Forwards Trip Rept Results of 961121 Onsite Discussions by Representatives of NRC Re Graded QA Program at Facility
ML20198Q551
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/06/1997
From: Donohew J
NRC (Affiliation Not Assigned)
To: Hagan J
ENTERGY OPERATIONS, INC.
Shared Package
ML20198Q554 List:
References
TAC-M92420, NUDOCS 9711120246
Download: ML20198Q551 (4)


Text

__

[f s*

p n caao %

t

,} UNITED STATES NUCLEAR REGULATORY COMMISSION N'

WASHINGTON, D.C. 3064H001 t

y*...+/ November 6, 1997 i

Mr. Joseph J. Hagan Vice President, Operations GGNS Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150

SUBJECT:

TRIP REPORT - ASSESSMENT OF THE GRAND GULF NUCLEAR STATION, UNIT 1, GRADED QUALITY ASSURANCE PROGRAM FOR THE PROCVREMENT AWA (TAC NO. M92420)

Dear Mr. Hagan:

The enclosed trip report provides the results of the November site discussions by representatives of the Nuclear Regulatory Commission 21, 1996, on-related toUnit Station the 1graded quality assurance (QA) program at Grand Gulf Nuclear (NRC)

Assuranc,e Manual (GGNS). This program is within the GGNS Operational Quality (0QAM).

The NRC applied andprocurement to the GGHS staffs discussed aspects of the GGNS graded QA program area.

These discussions helped the NRC staff to better understand the implementation aspects of the graded QA program. The NRC staff noted that GGNS has made progress in establishing its QA process for procurement activities; however, the implementation procedures for those activities had not been fully developed as explained in the enclosed report.

The NRC staff acknowledges that the GGNS graded QA program incorporates applicable text from Appendix B to 10 CFR Part 50 for applying controls commensurate with the safety significance of structures, systems, and components SSCs). However, if any commitments in the 0QAM are reduced by expanding gr(aded Qt. to other activities than procurement, the 0QAM a licensee's QA program describe how the requireme(nts of App met.

d

)

\

9711120246 971106 IN $ [ M !)[~"PI"!D P O M r DR ADOCK0500g6 II ,Il,liljlll1,II,h .I

Joseph J. Hagan In conclusion, the NRC staff determined that the procurement activities reviewed were )rocessed as required by the GGNS 0QAM and the applicable precedures. T.1e staff also found that a >propriate verifications had been performed for the )rocurement packages t1at were reviewed. Also, note that during this trip tie NRC staff did not evaluate any as ect of the graded QA process relative to the determination of the safety si nificance of SSCs.

Sincerely, JackN.Okphew,SeniorProjectManager l Project Directorate IV-1 l Division of Reactor Projects lil/IV l Office of Nuclear Reactor Regulation Docket No. 50 416

Enclosure:

Trip Report cc w/ encl: See next page l-DISTRIBUTION:

Docket File PUBLIC PD4-1 r/f E. Adensam (EGAl) J. Clifford J. Donohew T. Gwynn, RIV ACRS OGC (15B18)

C. Hawes S. Black R. Gramm-E. Ford Document Name: GG92420.TRP 0FC PM/I'D4Fh LA/PD4-1 BC/HQMB . (A)D/PD4-1 NAME JDpfN/vw CHawes(ClN SBlack k h / JCkford ll/l'/97 \ ll /if /97 DATE il / 4 /97 (t / 5 /97 COPY YES/NO YES/NO dE3/NO E YES/NO 0FFICIAL RECOR) COP (

"/yb 4

. Joseph J. Hagan -

2-i l

l In conclusion, the NRC staff determined that the procurement activities reviewed were )rocessed as required by the GGNS 0QAM and the applicable procedures. T1e :taff also found that a>propriate verifications had been performed for the arocurement packages t1at were reviewed. Also, note that during this trip t1e NRC staff did not evaluate any aspect of the graded QA process relative to the determination of the safety significance of SSCs.

Sincerely.

Odd GiorProjectManager Jack N. Donohew, k

( Project Directorate IV-1

' Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

Trip Report cc w/ enc 1: See next page i

I l

--myw e +<m_w w _~ - , - - , , , --M7-- r-

l Mr. Joseph J. Hagan

. Entergy Operations, Inc. Grand Gulf Nuclear Station t.c :

Executive Vice President General Manager, GGNS

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 755 P. O. Box 31993 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attorney General Wise, Carter, Child & Caruay Department cf Justice P. 0.-Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Governor Resources State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attorney General President, Asst. Attorney General claiborne County Board of Supervisors State of Mississippi P. O. Box 339 P. O. Box 22947 Port Gibson, MS 39150 Jackson, MS 39225 Regional Administrator, Region IV Vice President Operations Support U.S. Nuclear Regulatory Commission Entergy Operations, Inc.

611 Ryan Plaza Drive, Suite 1000 P.O. Box 31995 Arlington, TX 76011 Jackson, MS 39286-1995 Senior Resident inspector Director, Nuclear Safety V. S. Nuclear Regulatory Conmission and Regulatory Affairs Route 2, Box 399 Entergy Operations, Inc.

Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 Manager of Operations Bechtel Power. corporation P.O. Box-2166 Houston, TX 77252-2166