_.
..
.,
- - ~ - - -
.
.e
ps42%,I
UNITED ST ATES
,
.
t.
NUCLEAR REGULATORY COMMISSION .
i
.
.
- - {
- Y-
- REGloN IV
%
- ,;
[F
$11 RYAN PLAZA DRIVE. SUITE 400
ARLINGTON, TEXAS 760114054
JAN I 6' 1998 -
!
Mr. C. L Terry
TU Electric
Group Vice President, Nuclear
ATTNL Regulatory Affairs Department
P.0, Box 1002
Glen Rose, Texas 76043
SUBJECT: NRC INSPECTION REPORT 50-445/97-20; 50-446/97-20 AND NOTICE OF
VIOLATION
Dear Mr. Terry:
'
On November 22,1997, the NRC completed an inspection at your Comanche Peak Steam
Electric Station, Units 1 and 2, reactor facility.- The enclosed report presents the scope and
resu'ts of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Comanche
Peak Steam Electric Station was generally characterized by safsty-conscious operations, sound
engineering and maintenance practices, and good radiological work cordrols. However, a
number of personnel errors were made by experienced personnel during this inspection period.
Some of these errors led to challenges to plant equipment or equipment failures and are
discussC ,urther in the enclosed report.
Three violations of NRC requirements were identified during the inspection, in the first instance,
.
unfamiliarity with system operating parameters by a senior reactor operator in conjunction with
1
an inedequate procedure unnecessarily challenged the low temperature overpressure protection
. system, in the second instance, core alterations were conducted while a portion of the
personnel airlock was incapable of being closed. Lastly, previously identified gaps in the Unit 2
emergency core cooling sump structure had not been adequately corrected.
.
These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your responso. The NRC _will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory -
requirements.
- In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a moy of this letter, its
enclosure (s), and your response will be placed in the NRC Put:,'
't
sent Room (PDR). To
,
Mllll\\ fl,lfll,Illll,llSt'
)
'
e
""
a
.
.
. - - .
-
-.
_-
- . , -
-- - - . - - -
__
.-
c;
,
2-
1 TU Electric
-
the extent possible, your response should not include any personal privacy, propnetary, or
-safeguards information so that it can be placed in the PDF< without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss them -
' with you.
Sine:erely. -
0
(- (
\\
.
1
Joseph I. Tapia Chief
Project Branch A
Division of Reactor Projects
i
Docket Nos.: 50-445
50-446
License Nos.: NPF-87
NPF-89
Enclosures:
2.- NRC Inspection Report
u
50-445/97-20; 50-446/97-20
cc w/ enclosures:
Mr, Roger D. Walker
TU Electric"
- Regulatory A* fairs Mai.ager
'
'
,
P.O. Box .1002 -
Cien Rese, Texas -76043
,
Juanita Ellis '
President - CASE .-
l
~ 1426 South Polk Street
i
Dallas, Texas 75224
TU Electric
Bethesda Licensing -
13 Metro Center, Suite 6101
1
Bethesda, Maryland -20814
George L. Edgar. Esq.
Morgan, Lewis & Bocklus
71800 M.: Street, NW -
q
"
? Washington, D.C. 20036
'
,
.h
.
.
_ . ._
_. .
_
_ - _. .
.
, _ _ _
_
_ - . _ . _ . . . _ .
. . . .
-
-...
-
,
,
.
a.
I
s
- TU Electric .
-3 -
i
o
.
- -
' O. R. Bynog, Program Manager / i
i
i
Chief Inspector
. .
-Texas Department of Licensing & Regulation
Boiler Division -
'
_
P.O. Box 12157, Capitol Station
" ' Honorable Dale McPherson
'
County Judge
P.O. Box 851
- Glen Rose, Texas 76043
i
! Texas Radiation Contiol Program Director
' 1100 West 49th Street
-
'
. John Howard, Director _
_
Enyt.onmental and Natural Resources Policy
Office of the Governor
P.O. Box 12428
,
5
, 5
i
f
,-
--
-,.
r
)i
y
,.
,y
-
. . .
- =
. .
-
-
.
.
.
.-
-
-. .
- 11
.m [
,
- 4
.
'
JAN l 61998
TU Electric
-4-
,
,
.
" E Mail report to T. Frye (TJF) .
5-Mail report to T. Hittz (TGH)
.
.
'
E-Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC) :
- E-Mail report to Frank Talbot (FXT)
'
gjoo.to.DCD (IE01)?/
bec distrib, by RIV:
Regional Administrator -
- Resident inspector (2)
DRP Director-
DRS-PSB
- Branch Chief (DRP/A)
MIS System
4
. Project Engineer (DRP/A)-
RIV File
~ Branch Chief (DRP/TSS)
-
'
,
i
k
P
l
4-
DOCUMENT NAME: ft:\\_CPSES\\CP720RP.DRP -
To receive copy of document. Indicate In box: "C" = Copy without enclosures "E" m Copy with enclosures "N" = No copy -
l
,
, C:DRP/A f(
.f
RIV:Rl
_
,
SRI:DRP/A _
-
RLNaaseWf
HAFreemanW JITapia & l ,
j
'
I
01(998 6 VgE 01/(/98 A6# 01/lW98 []'
3
V
- OFFICIAL RECORD COPY
-
2301237
,
v y
. "
, - - .
4
a
.
_.
. . .
.
.~ ~
.
L
.
-.
,
JAN I 61998
4
TU Electric -
-4
E-Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
,
E-Mail report to NRR Event Tracklr.g System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT) =
bec to DCD (IE01)
.
bec distrib. by RIV:
Regional Administrator.
Resident inspecter (2)-
!
DRP Director
DRS-PSB
Branch Chief (DRP/A)-
MIS System
'.ProAct Engineer (DRP/A)
RIV File
.;. Branch Chief (DRP/TSS)
t-
i
.
.
DOCUMENT NAME: R:\\ CPSES\\CP720RP.DRP-
- To receive copy of document, leidicate in box: "C" = Copy without ' enclosures "E" = Copy with enclosures "N" = No copy
& ,
C:DRP/A f-s
RIV:RI-
,
SRI:DRP/A' _
RLN_easeW_f- HAFreeman%b JITapia d f-j
101(998 ) Lg,R. 01/(/98 Ajrd 01/lW98- /Y
4
- 4
-V
> OFFICIAL RECORD COPY
'
1