ML20198R202

From kanterella
Jump to navigation Jump to search

Forwards Fr Notice of Withdrawal of 970428 & 0530 Application for Amend to License NPF-49,requesting Changes to TS Surveillances 4.1.2.3.1,4.1.2.4.1,4.5.2.f & 4.5.2.h
ML20198R202
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/23/1997
From: Andersen J
NRC (Affiliation Not Assigned)
To: Carns N
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20198R207 List:
References
TAC-M98525, TAC-M98526, NUDOCS 9711130187
Download: ML20198R202 (4)


Text

~ Elf.RCUU.Letmo Senior Vic3 Pr:sident October 23, 1997 cnd Chi;f Nucle:r Offic:r Northeast Nuclear Energy Company

+

clo Ms. Patricia A. Loftus I

i Director Regulatory Affairs P.O. Box 128 Waterford, CT 06385 TIME REQUESTED

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 3 - WITHDRAWAL OF AMENDMENT REQUESTS (TAC NOS. Mg5pgp fM5486)

Dear Mr. Carns:

By letters dated April 28 and May 30,1997, you applied for amendments to the Millstone Nuclear Power Station, Unit 3, facility Operating License No. NPF-49. By letter dated April 28,1997, you requested chang 9s to Technical Specification (TS) Surveillances 4.1.2.3.1, 4.1.2.4.1, 4.5.2.f. and 4.5.2.h. These TS require the charging and safety injection pumps to be tested on a periodic basis and after modifications that alter subsystem flow characteristics. The propened amendment would have made changes to these surveillance requirements. By letter dated May 30,1997, you requested changes to TS Surveillances 4.5.2.f and 4.6.2.2.b. These TS require the periodic flow testhg of the recirc Jation spray system pumps. The proposed amendment would have changed the surveillances by replacing the pump differential acceptance criteria with a pump acceptance curve. Subsequently, by :etter dated October 15,1997, you withdrew the amendment requests.

The Commission has filed the enclosed Notices of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, Original signed by:

James W. Andersen, Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-423,

Enclosures:

Notices (2) cc w/encts: See next page

~j (L -

l DISTRIBUTION:

PMcKee i

Docket File LBerry PUBLIC JAnd6rsen SPO-L Reading OGC SPO Reading ACRS WTravers JDurr, RI DOCUMENT NAME: G:\\MCDONALDW.93955. WIT c. copy without ett.eM.

t,ow....pv., tw. 4.cuen.nt. i,34i.... in th. b. :

o.u,.

- Copy wtth.tt.ch,n.nt/.nclosur.

  • N' = No copy SP0-L:PM /

SPO-L:LAi,l t)

SP7-[:h[

JAndersenh\\gl l

l l

0FFICE i

/

LBt7ry FO PM(Khe NAME DATE 10/T3/97 10/V/97

\\

10'/G/97 10/ /97 10/ /97 0FFICIAL RECORD COPY 1 d1. 012

/ff 9711130187 971023 PDR ADOCK 05000423 P

PDR

an.

UNITED STATES p

j NUCLEAR REGULATORY COMMISSION WASHINGfoN. D.C. 30086 4001

\\...../

October 23, 1997 Mr. Neil S. Carns Sonic ' Vice President and Chief Nuclear Officer Northeast Nuclear Energy Company clo Ms. Patricia A. Loftus Director - Regulatory Affairs P.O. Box 128 Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 3 - WITHDRAWAL OF AMENDMENT REQUESTS (TAC NOS. M98525 AND M98866)

Dear Mr. Carns:

By letters dated April 28 and May 30,1997, you applied for amendments to the Millstone Nuclear Power Station, Unit 3, Facility Operating License No. NPF 49. By letter dated April 28,1997, you requested changes to Technical Specification (TS) Surveillances 4.1.2.3.1, 4.1.2.4.1,4.5.2.f, and 4.5.2.h. These TS require the charging and safety injection pumps u be tested on a periodic basis and after modifications that alter subsystem flow characteristics. The proposed amendment would have made changes to these survelilance requirements. By letter dated May 30,1997, you requested changes to TS Surveillances 4.5.2.f and 4.6.2.2.b. These TS require the periodic flow testing of the recirculation spray system pumps. The proposed amendment would have changed the surveillances by replacing the pump differential acceptance criteria with a pump acceptance curve. Subsequently, by "B16624, Application for Amend to License NPF-49,proposing Changes That Will Affect Nominal Trip Setpoints & Allowable Values. Proprietary Rev 5 to WCAP-10991 & non-proprietary Rev 5 to WCAP-10992,encl.Proprietary Rept Withheld,Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid..790|letter dated October 15,1997]], you withdrew the amendment requests.

