ML20198N011
ML20198N011 | |
Person / Time | |
---|---|
Site: | McGuire, 05000000 |
Issue date: | 07/24/1985 |
From: | Uryc B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML20198M785 | List:
|
References | |
FOIA-85-654 NUDOCS 8606050473 | |
Download: ML20198N011 (1) | |
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217L7171999-10-22022 October 1999
[Table view]Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J1181999-06-14014 June 1999 Forwards Documents That Were Transmitted by Fax on 990614 to a Jones-Young Re Issues to Be Discussed in Upcoming Telcon Re DPC Response to GL 98-04 ML20207G3661999-06-0909 June 1999 Reissued Notification with Date Change of 990618 Meeting with DPC in Rockville,Maryland to Discuss Compensatory Actions (Allowed Outage Time) for McGuire Nuclear Station ML20207E7741999-06-0202 June 1999 Notification of 990617 Meeting with Util in Rockville,Md to Discuss Compensatory Actions (AOT) for McGuire Nuclear Station ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20205H9131999-03-24024 March 1999 Forwards NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205 ML20199B0491999-01-11011 January 1999 Notification of 990127 Meeting with Duke Energy Corp in Rockville,Md to Discuss License Amend for Taking Credit for Soluble Boron & Boraflex ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20153E0781998-09-23023 September 1998 Revised Notification of 981016 Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Revised to Change Date & Room Number ML20154L0811998-09-23023 September 1998 Notification of 981016 Meeting with Util in Rockville,Md to Discuss Recent Site Performance Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Has Been Cancelled ML20151X1931998-09-14014 September 1998 Notification of 981006 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20249B6241998-06-19019 June 1998 Forwards Draft SE Re Relocation of Meteorological Tower for Plant ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20199A4781998-01-22022 January 1998 Notification of 980204 Meeting W/Util in Rockville,Md to Discuss Staff Recent RAI Re Snubbers ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198S8131997-10-30030 October 1997 Notification of 971118 Meeting W/Util to Discuss Specific Aspects of Dual Unit Trip & Licensee Corrective Actions ML20198K1961997-10-16016 October 1997 Notification of 971030 Meeting W/Util in Rockville,Md to Discuss Matters Re Proposed Improved TSs for Catawba & McGuire ML20210M8231997-08-22022 August 1997 Forwards Signed Original of Subject Order Attached for Transmittal to Ofc of Fr for Publication.W/O Encl ML20141B3041997-06-20020 June 1997 Notification of 970709 Meeting W/Util in Huntersville,Nc to Discuss Licensee Revs to 1996 Plant UFSAR & How 1996 Rev Complies w/10CFR50.71 ML20206L5711997-01-16016 January 1997 Discusses Grinell Snubbers for Use in Steam Generator Replacement Project.Snubbers Did Not Meet Purchase Specifications for Environ Conditions ML20129H7401996-08-29029 August 1996 Ack Receipt of 960801 Memo Re Reactor Trip Breaker Problems at Plants.Recommended That AEOD or Appropriate Group within NRR Advise OE Whether Technical Staff Considers That Violations Occurred,Per 10CFR50.73 or 10CFR21 ML20128Q2431996-08-0101 August 1996 Discusses Concerns Raised During 960722 AEOD Program Review Re Reportability of Reactor Trip Breaker Problems at Plants NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E0261994-01-0404 January 1994 Notification of 940105 Meeting W/Util in Rockville,Md to Conduct AIT Meeting & Discuss Results of Licensee Investigation of Recent Loss of off-site Power Event at McGuire Plant ML20058J5061993-11-29029 November 1993 Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400 ML20058J4911993-11-24024 November 1993 Notification of Significant Licensee Meeting W/Util on 931206 to Discuss self-assessment of Plant Performance Since 930802-1130 ML20058C9631993-11-19019 November 1993 Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project ML20057D1651993-09-27027 September 1993 Notification of 930929 Meeting W/B&W in Rockville,Md to Discuss Installation Process Used for B&W Kinetic Sleeves at McGuire Nuclear Station ML20057C5441993-09-23023 September 1993 Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation of Unit 1 SG Tube Leaks & Util Actions as a Result of Findings from Investigation ML20056H3141993-08-24024 August 1993 Forwards Safety Evaluation Accepting Critical Aspects of Proposed TS Changes Involving Increasing Min Rswt Boron Concentrations from 2,000 Ppm to 2,275 Ppm & Increasing Min Cla Boron Concentration from 1,900 Ppm to 2,000 Ppm ML20134B2531993-02-11011 February 1993 