Forwards Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted
ML20198N353
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/23/1998
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20198N356 List:
References
50-440-98-19, NUDOCS 9901060105
Download: ML20198N353 (2)


See also: IR 05000440/1998019

Text

,.

_ . _ .

-

.

.~

_ _ _ _

_ . . . . _ _

0

".

,

December 23, 1998

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081-

SUBJECT:

PERRY INSPECTION REPORT 50-440/98019(DRP)

,

)

Dear Mr. Myers:

On December 2,1998, the NRC completed a routine safety inspection at your Perry Nuclear

Power Plant. The enclosed report presents the results of that inspection.

During this 6-week inspection period, the conduct of activities at the Perry facility was

characterized by continued safe and conservative operation, with good coordination among and

between work groups.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

'

Sincerely,

/s/ T. Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No.: 50-440

License No.: NPF-58

Enclosure:

Inspection Report 50-440/98019(DRP)

See Attached Distribution

DOCUMENT NAME: PER98019.DRP

u m,~,

. em. g m , -

mr.,. 4, m e

m,

e . % mm m

m i r . % me m-umi y .

e em

h

l

OFFICE

Rill

fl

Rlll

DuPont/mi h Kozak N

NAME

j

DATE

l

I

/

k8

OFFICIAL RECORD COPY

,

G

. -

.-

.

-.

.-

.- -

. . .

..

..

,

_

gt:

4,

L; Myers

-2-

,

l

cc w/ encl:

H. L. Hegrat, Manager,

+

Regulatory Affairs

R.- W. Schrauder, Director,

Nuclear Engineering Department

W. R._' Kanda, General Manager,

,

Nuclear Power Plant Department

N. L. Bonner, Director

Nuclear Maintenance Department

. H. W. Bergendahl, Director,

Nuclear Services Department

L

Ohio State Liaison Officer

' i

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

l

1

Distribution.

l

RPC (E-Mail)

Project Manager, NRR w/enci

'J. Caldwell, w/enci

i

.

. C.' Pederson, w/ encl

B. Clayton, w/enct

SRI Perry, w/enci

DRP w/enct

TSS (2) w/enci

DRS w/enci

Rlli PRR w/enci

-

PUBLIC IE-01 w/ enc! .

Docket File w/enci

!

GREENS

,

IEO (E-Mail)

,

DOCDESK (E-Mail)

l

0600 %

$

,

l .-

I

,

.-.

,.

.