSSW '
L --
DATE 12L3# /98 12(/ W/98 1L/30'/99'8 g/ 3i /996 OFFICIAL I4ECORD COPY
/>
December 31, 1998 Mr. Oliver D. Kingsley, Przsident h-Nuclear Generation Group Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
REGULATORY GUIDE 1.97 - BOILING WATER REACTOR NEUTRON FLUX MONITORING - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. M51124 AND M51125)
Dear Mr. Kingsley:
Section 6.2 of Generic Letter 82-33 requested applicants and licensees to provide a report on their implementation of Regulatory Guide 1.97. The BWR Owners' Group responded by submitting NEDO-31558, " Position on NRC Regulatory Guide 1.97, Revision 3, Requirements for Post-Accident Neutron Monitoring System," which proposed alternative criteria for neutron flux monitoring instrumentation in lieu of the Category 1 criteria stated in the regulatory guide.
In a safety evaluation dated January 13,1993, the staff concluded that the criteria of NEDO-31558 was acceptable.
By letter dated June 3,1993, the staff requested you to review the Quad Cities Nuclear Power
~ Station, Units 1 and 2, neutron flux monitoring instrumentation against the criteria of NEDO-31558 and document the results of your review. Your letters dated November 12,1993, April 24,1998 and November 13,1998, provided the results of your review.
The staff has completed its review of your submittals and determined that the deviations from NEDO-31558 specified in your submittals are acceptable. Therefore, the post-accident neutron flux monitoring instrumentation at the Quad Cities Nuclear Power Station, Units 1 and 2, is an acceptable attemative to the guidance in Regulatory Guide 1.97.
Sincerely, ORIGINAL SIGNED BY:
Robert M. Pulsifer, Project Manager Project Directorate 111-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regubtion Docket Nos. 50-254,50-265 cc: See next page DISTRIBUTION:
Docket File PUBLIC PDill-2 r/f BMarcus E. Adensam, EGA1 S. Richards C. Moore R. Laufer R. Pulsifer OGC,015B18 ACRS, T2E26 J. Werr.1iel M. Ring, Rill DOCUMENT NAME: G:\\PD3-2\\CM\\ QUAD \\QC1-97.LTR To receive a copy of this documem, bdicate in the 14 m: 'C" = Copy without enclosures *E" = Copy wPh enclosures "N" = No copy LWPD ) -2.4, C DRCt(/HlOB E
D:PDill-2 Ch OFFICE PM:PDill-2
(
4 NAME R. PULSlFS@,8 ffJDClfB JWEIM el SRICHARDSW
~
DATE 12L)# /98 1$ W/98 1L/W/99'8
>D.3 I /996 OFFICIAL ITECORD COPY
/>
p ut n
UNITED STATES
'f i
S NUCLEAR REGULATORY COMMISSION U
WASHINGTON, D.C. 30666 0001 December 31, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
REGUl.ATORY GUIDE 1.97 - BOILING WATER REACTOR NEUTRON FLUX MONITORING - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. M51124 AND M51125)
Dear Mr. Kingsley:
Section 6.2 of Generic Letter 82-33 requested applicants and licensees to provide a report on their implementation of Regulatory Guide 1.97. The BWR Owners' Group responded by submitting NEDO-31558, " Position on NRC Regulatory Guide 1.97, Revision 3 Requirements for Post-Accident Neutron Monitoring System," which proposed attemative criteria for neutron flux monitoring instrumentation in lieu of the Category 1 criteria stated in the regulatory guide.
in a safety evaluation dated January 13,1993, the staff concluded that the criteria of NEDO-31558 was acceptable.
By letter dated June 3,1993, the staff requested you to review the Quad Cities Nuclear Power Station, Units 1 and 2, neutron flux monitoring instrumentation against the criteria of NEDO-31558 and document the results of your review. Your letters de+ed November 12,1993, April 24,1998 and November 13,1998, provided the results of your review.
The staff has completsd its review of your submittals and determined that the deviations from NEDO-31558 specified in your submittats are acceptable. Therefore, the post-accident neutron flux monitoring instrumentation at the Quad Cliies Nuclear Power Station, Units 1 and 2, is an acceptable alternative to the guidance in Regulatory Guide 1.97.
Sincerely,
/
Robert M. Pulsifer, Project Manager Project Directorate ill-2 i
Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-254, 50-265 cc: See next page 1
- i 4{
O. Kingsley' Quad Cities Nuclear Power Station.
' Commonwealth Edison Company Units 1 and 2 cc:
i Michael I. Miller, Esquire.
Vice I" resident - Law and Sidley and Austin Regulatory Affairs One First National Plaza MidAmerican Energy Company Chicago, Illinois 60603 One River Center Place 106 E. Second Street Commonwealth Edison Compariy P.O. Box 4350 Quad Cities Station Manager Davenport, Iowa 52808 22710 206th Avenue North Cordova, Illinois 61242 9740 Document Control Desk-Licensing Commonwealth Edison Company
. U.S. Nuclear Regulatory Commission 1400 Opus Place, Suite 400 j
q Quad Cities Resident inspectors Office Downers Grove, Illinois 60515 22712 206th Avenue N.
Cordova, Illinois 61242 Mr. David Helwig Senior Vice President Chairman Commonwealth Edison Company j
Rock Island County Board Executive Towers West lll i
of Supervisors 1400 Opus Place, Suite 900 l
l 1504 3rd Avenue Downers Grove, Illinois 60515
^
Rock Island County Office Bldg.
RockIsland, Illinois $1201 Mr. Gene H. Stanley -
PWR Vice President
!Ilinois Department of Nuclear Safety Commonwealth Edison Company Office of Nuclear Facility Safety Executive Towers West lli 1035 Outer Park Drive 1400 Opus Place, Suite 900 l
Springfield, Illinois 62704 Downers Grove, Illinois 60515 4
i Regional Administrator Mr. Christopher Crane U.S. NRC, Region lil BWR Vice President 801 Warrenville Road Commonwealth Edison Company Lisle, Illinois 60532-4?51 Executive Towers West lli j
1400 Opus Place, Suite 900 William D. Leach Downers Grove, Illinois 60515 Manager-Nuclear MidAmerican Energy Company Mr. R. M. Krich 907 Walnut Street Mce President - Regulatory Services P.O. Box 657 Commonwealth Edison Company Des Moines,lowa 50303 Executive Towers West 111 1400 Opus Place, Suite 500 Commonwealth Edison Company Downers Grove, Illinois 60515 Site Vice President - Quad Cities 22710 206th Avenue North Cordova, Illinois 61242-9740
~
O. Kingsley Quad Cities Nuclear Power Plant
. Commonwsaith Ed; son Company Units 1 and 2 Commonwealth Edison Company Reg. Affairs Manager-Quad Cities 22710 206th Avenue N.
. Cordova, Illinois 61242-9740 Ms. Pamela B. Stroebel Senior Vice President and General Counsel Commonwealth Edison Company P.O. Box 767 Chicago, lilinois 60690-0767 4
i l