Forwards Insp Repts 50-352/97-07 & 50-353/97-07 on 970722-0915 & Nov.Insp Consisted of Selective Exams of Procedures & Representative Records
ML20198N165
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/27/1997
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20198N168 List:
References
50-352-97-07, 50-352-97-7, 50-353-97-07, 50-353-97-7, NUDOCS 9711030170
Download: ML20198N165 (3)


See also: IR 05000352/1997007

Text

.

October 27,1997

Mr. D. M. Smith, President

PECO Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087 0195

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50 352/97 07, 50-353/97 07

NOTICE OF VIOLATION

Dear Mr. Smith:

This refers to the inspection conducted on July 22,1997, through September 15,1997, at

your Limerick Units 1 and 2 reactor facilities. The enclosed report presents the results of

this inspection.

During the 8 week period covered by this inspect.'on period, your conduct of activities at

the Limerick 1 and 2 facilitics was generally characteriz9d by safe and conservative

operations. However, the inspector noted that some chronic system problems, associated

with the D21 emergency diesel generator, the reactor w6ter cleanup system, and the Unit

1 reactor core isolation cooling system, challenged operators during this period.

-Your radioactive liquid and gaseous effluent control programs were inspected by a Region I

radiation specialist during this inspection period. This inspection consisted of selective

examinations of procedures and representative records, interviews with personnel, and

observations by the inspector. This program area was noted as being wellimplemented.

Based on the results of this inspection, the NRC has determined that violations of NRC

requirements occurred. The violations are cited in the enclosed Notice of Violation (Notice)

and the circumstances surrounding hem are described in detailin the subject inspectie

report. The first violation is of concern because there were a number of valves identified

by the NRC and then operations personnel as inadequately locked or with loose chains.

The second violation is of concern since it was programmatic since it required broader

corrective actions to address identified issues associated with the Foreign Material

Exclusion (FME) Program. You are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

/

l

1

i

i

9711030170 971

7

PDR

ADOCK 0

3f"2

G

PDR

l

$$

fI

'

.

_ _ _ _ _ . _ . . _ _ -

_ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ . _ _ _ - _ _ . . _ _ _ _ -

'

<

.

i

Mr. D. M. Smith

2

,

j

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

'

its enclosure (s), and your response will be placed in the NRC Public Document Room

'

(PDR).

i

2

Sincerely,

i

i

ORIGINAL SIGNED BY:

i

Clifford J. Anderson, Chief

Projects Branch 4

l

Division of Reactor Projects

4

Docket Nos.: 50-352, 50 353

License Nos: NPF-39, NPF 85

i

Enclosures:

I

1.

Notice of Violation

2.

NRC Inspection Report 50 352/97-07, 50 353/97-07

[

cc w/encls:

G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing

W. MacFarland, Vice President - Limerick Generating Station

!

J. L. Kantner, Manager, Experience Assessment

'

Secretary, Nuclear Committee of the Board

Commonwealth of Pennsylvania

i

!

,

l

,

1

,,-.-

- . - - , , , . . ,

,

- . - , , , . - . -

,,-..,.n,,--,

.

- - , . .

v-,---

,~

..-s

- - , , - , , - - - , -~

,-nn

...-- ,- ~ -

.

-

. ..

- -.. -

- . .-

_. -

--_.

-~ .

_ . _ -

..-..

._- - .

.

Mr. D. M. Smith

3

Distribution w/encis:

Region i Docket Room (with concurrences)

H. Miller, RA/W. Axelson, DRA (irs)

P. Swetland, DRP

.

A. Keatley, DRP

'

NRC Resident inspector

i

Nuclear Safety Information Center (NSIC)

PUBLIC

Distritration w/encts: (Via E Mail)

W. Dean, OEDO

F. Rinaldi, NRR

J. Stolz, PDl 2, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

,

.

(

J

d

l

DOCUMENT NAME: G:\\ BRANCH 4\\ LIM 9707. INS

To recolve a copy of this document, Indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

l OFFICE

Rl/DRP

Rl/DRP

/

lNAME

PSwetland (# tri

CAnderpon 6/6

lDATE

10/24/97

/p/o 9/c/7

OFFICIAL RECORD COPY

_

_

. .

_

-

.

. . . . -

.