ML20198N105

From kanterella
Jump to navigation Jump to search
Discusses 970915 Telcon W/T Fish & D Roy Re Arrangements for NRC Insp of Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 971117
ML20198N105
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/27/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T, Harpster T
NORTHEAST UTILITIES SERVICE CO.
References
NUDOCS 9711030052
Download: ML20198N105 (3)


Text

--.

0 W

6 October 27, 1997

~l.

r Mr. Ted C. Feigenbaum -

Executive Vice President and Chlef Nuclear Officer Northeast Utilities Service Company clo Mr. Terry L. Harpster P.O. Box 128 -

Waterford, CT 00385

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Feigenbaum:

In a telephone conversation on September 15,1997, Mr. T. Fish and Mr. D. Roy made arrangements for the NRC to inspect the licensed operator requalification program at the Seabrook Station. Thc inspection is planned for the week of November 17,1997, which coincides with your regularly-scheduled requalification examination cycle. The staff at your.

facility should prepare and conduct the requalification examinations in accordance with your NRC approved requalification program.

in accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs, in order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by November 11,1997. Mr. Roy has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information coUections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number.3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviuwing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC.20555-0001, or by internet -

electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory' Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, I

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a

% g h

collection of information unless it displays a currently valid OMB control number.

-d'.

/ }.d

.h 9711030052 971027 PDR ADOCK 05000443 g

hkkk

Mr. Ted C. Feigenbaum 2

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5211 ; Internet address GWM@NRC. GOV.

Sincerely, t

Glenn W. Meyer, Chief Operator Licensing and Human Performance BrancF

{

Division of Reactor Safety Docket No. 50-443 cc B. D. Kenyon, President - Nuclear Group D. M. Goebel, Vice President - Nuclear Oversight F. C. Rothen, Vice President - Work Services l

D. B. Amerine, Vice President - Nuclear Engineering & Support Officer R. N. Johannes, Director - Nuclear Training B. L. Drawbridge, Executive Director - Services & Senior Site Officer A. M. Callendrelio, Licensing Manager - Seabrook Station W. A. DiProfio, Nuclear Unit Director - Seabrook Station R. E. Hickok, Nuclear Training Manager - Seabrook Station L. M, Cuoco, Senior Nuclear Counsel W. D. Meinert, Nuclear Engineer D. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. P. Forbes, Director, Nuclear Safety, Massachusetts Emergency Management Agency F. W. Getman, Jr., Vice President and General Counsel Great Bay Power Corporation Commonwealth of Massachusetts, SLO Designee R. Hallisey, Director, Dept, of Public Health, Commonwealth of Massachus 2

Seacoast Anti-Pollution League State of New Hampshire, SLO D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States i

[.

Mr. Charles H. Cruse 3

Distrioution:

c Region l Dockot Room (with concurrences)

PUBLIC '

Nuclear Safety information Center (NSIC)

NRC Resident inspector R. Conte, DRP-E. Conner, DRP C. O'Daniell, DRP T. Fish, DRS-K. Kennedy, OEDO A. V'eng, PD I 3, NRR

. A. DeAgazio, PD l 3, NRR R. Correia, NRR (RPC)

F. Talbot, NRR D. Screnci,. PAO, ORA Inspection Program Branch, NRR (IPAS)

OL Facility File DOCDESK 1

+

  • i

(

4

- DOCUMENT NAME: A:OLREQ.SB To receive a enpy of this document, lodicate la the bou "C" = Copy without attachment / enclosure

'E' = Copy with attachment / enclosure N" = No copy OFFICE.

Rl/DRS Rl/DRS l

All Rl/

l Rll NAME (, TFish GMeyer (,

DATEfy 10/27/97 -

10V/97 f 10/-/97 10/ = /97 10/ /97

.GFFICIAL RECORD COPY t

--,w-a u

,,.a

-m-

--e..

.-v..-.

.e a~

-, =