P.O. 90X DWNVILL B SKA 88321 Nebraska Public Power District
- 13%'t#?"
.nmm_.-
n NLS980011 January 15,1998 U.S. Nuclear Regulatory Commission Attention: Dceumem Control Desk Washington, D C. 20555-0001 Gentlemen:
Subject:
Schedule for Implementing Proposed Change to CNS Technical Specifications Implementation of BWR Thermal Hydraulic Stability Solution Cooper Nuclear Station NRC Docket 50-298, DPR-46
Reference:
- 1. Letter NLS970001 to Document Control Desk (USNRC) from G. R. Horn (NPPD) dated February 10,1997," Proposed Changr 'o CNS Technical Specifications, Implementation of BWR Thermal Hydraulic Stability Solution, Cooper Nuclear Station, NRC Docket 50-298, DPR-46" By letter dated February 10,1997 (Reference 1), the Nebraske Public Power District (District) proposed a change to the Cooper Nuclear Station (CNS) Technical Specifications to implement the BWR thermal hydraulic stability solution. Therein, the District requested a 30 day implementation period to provide for cperator training and the revision of station procedures.
Subsequent to that submittal, the District committed to a mid-cycle outage which will impact the resources necessary to implement the proposed change within the 30 days originally requested..
Accordingly, the District is requesting 60 days from the date ofissuance tc implement referenced change.
Should you have any questions concerning this matter, please contact me.
Sincerely, l
\\
P.D Graham I
Vice President of Nuclear Energy
\\\\ht{\\bbh 9001210276 990115
?
PDR ADOCK 0500029a i
P PDR
[
W Mf;'r-m s. w 3 F"HTW
~=~=E5*me wa=wT
- _Mw
'=f==w= = 154=======
=
--========y===-
NLS980011 ~
T Januaiy 13,1998:
' Page 2'of 2 e
cc: Regional Administrator;
-USNRC i Region IV.
y Senior Project Manager.
USNRC - NRR Project Directorate IV-1
- Senior Resident inspector USNRC
-NPG Distribution O'
ot
. {_ 4 o.
i
_l_______.l_m_.
U________mI___
l
- A3'TACHMENT 3 LIST OF NRC COMMITMINTS l
Correspondence No: NLS980011 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory coninitments.
Please notify the Licensing Manager at Cooper Iuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMONT OR OUTAGE None k
I l
PROCEDURE NUMBER 0.42 l
__ REVISION NUMBER 5 l
PAGE 9 OF 13 l