The Commission has filed the enclosed Notices of Withdrawal of Application for Amendment to Facility Operating License with the Office of ti.e Federal Register for publication.

Sincerely, arr6s W. Andersen, Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50 423

Enclosures:

Notices (2) cc w/encts: See next page

Northeast Nucle:r Energy C'ampany Millstone Nucle:r Pswer Stetion

~

Unit 3 cc:

Lillian M. Cuoco, Esquire Mr. William D. Meinert Senior Nuclear Counsel Nuclear Engineer Northeast Utilities Service Company Massachusetts Municipal Wholesale P. O. Box 270 Electric Company Hartford, CT 06141-0270 P. O. Cux 426 Ludlow, MA 01056 Mr. Kevin T. A. McCarthy, Director Monitoring and Radiation Division Joseph R. Egan, Esquire Department of Environmental F.aection Egan & Associates, P.C.

79 Elm Street 2300 N Street, NW Hartford, CT 06106-5127 Washington, D.C. 20037 Regional Administrator, Region 1 Mr. F. C. Rothen U.S. Nuclear Regulatory Comrnission Vice President - Nuclear Work Services 475 Allendale Road Northeast Nuclear Energy Company King of Prussia, PA 19406 P. O. Box 128 Waterford, CT 06385 First Selectmen Town of Waterford Ernest C. Hadley, Esquire Hall of Records 1040 B Main Street 200 Boston Post Road P. O. Box 549 l

Wr.terford, CT 06385 West Wareham, MA 02576 i

Mr. Wayne D. Lanning Mr. John Buckingham De;,uty Director of inspections Department of Public Utility Control Special Projects Office Electric Unit 475 Allendale Road 10 Liberty Square King of Prussia, PA 19406 1415 New Britain, CT 06051 Michael H. Brothers Mr. James S. Robinson Vice President - Millstone Unit 3 Manager, Nuclear investments and Northeast Nuclear Energy Company Administration P. O. Box 128 New England Power Company Waterford, CT 06385 25 Research Drive Westborough, MA 01582 Mr. M. R. Scully, Executive Director Connecticut Municipal Electric Mr. D. M. Goebel Energy Cooperative Vice President - Nuclear Oversight 30 Stott Avenue Northeast Nuclear Energy Company Norwich, CT 06360 P. O. Box 128 Waterford, cT 06385 Mr. David Amerine Recovery Officer - Nuclear Engineering and Support Northeast Nuclear Energy Company P. O. Box 128 Waterford, Connecticut 06385

N:rtheast Nucl:cr Energy Company Millst:ne Nucl:ar P3w:r Station Unit 3 cc:

Deborah Katz, President Mr. B. D. Kenyon Citizens Awareness Network President and Chief Executive Officer P. O. Box 83 Northeast Nuclear Energy Company Shelburne Falls, MA 03170 P. O. Box 128 Waterford, CT 06385 Senior Resident inspector Millstone Nuclear Power Station Mr. Daniel L. Curry c/o U.S. Nuclear Regulatory

- Project Director Commission Parsons Power Group Inc.

P. O. Box 513 2675 Morgantown Road Niantic, CT 06357 Reading, Pennsylvania 19607 Mr. Allan Johanson, Assistant Director Mr. Don Schopfer Office of Policy and Management Verification Team Manager Policy Develcpment and Planning Division Sargent & Lundy 450 Capitol Avenue - MS# 52ERN 55 E. Monroe Street P. O. Box 341441 Chicago, Illinois 60603 Hartford, CT 06134-1441 Citizens Regulatory Commission A. TN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, Connecticut 06385 The Honorable Terry Concannon Co Chair Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, Connecticut 06106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, Connecticut 06070 Little Harbor Consultants, Inc.

Millstone - ITPOP Project Office P. O. Box 0630 Niantic, Connecticut 06357-0630

-. -. -..