Vdb4 W
s' COY s
DUKE POWER GOMPA.W
\\Ck l*.O. HOX !!!)180 d(
CHAltLOTTE, N.C. 28212 7
g U
f IIAL B. TUCKER T
rete rsusse ll pop ara-n:n
~c'===
February 4, 1985 b H D,/,* 07 mu...om.""
s/4J Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 2 Docket No. 50-370 g Startup Report - Supplement 4
Dear Dr. Grace:
Pursuant to Technical Specifications 6.9.1.1, 6.9.1.2, and 6.9.1.3, the following is provided as supplement 4 to the Startup Report for McGuire Nuclear Station, Unit 2.
During the previous 90 days, no additional testing at McGuire Unit 2 has been performed. McGuire Unit 2 entered its first refueling outage on January 25, 1985. gives a list of the startup tests which resain uncompleted.
The startup test program is still not complete since not all of the power escalation testing has been performed. Accordingly, pursuant to T. S. 6.9.1.3, additional supplementary reports will be submitted at least every 3 months until completion of all power escalation testing. The next supplemental report keeping you apprised l
of the progress of this testing will be filed by May 5, 1985.
Please advise if there a're any questions concerning this matter.
Very truly yours, b
/&([
Hal B. Tucker PBN/mjf Attachment womuBiasik kh, P
c
i Dr. J. Nelson Gr.
. Regional Administrator rebruary 4,1985 Page cc: Document Control Desk (36)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Darl Hood Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station t
m -
o McGuire Nuclear Station - Unit 2 Startup Report Addendum Startup Testing to be Completed February 4,1985 The following startup tests have yet to be performed or completed at McGuire Unit 2.
1.
PD Pump Control of Pressurizer Level at 30% Power (TP/2/A/2650/25).
This test is scheduled following the first refueling after system modifications are made.
2.
Piping Dynamic Response Following Loss of Electrical Load Test (TP/2/A/1200/27A). This test is scheduled to be completed following the first refueling. The repair of several hangers is still outstanding and will be done during the first refueling.