ML20198R462

From kanterella
Jump to navigation Jump to search

Forwards SER Approving 970307 & 1118 Relief Requests from Exam Requirements of Applicable ASME Code,Section Xi,For Second Inservice Inspection Interval Exams.Relief Requests RR-A13,A14 & B8 Granted Pursuant to 10CFR50.55a(a)(3)(i)
ML20198R462
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/13/1998
From: Savio R
NRC (Affiliation Not Assigned)
To: Jeffery Wood
CENTERIOR ENERGY, TOLEDO EDISON CO.
Shared Package
ML20198R465 List:
References
TAC-M98242, NUDOCS 9801230323
Download: ML20198R462 (4)


Text

- - - - . - .--

I of a.

l 1

January 13, 1998  :

Mr. John K. Wood Vice President - Nuclear, Davis-Besse >

Centerior Service Company c/o Toledo Edison Company ,

Davis-Besse Nuclear Power Station 5501 North State Route 2 .

Oak Htrbor, OH 43449-9760  !

SUBJECT:

REllEF FROM CERTAIN ASME CODE REQUIREMENTS FOR INSERVICE INSPECTION  !

FOR FACILITY OPERATING LICENSE NO. NPF DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. M98242)

Dear Mr. Wood:

The Technical Specifications for the Davis-Besse Nuclear Power Station state that the inservice inspection of the American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASME Boller and Pressure Vessel Code and applicable addenda ,

as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission.

By letter dated March 7,1997, as supplemented November 18,1997, you i submitted to the NRC requests for relief from the examination requirements of '

the applicable ASME Code,Section XI, for the second inservice inspection ,

interval examinations. The NRC staff has reviewed and evaluated your Relief Request Nos. RR-A13. RR-A14, RR-AIS, and RR-B8 for the second 10-year inservice inspection interval at Davis-Besse. As detailed in the enclosed -

Safety Evaluation, the staff has approved your requests for relief. The  ;

proposed alternatives in Relief Requests RR-A13, RR-A14, and RR-B8 have been  ;

granted pursuant to 10 CFR 50.55a(a)(3)(1). The proposed alternative in .

Relief Request RR-AIS has been granted pursuant to 10 CFR 50.55a(a)(3)(ii).  ;

Please contact Allen Hansen of my staff at (301) 415-1390 if you have any questions regarding this action.

Sincerely, Original signed by: .

g ' g % %" @ Y Richard P. Savio, Acting Director Project Directorate 111-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation CN!' 8

. Docket No.-50-346 DISTRIBUTION: cDocket File ACRS-  ;

4 PUBLIC GHill (2) OGC (

Enclosure:

Safety: Evaluation PPatnaik- EAdensam (EGA1)

GGrant, RI!!- PD3-3 Reading cc w/ enc 1:' See next=page GTracy, OED0 THarris (TLH3, SE only)

  • See previous concurrence

' DOCUMENT NAME: G:\0AVISBES\DB98242.RR

v. . .e m. .wn m wm c . em weom .new e - cm we.new v . w cm 0FFICE PD33-PM m -E PD33-LA E OGC -l PD33-(A)D l E NAME- AHansen4 @ EBarnhill W Suttal
  • RSavio -oR- '

DATE 1 /s /98 . , 0//o ? /98 12/30/97 i / W/19 ' l

.WV"' , OFFICIAlc RELORD COPY O .

{

A y ..

January 13, 1998 Mr. John K. Wood Vice President - Nuclear Davis-Besse Centerior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

RELIEF FROM CERTAIN ASME CODE REQUIREMENTS FOR INSERVICE INSPECTION FOR FACILITY OPERATING LICENSE NO. NPF .1 - DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. M98242)

Dear Mr. Wood:

The Technical Specifications for the Davis-Besse Nuclear Power Etation state-that the inservice inspection of the American Society of Mechanical Engineers 1(ASME) Cod 6 Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASMt Sof fer and Pressure Vessel Code and applicable addenda as required by 10 CFR.50.55a(g), except where specific written relief has been granted by the Commission.

By letter dated March 7,1997, as supplemented November 18, 1997, you submitted to the NRC requests for re 1ef frcm the examination requirements of the applicable ASME Cods, Section-XI, for :he second inservice inspection interval examinations. The NRC staff hr.s reviewed.and evaluated your Relief Request Nos. RR-A13. RR-A14 RR-AIS, and RR-88 for the setor.d 10-year inservice inspection interval at Davis-Besse. As detailed in the enclosed Safety Evaluation, the staff has approved your requests for relief. The proposed alternatives in Relief Rer, Jests RR-A13, RR-A14, and RR-B8 have been t-gr6,nted pursuant to 10 CFR 50.55a(a)(3)(1). -The proposed alternative in Relief Request RR-A15 has been granted pursuant to 10 CFR 50.55a(a)(3)(ii).

Please contact Allen Hansen of my staff at (301)-415-1390 if you have any questions regarding this action.

