Text
,
N PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (zts) est so20
" jj:fyllv June 2, 1986 8euCLE A R P AODWC, TON nue,..e...ove,
.o....,-...
Docket No. 50-352 Mr. W. R.
Butler, Director Project Directorate No. 4 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Butler:
This will confirm discussions with Mr. R.
E.
Martin of your staff that Amendment No. 2 to the Limerick Unit 1 License, which was issued on March 3, 1986, contains an apparent word-processing error on page 3/4 6-24 of the Technical Specifications.
The last four column entries for valve HV51-lF041 appear to be shifted over one column.
A copy of the amended page is attached with the apparent errors highlighted, along with a copy of the page prior to the amendment.
This particular amendment, due to the passage of time, is no longer applicable because of its one-time temporary nature.
We are bringing this matter to your attention pursuant to our discussions with Mr. Martin for whatever corrective action you deem appropriate.
Should you have any questions cr require further information, please do not hesitate to contact us.
Ver truly yours, Yl{shi/T l
f
)
Attachments I
cc:
E. M. Kelly, Senior Resident Site Inspector 90 t t 8606060110 860602
(
PDR ADOCK 000003S2-PDR p
I
- y,,, -,
. ;. : ;.' < w
-v
- ~.
.. - J C
1
~-
-1 k.
m1-TABLE 3.6.3-1 (Crntinued) 4 PART A - PRIMARY CONTAINMENT ISOLATION VALVES 5
INBOARD OUTBOARD ISOL.
E PENETRATION FUNCTION ISOLATION ISOLATION MAX.ISOL.
SIGNAL (S),
NOTES P&ID NUMBER BARRIER BARRIER TIME.IF APP.
IF APP.
c (SEC)(26)
(20) z "a 040G-1 ILRT DATA ACQUISITION 60-1057 NA 5,11 60 60-1058 NA 11 040G-2 ILRT DATA ACQUISITION 60-1071 NA 5,11 60 60-1070 NA 11 040H-1 CONTAINMENT INSTRUMENT 59-1005A(CK)
NA 59 GAS SUPPLY - HEADER 'A' HV59-129A 7
C H,5 042 STANDBY LIQUID CONTROL 48-1F007(CK)
NA 48 (X-116)
HV48-1F006A 60 29 4
043B MAIN STEAM SAMPLE HV41-1FL64 10 8,0 41 i
HV41-1F085 10 B,D
"+
044 RWCU ALTERNATE 41-1017 NA 5,31 41 RETURN 41-1016(X-9A, NA X-98)
PSV41-112 NA 045A(8,C,D)
LPCI INJECTION *A'(B,C,D)..HV51-1F041A*(8,C",
MA-9,22 5 g
D*)(CK) g HV51-142A*(B,C*,
7 9,22 g
D*)
~
HV51-1F017A*
' 38 a5 (B,C*,D*)
5 050A-1 DRWELL PRESSURE.
HV42-1478 45 10 42 N
INSTRUMENTATION 053 DRWELL CHILLED WATER HVS7-128*
60 C,H 11 87- -
SUPPLY - LOOP 'A' HV87-120A*
60 11,28, 29 HV87-125A*
~60 11,28,29
.