Advises That Info Re C-E TR CEN-629-P,marked as Proprietary, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended
ML20198R599
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/24/1997
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
References
TAC-M97367, TAC-M97368, NUDOCS 9711130330
Download: ML20198R599 (4)


Text

--

Gno uq S0-g ()f p t UNITED STATES

=

j NUOLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30666 4001

\; October 24, 1997

      • e Mr. Roger O. Anderson, Director Nuclear Energy Engineering Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT NOS.1 AND 2)

(TAC NOS. M97367 AND M97368)

Dear Mr. Anderson:

By your application dated August 15,1997, and Combustion Engineering, Inc.'s (CE's) affidavit executed by laq C. Rickard dated August 14,1997, you submitted a supplement to your November 27,1996, license amendment request on incorporation of CE steam generator welded tube sleeve topical report and requested that Attachment 4 (CE Report CEN-629-P, Addendum 1, Revision 1, " Repair of Westinghouse Series 44 and 51 Steam Generator Tubes Using Leak Tight Sleeves, " August 1997, Final Report) be withheld from public disclosure pursuant to 10 CFR 2.790. You also submitted a nonproprietary sersion of this report as Attachment 5 to your August 15,1997, application.

You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

Public disclosure of the information is likely to cause substantial harm to the competitive position of CE because:

1. n similar product is manufactured and sold by major pressurized water reactor competitors of CE.
2. rlevelopment of this information by CE required millions of dollars and thousands of manhours of effort. A competitor would have to undergo similar expense in generating equivalent information; j
3. In order to acquire such information, a competitor would also require considerable time and inconvenience to develop an understanding of welded steam generator tube sleeve installation problems and evaluate specific - [, _t) .

examples based on test or pulled steam generato tube data and develop and d )

qualify a steam generator tube sleeving program.

4. the inforraation consists of a description of the steam generator tube repair process of sleeving, including qualification program re:.ults and analyses, the applicat'on of which provides a competitive economic advantage. The availability of such information to competitors would enable them to modify their product to better compete with CE, take marketing or other actions to improve their DR
  • i

. R. O. Anders:n 2 October 24, 1997 product's position or impair the position of CE's product, and avolo developing similar data and analyses in support of their processes, methods or apparatus:

5. in pricing CE's products and services, significant research, development, _

engineering, analytical, manufacturing, licensing, qunlity assurance and other costs and expenses must be included. The ability of CE's competitors to utilize ;

such information without similar expenditure of resources may enable them to sell at prices reflecting significantly lower costs; and

6. use of the information by competitors in the international marketplace would increase their ability to market nuclear steam supply systems by reducing the costs associated with their technology development. In addition, disclosure would have an adverse economic impact on CE's potential for obtaining or maintaining foreign licensees.

^

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, es amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly_concemed to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of information Act request includes your information, in all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any pubEc disclosure.

Sincerely, ORIGINAL SIGNED BY Beth A. Wetzel, Senior Project Manager Project Directorate 111-1 Division of Reactor Projects - lil/lV Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc w/ encl: See next page DISTRIBUTION: See attached page / 467 DOCUMENT NAME: G:\WPDOCS\ PRAIRIE \Pl970815. PRO $f9 //

7 a receeve a copy of thee document, Ind6cate in the bor "C" = Copy without att.;- JJ ,Jo.ise = Cdy wth e.J,ed/wdosure "N" a No cooy OFFICE PM:PD31 E LA:PD31 ,E (A'BQjEigf!B, N OGC y & D:PD11 f af,4 NAME BWetzel: htW CJamerson G/ E-JkQWinvli)O {Y h JHann6F '

DATE 10/ l W /97 10/ ( 4 /97 (/ 10/ 4 (') 407 10/ O /97 10/ W /97 OFFICIAL RECORD COPY m A

l.

i Mr. Roger O. Anderson, Director Prairie Island Nuclear Generating Northern States Power Company Plant cc:

J. E. Silberg Esquire Site Licensing Shaw, Pittman, Potts and Trowbridge Prairie Island Nuclear Generating 2300 N Street, N, W. Plant Washington DC 20037 Northem States Power Company 1717 Wakonade Drive East Plant Manager Welch, Minnesota 55089 Prairie it.and Nuclear Generating Plant Tribal Council Northem States Power Company Prairie Island Indian Community 1717 Wakonade Drive East ATTN: Environmental Department Welch, Minnesota 55089 5636 Sturgeon Lake Road Welch, Minnesota 55089 Adonis A. Nebiett Assistant Attomey General lan C. Rickard, Direc*or Office of the Attomey General Operations Licensing 455 Minnesota Street Combustion Engineering, Inc.

Suite 900 P.O. Box 500 St. Paul, Minnesota 55101-2127 Windsor, CN 06095-0500 U.S. Nuclear Regulatory Commission Resident inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089-9642 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Box 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145 m im

)

E ________s

3.-

DISTRIBUTION FOR LETTER TO NORTHERN STATES POWER DATEQi; October 24,11997

._..r,+,

~;na--,

{Do6ket File (50-282; 50-306 i'~

PUBLIC PD 3-1 Rdg E.Adensam (EGA1)

B.Wetzel

. C.Jamerson

- E.J.Sullivan M.P. Siemien +(MPS)

J.McCormick-Barger, DRP/ Rill i

S Y ,, 4 k...

M

.- j :1p ,

1 8

{ -

~-

  • y5 4

54 l'

__ . -