Responds to 930113 Request for Exceptions to N+1 Policy for Listed Plants.Approved Exceptions W/Stated Conditions Effective for Period of 2 Yrs ML20128G8201993-02-0101 February 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Discuss Enforcment Conference on Safeguards Issues ML20126F2821992-12-24024 December 1992 Forwards Description of Valves Affected by Stroke Testing & Effect of Valves Being Opened or Closed During Testing,W/ Respect to Encl LER 369/90-022-1 Re RHR Sys Being Inoperable ML20128A0361992-11-30030 November 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Status of Licensees Plans to Implement Pilot Program for Use of Seismic Stops in Lieu of Snubbers at Plant ML20059H7861990-09-10010 September 1990 Forwards Revised Resolution of Plant-Specific Differing Prof Opinion (DPO) Issues Concerning McGuire Tech Specs, in Support of Completion of Dpos,Per Author 891229 Memo.Actions Re Tech Specs Listed ML20055D9791990-07-0505 July 1990 Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20246P6001989-09-0505 September 1989 Notification of 890907 Site Visit & Meeting W/Util to Observe Existing Corrosion of Unit 1 Steel Containment Vessel & Discuss Adequacy of Remaining Wall Thickness for Units 1 & 2 ML20246B8381989-08-22022 August 1989 Notification of 890831 Meeting W/Util in Rockville,Md to Discuss Util Findings from Steam Generator Tubes & Plugs Inspected During Present Refueling Outage of Unit 2 from Earlier Related Metallurgical Analyses of Unit 1 Specimens ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR 1999-09-30 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217L7171999-10-22022 October 1999
[Table view]Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J1181999-06-14014 June 1999 Forwards Documents That Were Transmitted by Fax on 990614 to a Jones-Young Re Issues to Be Discussed in Upcoming Telcon Re DPC Response to GL 98-04 ML20207G3661999-06-0909 June 1999 Reissued Notification with Date Change of 990618 Meeting with DPC in Rockville,Maryland to Discuss Compensatory Actions (Allowed Outage Time) for McGuire Nuclear Station ML20207E7741999-06-0202 June 1999 Notification of 990617 Meeting with Util in Rockville,Md to Discuss Compensatory Actions (AOT) for McGuire Nuclear Station ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20205H9131999-03-24024 March 1999 Forwards NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205 ML20199B0491999-01-11011 January 1999 Notification of 990127 Meeting with Duke Energy Corp in Rockville,Md to Discuss License Amend for Taking Credit for Soluble Boron & Boraflex ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154L0811998-09-23023 September 1998 Notification of 981016 Meeting with Util in Rockville,Md to Discuss Recent Site Performance Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Has Been Cancelled ML20153E0781998-09-23023 September 1998 Revised Notification of 981016 Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Revised to Change Date & Room Number ML20151X1931998-09-14014 September 1998 Notification of 981006 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20249B6241998-06-19019 June 1998 Forwards Draft SE Re Relocation of Meteorological Tower for Plant ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20199A4781998-01-22022 January 1998 Notification of 980204 Meeting W/Util in Rockville,Md to Discuss Staff Recent RAI Re Snubbers ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198S8131997-10-30030 October 1997 Notification of 971118 Meeting W/Util to Discuss Specific Aspects of Dual Unit Trip & Licensee Corrective Actions ML20198K1961997-10-16016 October 1997 Notification of 971030 Meeting W/Util in Rockville,Md to Discuss Matters Re Proposed Improved TSs for Catawba & McGuire ML20210M8231997-08-22022 August 1997 Forwards Signed Original of Subject Order Attached for Transmittal to Ofc of Fr for Publication.W/O Encl ML20141B3041997-06-20020 June 1997 Notification of 970709 Meeting W/Util in Huntersville,Nc to Discuss Licensee Revs to 1996 Plant UFSAR & How 1996 Rev Complies w/10CFR50.71 ML20206L5711997-01-16016 January 1997 Discusses Grinell Snubbers for Use in Steam Generator Replacement Project.Snubbers Did Not Meet Purchase Specifications for Environ Conditions ML20129H7401996-08-29029 August 1996 Ack Receipt of 960801 Memo Re Reactor Trip Breaker Problems at Plants.Recommended That AEOD or Appropriate Group within NRR Advise OE Whether Technical Staff Considers That Violations Occurred,Per 10CFR50.73 or 10CFR21 ML20128Q2431996-08-0101 August 1996 Discusses Concerns Raised During 960722 AEOD Program Review Re Reportability of Reactor Trip Breaker Problems at Plants NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E0261994-01-0404 January 1994 Notification of 940105 Meeting W/Util in Rockville,Md to Conduct AIT Meeting & Discuss Results of Licensee Investigation of Recent Loss of off-site Power Event at McGuire Plant ML20058J5061993-11-29029 November 1993 Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400 ML20058J4911993-11-24024 November 1993 Notification of Significant Licensee Meeting W/Util on 931206 to Discuss self-assessment of Plant Performance Since 930802-1130 ML20058C9631993-11-19019 November 1993 Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project ML20057D1651993-09-27027 September 1993 Notification of 930929 Meeting W/B&W in Rockville,Md to Discuss Installation Process Used for B&W Kinetic Sleeves at McGuire Nuclear Station ML20057C5441993-09-23023 September 1993 Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation of Unit 1 SG Tube Leaks & Util Actions as a Result of Findings from Investigation ML20056H3141993-08-24024 August 1993 Forwards Safety Evaluation Accepting Critical Aspects of Proposed TS Changes Involving Increasing Min Rswt Boron Concentrations from 2,000 Ppm to 2,275 Ppm & Increasing Min Cla Boron Concentration from 1,900 Ppm to 2,000 Ppm ML20134B2531993-02-11011 February 1993 Responds to 930113 Request for Exceptions to N+1 Policy for Listed Plants.Approved Exceptions W/Stated Conditions Effective for Period of 2 Yrs ML20128G8201993-02-0101 February 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Discuss Enforcment Conference on Safeguards Issues ML20126F2821992-12-24024 December 1992 Forwards Description of Valves Affected by Stroke Testing & Effect of Valves Being Opened or Closed During Testing,W/ Respect to Encl LER 369/90-022-1 Re RHR Sys Being Inoperable ML20128A0361992-11-30030 November 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Status of Licensees Plans to Implement Pilot Program for Use of Seismic Stops in Lieu of Snubbers at Plant ML20059H7861990-09-10010 September 1990 Forwards Revised Resolution of Plant-Specific Differing Prof Opinion (DPO) Issues Concerning McGuire Tech Specs, in Support of Completion of Dpos,Per Author 891229 Memo.Actions Re Tech Specs Listed ML20055D9791990-07-0505 July 1990 Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20246P6001989-09-0505 September 1989 Notification of 890907 Site Visit & Meeting W/Util to Observe Existing Corrosion of Unit 1 Steel Containment Vessel & Discuss Adequacy of Remaining Wall Thickness for Units 1 & 2 ML20246B8381989-08-22022 August 1989 Notification of 890831 Meeting W/Util in Rockville,Md to Discuss Util Findings from Steam Generator Tubes & Plugs Inspected During Present Refueling Outage of Unit 2 from Earlier Related Metallurgical Analyses of Unit 1 Specimens ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR 1999-09-30 |
Text
l" l' l JUL 2 4 285 i
MEMORANDUM FOR: R. Walker, Director Division of Reactor Projects FROM: B. Uryc, Investigation / Allegation Coordinator
SUBJECT:
WESTINGHOUSE - ALLEGED FAILURE TO REPORT ITEM UNDER 10CFR21.
CASE NO: RII-85-A-0061 On May 9, 1985, a licensee Instrument and Electronic Engineer contacted the Senior Resident Inspector at the McGuire Nuclear Plant and expressed a concern about the perceived unwillingness on the part of Westinghouse to file a Part 21 report, or take similar action .to place in the public domain, the information referred to in LER~
369/85-05. The individual stated to the SRI that it was his opinion that Westinghouse knows that the subject is generic, but will not in-form the industry.
On May 14, 1985, the SRI contacted the Westinghouse representative at the plant site and during conversation with the representative and subsequent review of the Westinghouse technical bulletins, the SRI could find no reference to the subject of the LER.
This information is provided for your review and evaluation to deter-mine if there is any merit to this concern. If not, I will close the.
case file and advise the SRI of the results of the Regional evaluation so that he can so advise the concerned engineer.
I have also included a document that I recently received from S. Elrod and information documented on page 3, paragraph 2, may have some bearing on this particular issue.
I have entered a tracking date of August 30, 1985 for this matter in the Region II Allegation Tracking System.
As always, your assistance and cooperation is greatly appreciated.
$4 Bruno Uryc ff /C -
YW . %
Enclosure:
- 1. LER 369/85-05 '
[W4AM/or L
- 2. Letter, ALGR to Director, ILE, 12 pages, dated June 17, 1985
.y t w ,c 4 4< a k ~.
cc: ARC g /.5 M .
8606050473 860527 eDR FOIa PDR h,/
l DOHERTY85-654 ,