ML20198R055

From kanterella
Jump to navigation Jump to search
Notifies NRC of Change in Regulatory Commitment.Specifics of Commitment Change Provided Listed
ML20198R055
Person / Time
Site: Paducah Gaseous Diffusion Plant
Issue date: 01/16/1998
From: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
To: Paperiello C
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-98-0006, GDP-98-6, NUDOCS 9801230207
Download: ML20198R055 (2)


Text

.. _.

e

.USEC A clobal Enwry company JAuEs H. Mitte.R VICE PRESIDENT, PRODUCil0N Dir (301)564 3309 Fax:(301) 571-8279 January 16,1998 Dr. Carl J. Paperiello Director, Office of Nuclear Material SERIAL: GDP 98 0006 Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 0001 Pr.ducah Gaseous Diffusion Plant (PGDP)

Dockei No. 70 7001 Notification of Change in Regulatory Commitment

Dear Dr. Paperiello:

The purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of a ch regulatory commitment. This commitment was made in USEC letter GDP-97-0188 dated O 1997, which submitted a certificate amendment request (CAR) containing the Safety A Update (SAR Update) required by issue 2 of DOE /ORO-2026," Plan for Achieving Comp NRC Regulations at the Paducah Gaseous Difrusion Plant"(the Compliance Plan) for NRC re approval. The specifics of this commitment change are provided below.

Backcround in USEC letter GDP 97-0188, USEC committed, in part, that "[t]he results of the USEC com loading analysis fbr Buildings C-333-A, C-337-A, and C-360, including any necessary c SARUP, will be submitted to the NRC by January 19,1998."

Descrintion of Revised Commitment "The results of the USEC combustible loading analysis fb B ildi including any necessary changes to the SARUP, will be submitted to the NRC by r u 9901230207 990116 PDR ADOCK 07007001 C

PDR

)

g ll l{ lh [ll f.ll3 llll i,

'\\

^,n

'"'VVU 6903 Rmkledge Drive. Ikihesda, AtD 20817 1818 Telephone 301504 3200 Fax 301-%4 3201 http:#www.usec. coin OMces in live more, CA Paducah. IN Ibrtsnwuth, Oil Washington, DC p

Dr. Carl J. Paperiello

' January 16,1998 ODP 98 0006 Page 2 Justification for Revised Ccmmitment The combustible loading analysis for buildings C-333 A, C-337-A, and C-360 has been completed and the results support a non safety classification for tbc fixed fire suppression systems in these facilities, llowever, several documents supporting the SAR Update accident analysis must also be revised prior to submitting proposed changes to the SAR Update CAR for NRC review. The complexity of these document revisions requires additional time to ensure that they are complete and accurate.

if you have any questions, please contact Steve Routh at (301) 564-3251. The enclosure to this letter provides the revired commitment.

Sin,.crely,

/

I d

i gy J

cs 11. Miller ice President, Production

Enclosure:

Commitments identified in this Submittal cc:

NRC Region til Office NRC Resident inspector - PGDP NRC Resident inspector - PORTS Mr. Joe W. Parks (DOE)

_