ML20198R699
| ML20198R699 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/14/1998 |
| From: | Mitchell T PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9801230386 | |
| Download: ML20198R699 (1) | |
Text
.
Thomoe N.Mrtchell e
v m h edent Peadt Bottrai Atenac her Stauon PECO NUCLEAR n m m <c-> -
1848 Lay Road A Unit of PECO Energy Delta. F A 17314-9032 71' As0 4000 Fax 717 Ase 4243 January 14,1998 Docket Nos.
50 277 50 278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
1997 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station Gentlemen:
This represents the 1997 Annual Report on Safety Relief Challenger for the Peach Bottom Atomic Power Station (PBAPS) as required by the TMI Action Plan, item II. K.3, and by PBAPS Technical Requirvment Manual Appendix A ltem 5.0 R17. During 1997 there was one automatic actuation of a Main Steam Relief valve (MSRV) and no automatic actuations of the Main Steam Safety Valves in response to h:gh reactor pressure. The MSRV ac:uation occurred during the IJnit 2 SCRAM on November 9,1997. The MSRV operated as designed and lifted within its Tect.nical Specification pressure band.
l l
if you have any questions regarding this matter, please call.
Sincerely, 4t Thomas N. Mitchell Vice President
%).
TNM/ MEW /OAL/CWW/ ERG:dec oi cc:
W. T. Henrick, Public Service Electric & Gas R.R. Janati, Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region l, USNRC A.C. McMurtray, USNRC Senior Resident inspector g
T.M. Messick, Atlantic Electric -
(
A.S. Kity lit, Delmarva Power
(
G. Lengyel-INPO Record Center Correspondence Control Desk,618-3 CCN 98 14 C01:
AM hy
.l.l' I.li,I.ll,l.IllllllI3. 'l.l.
C eda o
,