Advises of Decision to Change Control Method to Be Used for Penetration M-22.Outside Manual Valve 54-24-179 Will Be Maintained in Normally locked-out Closed Position & Opened Only Under Controlled Procedure Per NUREG-0827
ML20198R115
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/28/1986
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0827, RTR-NUREG-827 LAC-11606, NUDOCS 8606090451
Download: ML20198R115 (2)


Text

.__

6 D DA/R LAND h [k COOPERAT/VE = PO. BOX 817

  • 2615 EAST AV SOUTH
  • LA CROSSE. W1SCONSIN 64601 (608) 788 4 000 May 28, 1986 In reply, please refer to LAC-11606 DOCKET NO. 50-409 Mr. John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 INTEGRATED PLANT SAFETY ASSESSMENT-SYSTEMATIC EVALUATION PROGRAM NUREG-0827 - FULL TERM LICENSE COMMITMENTS

References:

(1) DPC Letter, Linder to Crutchfield, LAC-8881, datad February 16, 1983.

(2) NUREG-0827, " Integrated Plant Safety Assessment-Systematic Evaluation Program - La Crosse Boiling Water Reactor".

(3) DPC Letter, Linder to Crutchfield, LAC-9742, dated March 28, 1984.

Dear Mr. Zwolinski:

This submittal is to inform you of DPC's decision to change the control method to be used for Penetration M-22. This differs from our Reference 3 submittal.

Reference 3 Penetration M-22 Conrnitment Penetration M-22 vill become an unused penetration. The line vill be cut and isolated from containment atmosphere.

DPC Revised Commitment for Penetration M-22 The outside manual valve, 54-24-179, will be maintained in a normally locked-closed position and opened only under a controlled procedure to transfer waste water.

This control method was our original commitment for Penetration M-22. We had planned to change it following a facility modification, as discussed in Reference 3. We have since decided to maintain this method of control, mainly due to the radiation exposure involved in cutting the line. As discussed in WP4.41 8606090451 060520 PDR ADOCK 05000409 g\c P PDR Y l

+.

'w Mr. Jchn A. Zwoliniki, Director May 28, 1986 BWR Project Directorate #1 LAC-11606 Reference 3, however, this penetration is no longer the one which is routinely used. Our original commitment was made in Reference 1 and accepted in Reference 2. We have not yet received a reply to Reference 3.

If there are any questions, please contact us.

Yours truly, DAIRYLAND POWER COOPERATIVE James W. Taylor General Manager JWT:LLN:sks cc: Mr. J. G. Keppler, Region III Mr. John Stang, LACBWR Froject Manager NRC Resident Inspector WP4.41