Sincerely, Original signed by:

Richard P. Savio, Acting Director Project Directorate III Division of Reactor Projects !!!/IV Office of Noclear Reactor Regulation Docket No. 50-346 DISTRIBUTION: Decket File ACRS PUBLIC GHill (2) OGC

Enclosure:

Safety Evaluation -. PPatnaik EAdensas(EGAl)

GGrant, RIII PD3-3 Reading

-cc:w/ enc 1:~ See next page GTracy, OEDO THarris.(TLH3,SEonly)

DOCUMENT NAME: G:\DAVISBES\DB98242.RP *See previous concurrence-

t. . w em - w m m. w : c . c m . c m .m e = . w. m 0FF CE- P033-PM m E. PD33-LA E OGC PD33-(A)0 l E p NAE AHansend @ .- EBarnh111 P Suttal
  • R$avio- oR '

DATE  ; /4 /98 0//o ?/98 12/30/97 l /1%/15 '

0FFICIAL RELORD COPY-

pa meet, ya \ UNITED STATES j ]

j!

NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 300eH001

\*****/ January 13, 1998 Mr. John K. Wood Vice President - Nuclear, Davis-Besse Centerior Service Company ,

c/o Toledo Edison Company i Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

RELIEF FROM CERTAIN ASME CODE REQUIREMENTS FOR INSERVICE INSPECTION FOR FACILITY OPERATING LICENSE NO. NPF DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. M98242)

Dear Mr. Wood:

The Technical Specifications for the Davis-Besse Nuclear Power Station state that the inservice inspection of the American Society of Mechanical Engineers I (ASME) Code Class 1, 2, and ? components shall be performed in accordance with Section XI of the ASME Boller and Pressure Vessel Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific written relief has been i granted by the Commission. l l

By letter dated March 7,1997, as supplemented November 18, 1997, you  !

submitted to the NRC requests for relief from the examination requirements of I the applicable ASME Code,Section XI, for the second inservice inspection  !

interval examinations. The NRC staff has reviewed and evaluated your Relief i Request Nos. RR-A13, RR-A14, RR-A15, and RR-B8 for the second 10-year inservice inspection interval at Davis-Besse. As detailed in the enclosed Safety Evaluation, the staff has approved your requests for relief. The proposed alternatives in Relief Requasts RR-A13, RR-A14, and RR-88 have been granted pursuant to 10 CFR 50.55a(a)(3)(1). The proposed alternative in Relief Request RR-AIS has been granted pursuant to 10 CFR 50.55a(a)(3)(ii).

Please contact Allen Hansen of my staff at (301) 415-1390 if you have any questions regarding this action.

Sincerely, Tsu Richard P. Savio, Acting Director Project Directorate III-3 Division of Reacter Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

Safety Evaluation ec w/ enc 1: See next page

i

..' 1 1

John K. Wood Davis-Besse Nuclear Power Station, Unit 1 Toledo Edison Company cc

[ Mary E. O'Reilly Robert E. Owen, Chief-Centerior Energy Corporation Bureau of Radiological Health i 300 Madison Avenue Service  !

i Toledo, OH 43652 Ohio Department of Health.

L '

P.O. Box 118

. James L. Freels Columbus, OH 43266-0118 Manager - Regulatory Affairs

-Toledo Edison Company James R. Williams, Chief of Staff Davis-Besse Nuclear Power Station Ohio Emergency Management Agency 5501 North State - Route 2 2855 West Dublin oranville Road

'0ak Harbor, OH 43449-9760 Columbus, OH 43235-2206 ,

Gerald Charnoff.-Esq. Donna Owens,' Director

, -Shaw, Pittman, Potts Ohio Department of Commerce and Trowbridge Division of Industrial Compilance

2300 N Street, NW. Bureau of Operations & Maintenance Washington, DC 20037 6606 Tussing Road P.O. Box 4009

! -Regional- Administrator Reynoldsburg, OH 43068-9009 l

- U.S. Nuclear Regulatory Commission l 4

80) Warrenville Road Ohio Environmental Protection Agency Lisle,:IL 60523-4351 DERR--Compliance Unit ATTN: Zack A. Clayton i Robert B. Borsus P.O. Box 1049  !

Babcock & Wilcox Columbus, OH 43266-0149 l Nuclear Power Generation Divition  :

1700 Rockville Pike, Suite 525 - State of Ohio j Rockville, D 20852 Public Utilities Commission '

- 180 East Broad Street Resident Inspector Columbus, OH 43266-0573 U.S. Nuclear Regulatory Commission 1 5503 North State Route 2- Attorney General Oak Harbor, OH 43449 Department of Attorney 30 East Broad Street '

James H.. Lash, Plant Manager Columbus, OH 43216

  • e Toledo Edison Company Davis-Besse Nuclear Power Station President, Board of County 5501 North State Route 2 Connissioner of Ottawa County Oak Harbor, OH 43449-9760' Port Clinton, OH 43252 Roy.P. Lessy,-Jr.

. Akin, Gump, Srauss, Hauer & Feld, LLP l 11333 New Hampshire Ave..'NW., Ste. 400

~ Washington, DC 20036 S h

-4 m._1_..__---_____