ML20198P573

From kanterella
Jump to navigation Jump to search
Informs That Inconsistencies in Documentation Describing Initial Problem Identified in Corrective Actions Associated W/Ler 373/97-021, Undrainable Low Areas in Drywell Floor Resulting.... Necessary Work Will Be Completed by 980227
ML20198P573
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 01/12/1998
From: Dacimo F
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.045, RTR-REGGD-1.045 NUDOCS 9801220160
Download: ML20198P573 (2)


Text

o.mmonwcaiin nne,n o,nipam I Aalle Generating Nation I

- Edit honh.!! t Ito.nl M.ar$ttlc= il 614 4 i AF5'

'IrlHis W F 61 January 12,1998 United Stams Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20F5

Subject:

Revised Date for Supplemental Report Related to LER 373/97-021 LaSalle County Station, Units 1 and 2 Facility Operating License NPF-11 and NPF 18 NRC Docket Nos. 50-3',3 and 50 374

Reference:

F. Dacimo ietter to U. S. NRC dated October 31,1997 Informing U.S. NRC of LER 373/97-021 Revised Supplement Report Date Corrective actions associated with LER 373/97-021,"Undrainable Low Areas in the Drywell Floor Resulting in a Degradation cf the Leak Detection System," included reviews of the design basis and as built condition of the reactor building drywell floor. During these reviews, inconsistencies in the dccumentation describing the initial problem were identified. These inconsistencies may have led to incorrect assumptions used in subscquent evaluations.

To resolve these issues, discussions with station personnel involv ed in the original 1994 event have been conducted and initiel construction rocoids reviewed. However, the evaluation of the design basis is taking loager than expected in addition, the verification of the new sump level meas 4irement system to Regulatory GJide 1.45 accuracy measurements has been delayed due to slow delivery of vendor information. We expect the necessary work to be completed with the results transmitted in a supplement to LER 373/97-021 by February 27,1998.

\\

-G 0 9 ;

D

'"O

.Ill.ii!.11.ll.[ l.lil.. Il 9001220169 900112 PDC ADOCK 05000373 8

PDR A rnwom o>mpans

7____

l

(..

'n

-l

\\
e-

, _. - ~

if there are any questions or comments concoming this letter, please referi i

them td Perry Bames, Regulatory Assurance Supervisor, at (815) 357 6761, I

exten..sion 2383..

. -..,.~

~

^

Respec i,.

t f

b i

U Fred Dacimo ;

Plant General Manager LaSalle _ County Station cc:

A. B. Beach, NRC Regiori Ill Administrators M. P. Huber, NRC Senior Resident Inspector ; LaSalle.-

- D. M.' Skay, Project Manager - NRR LaSalle F. Niziolek, Office of Nuclear Facility Safety - lDNS I

i~

i W-i

?

i f

I' l -.

g n:,

s..