Advises of Planned Insp Effort Resulting from Plant Performance Review.Encl Details NRC Insp Plan for Approx Next Six Months
ML20198N891
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/09/1998
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
References
NUDOCS 9801210247
Download: ML20198N891 (4)


Text

,, - -.

.~.- -.-

.- ~ -

~~..

p.

. \\

,e g,**"y%1

. unstmo STATES.

l

muct can ne
UI.ATORY COMMISSON' e
o.

' REOloN Hi.

y q

a p

so,wannewy w;3ono, y.

usuE. ILUNOls 80632-4361 g

N...s Januar/ 9.1998.

Mr. John K. Wood -

Vice Presiderd - Nuclear.

Devis-Besse Nuclear Power Station-CorWorlor Service Company '

5501 North State Route 2 E

Oak Harbor, OH :43449.

y

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR)- DAVIS-BESSE POWER STATION '

Dear Mr. Wood:

J

" On October 22,'i997, the NRC staff completed the semiannual Plant Performance Review (PPR):

' Jof the Davis-Besse Power Station.1The Region conducts these reviews for all operating nuclear '

l power plants to develop an integrated understanding of safety performance. The results are _

L und by regional manageraent to facilitate planning a,nd allocation of inspection resources. -The PPR for Davis-Besse Power Station involved the participation of all Region lll technical divisions

as well as responsible NRR staff, in evaluating inspection results and safety performance.

information for the period from April 1997 through September 1997. ' PPRs provide regional L

management with a current summary (,f licensee performance and serve as inputs to the NRC D

Systematic Assessment of Licensee Performance and senior menacement meeting reviews.-

.Overall, performance at Davis-Besse continued to be excellent over the last 6 month period. The conduct of operations was generally good. However, some operator attention to detail problems and administrative control issues continued to be observed. Very good mater'st condition was-is maintained with few significant equipment problems noted. One exception occ'.:rred in May when an inadvettent deluge'of the main transformer caused a phase to ground fault and resultant' L'

reactor trip.1 The deluge was caused by a failure of a temperature sensor. Plant management remained actively involved in the day-to-day operation of the plant and the staff exhibited ownership of facilities and activities under their purview. The corrective action prograrn was it

. effective, overall, in identifying and correcting plant problems.

' This letter advises you of our planned inspection effort resulting from the Davis-Besse Power

. Station PPR review.' The information is_ provided to enable appropriate consideration of the '

Asource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan

~

4 for approximately the next 6 months. The rationale or basis for each inspection outside the.

" Core" inspection prog tm is provided so that you are aware of the reason for emphasis in these -

program areas. Resident inspections, as well as periodic inspections by other assigned members of our staff, may occur at any time in support of the Core inspection program.

,I 2

k

'. 1 alcon ll ll ll llllllllllll!

m w

M en m ^

p Q g ] [ [1 y

~~

J. Wood

.-2 We are interested in feedback on this program, including the need for any cha1ges in the inspection plan, and we invite your questions or comments. if changes are necessary, you will be informed. If you have any questions, please contact me at (630) 829-9866.

Sincerely, Th J. Kozak, Chief Reactor Projects Branch 4 Docket No. 50-346

? License No. NPF-3

Enclosure:

Inspection Plan cc w/ encl:

John P. Stetz, Senior Vice President - Nuclear J. H. Lash, Plant Manager J. L Freels, Manager Regulatory Affairs-State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health O. A. Glazer, State of Ohio, Public Utilities Commission

~

o o

%i DAVt3 8 ESSE POW _iR STATION DISPECTION PLAN

' F-Inspection Procedure T1-Temporaryinstruchon Core inspecton - Minimum NRC Inspection Program (mandstory aE plants) l

,i INSPECTION TITL S NUMBER OF PLAfGED TYPE OF BISPECTION-PROGRAM WA INSPECTORS INSPECTION COMMENTS DATES IP 60851,7 -

Spent Fuel Dry Cesk Storage 1-2 When Cesk Routine inspecton of aE aspects of IP 80854,5 Loading Resumes SFSI-IP 40500 EffecHveness of Licensee 3-4 8/15-7/17/98 Enginsedng inspecton IP 37560 Controls in identifying, ResoMng, and Provenung i

Problems /Onsite Engineering IP 83750 Radiation Protection 1-2 4/27 - 5/1/98 Routmo core inspection IP 84750 -

Effluents / Chemistry 1-2 6/8 - 6/12/98 Routine core inspec6on AE followup inspedian 1

2/15-3/15#98 Engineering ir==p=<4rwi IP 73753 Inservice inspechon 1

AprE - May 1998 Routine core inspection

!P 81110 Operational Safeguards 4

6/29 - 7/2/98 Routmo core hopection p,- rae 4

i i

4

.a:

y o.

J. Woodi

-2.

]

I We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments.> If changes are necessary, you will be informed. : If you have any questions, please contact me at (630) 829 9866.

Sincerely.

/s T/. J.-Kozak

~

Thomas J. Kozak, Chief Reactor Projects Brar,& 4 Docket No. 50-346

- License No. NPF-3

Enclosure:

Inspection Plan cc w/ encl:

John P. Stetz, Senior Vice President-Nuclear J. H. Lash, Plant Manager J. L Freels, Manager.

Regulatory Affairs State Liaison Officer, State of Ohio -

. Robert E. Owen, Ohio Department of Health C. A. Glazer, State of Ohio, Public Utilities Comm:ssion 1

L Distribution:

l, Docket File w/enci -

SRI Davis-Besse w!enci L

PUBLIC IE-01 w/ encl A. B. Beach w/ encl i-Project Menager, NRR w/enci Deputy RA w/ encl Rill Enf. C,oordinator w/ encl Rlli PRR w/enci CAA1 w/enct (E-mail)

DRS (2)w/enci

TSS w/enct DOCDESK (E-mail) l DRP w/enci

[-

DOCUMENT NAME: G:\\DAVi\\lNSPPLN5.DAV

- To seessee a espy of tido deessnieset. indleeso in the bon 'C' = Cm usicheut ettechnientleneisease 'E' = Copy tweeti otteshesientlenelsewe l

se = esoes.,-

L OFFICE ~

Rill'.

.l Rlli g L l

Rll 4

Rill

// W -

i NAME-LoudB06d/Gardner:nhF Ga5le/[e@ftGD d Md/ShMdM Korak' D DATE hW--f97 ll<, d 12/05/97 12/ 197 FI/4(

OFFICIAL RECORD COPY r

f

--