4 November 6, 1997 Mr. L. W. Pearce Site Vice President Quad Cities Station Commonwealth Edison Company 22710 206th Avenue North Cordova,IL 61242 l
Dear Mr. Pearce:
-)
In a telephone conversation on November 5,1997, between Mr. M. Bielby, NRC Examiner, and Mr. Dan Snook, License Training Group Leader, arrangements were made for the administration of licensing examinations at the Quad Cities Nuclear Station the week of l
March 16,1998. In addition, the NRC will make an examination validation visit to your facility the week of March 2: 1998.
The NRC will prepara the examinations based on the guidelines in Interim Revision 8, of NUREG 1021," Operator Licensing Examination Standards for Power Reactors." In accordance with the guidelines in Attachment 5 of ES-201, your staff will be given the
- opportunity to review the examinations the week of March 2,1998.
To meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES 201 by December 2,1997. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled, in order to conduct the requested written examinations and operating tests, it will Le necessary for your staff to provide adequate space and accommodations in accordance with ES 402, and to make the simulation facility available on the dates noted above. In accordance with ES 302, your staff should retain the original simulator performanos data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in ehect while the written examinations and operating tests are being administered.
To permit timely NRC review cnd evaluation, your staff should submit preliminary reactor
)In operator and senior reactor operator license applications (Office of Management and Budget U
(OMB) approval number 3150 0090), medical certifications (OMB approval number 3150 0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date, if the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date, M
s Y
[M %*
IlllIIRRlIRI
- - ~.. -
t 4
L. W. Pearce 2
November 6, 1997 i
This letter contains information collections that are subject to the Paperwork Reducflon Act of f 995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.
The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and -
completing and reviewing the collection of Information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mall at. BJSi@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Oft.ce of Managenent and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Snook has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Elden Plettner at 630-829-9730, or me at 630-829-9705.
Sincerely, Original Signed by Melvyn t.each Melvyn N. i.each, Chief Operator Lloensing Branch Docket No. 50-254 Docket No. 50-265 See Attached Distribution DOCUMENT NAME:G:\\DRS\\QUA110 v.
,o we c b7.DRS
, - - v. e...n.
ir.
OFFICE Rlll:DRS g l (/
Rill:DRS e
NAME-
-MBlelby:Jo wc4 MNLeach aA4 DATE 11/ L /97 11/4 /97 OFFICIAL RECORD COPY
- L. W. Pearce 3
November 6, 1997 I
cc:
R. J. Manning, Executive Vice President, Generation M. Wallace, Senior Vice President, Corporate Servlees E. Kraft Vice President, BWR Operations i
D. A. Sager. Vice President, Generation Support-D. Farrar, Nuclear Regulatory -
. Services Manager
- 1. Johnson, Licensing Operations Manager Document ControlDesk Licensing Quad Cities Station Manager C. C. Peterson, Regvatory Affairs Manager Richard Hubbard Nathan Schloss, Economist, Office of the Attorney General State Llaison Officer Chairman, Illinois Commerce Commission W. D. Leech, Manager of Nuclear, MidAmerican Energy Company-F. S. Tsakeres, Training Department Distribution:
' Docket File DRS PUBLIC IE-42 Rlli PRR OCFOILFARB -
SRI, Quad Cities R. M. Gallo, NRR/HOLB M. A. Ring, DRP R. M. Pulsifer, LPM, NRR
.....