Text
_-. _ __ _ _ ___ _. _ _ __.__.__ _ _ _ _ ___ _ _ _ _.
m._.
~
i i
Barge M Lunciy "
- i-..
g/
Den K. Schepter t-Vee Prevdent 312 269-6078 j
October 24,1997 i
4 Project No. 9683100 i
i -[
_ Docket No.80-423 1'
' Northeast Nuclear Energy Company Millstone Nuclear Power Station, Unit No. 3 j
independent Corrective Adion Vortfication Program i
I L
' United States Nuclear Regulatory Commission Attention: Document Control Desk
. Washington, D. C. 20555 -
4 The Nuclear Regulatory Commission staff has requested that Sargent & Lundy (S&L) prepare and submit on the docket a report on the status and expeded completion of the Millstone Unit 3 ICAVP every two weeks. This is the first of those reports.
At the status meeting held at Millstone on Odober 21,1997, S&L presented the following milestone schedule for the remaining Work:
Tier i Wave 1 System Review Complete 10/31/97 I
Tier 1 Wave 2 System Review Complete 11/30/97 Tier 2 Review Complete '
10/31/97 Tier 3 Review Complete.
10/31/97 l
Final Report lasue
.12/30/97
- These forecast dates were based on the assumptions that the response to Request for
~ Information (RFl) 336 would be received by 10/21/97 and that the responses to all otner Tier i Weve 1 and Tier 2 and 3 RFis would be received by 10/24/97. -
l
- On the following day, October 22, an ICAVP working meeting was held with Northeast Utilities
' (NU), NRC Staff, and S&L for NU to describe 'ho current status of various, programs and on00ing corrective actions which may impact the Unit 3 ICAVP review process. The information presented at that meeting Indicated that significant corrective actions were still ongoing on the Tier 1 Wave 1 systems (R88 ano SWP) and or motor operated valves (MOVs) on all systems.
NU provided their schedule information on when the RSS modifications and the SWP calculations would be completed and available for 84L review as part of the ICAVP. - These dates ranged from the early November to late November, in addition S&L identified and 8
- requested a number cf NU documents that were referenced during the NU presentations. These gg documents are expeded in Chicago on 10/25/97 or 10/27/97.
j 55 East Montce Street
- Chicago. IL 60603-5780 USA
- 312 269 2000
..- ~._...-_- -.-
/
I United States Nuclear Regulatory Commission Odober 24,1997 Document Control Desk Project No. 9583100 Page 2 The imped of the information provided at this meeting is that the S&L forecast dates for completion of the Tier 1 reviews provided the previous.1ay and as noted above are no longer valid. G&L will attempt to complete the Tier 1 reviews prior to 12/15/97 so that the NRC in scope
,r reviews can begir, as currently scheduled. A more definitive schedule will be provided after we have had a better chance to review some of the information being provided by 10/27/97. The Tier 2 and Tier 3 reviews appear to be unaffected by this new information, and the dates provided on 10/21/d7 and shown above are still valid, A copy of the slidec fcmi the status presentation on 10/21/97 are enclosed. A set of charts that track the review of NU resolutions to the Discrepancy Reports will be provided on the next status report.
Please direct any questions to me.
Yours very truly,
$w
^
9
~
Don K. Schopfer g
Vice President and ICAVP Manager DKS:spr Copies:
E. V. Imbro (1/4) Deputy Director, ICAVP Oversight T. Concannon (t/2) Nuc! ear Energy Advisory Council J. Fougere (1/3) NU m2avgnooreShnr1024 e. doc
MILLSTONE UNIT 3 INDEPENDENT CORRECTIVE ACTION VERIFICATION PROGRAM STATUS REVIEW MEETING OCTOBER 21,1997 l
g(j
-.:j,-
Staffing Verification Team Manager-1 System Review Group Configuration Review Group - 11 Operations Review Group - 11 Accident Review Group - 9 Programmatic Review Group - 6 Total 86 - Full Time PD & Internal Review Committee - 5 (part time)
A{$
h~
1
~
e l'
l-l Tier 1 System Grouping
- SWP Service Water QSS / RSS - Quench Spray Recirculation Spray Refueling Water Storage Tank HVX - Auxiliary Rullding HVAC Supplemental Leakage Collection & Release
- Emergency Diesel Generator Room Ventilation DGX Emergency Diesel Engine and Generator EDG Exhaust & Misc, instrumentation EDG Lubricating Oil System
- EDG Fuel Oil System EDG Starting Air System
- EDG Sequencer
- 4160 Volt Electrical Distribution System
- d. _
AIt'.
A Project Milestone Schedule 4
Tier 1 Wave 1 System Review Complete 10/31/97 Tier 1 Wave 2 System Review Complete 11/31/97-Tier 2 Review Complete 10/31/97 Tier 3 Review Complete 10/31/97 Final Report issue 12/30/97 A.
2 i
m
.l Tier 1 Schedule Activity Wave 1 WaYe 2
[
System Reviews 10/31/97 11/31/97 System / Mod Walkdowns Complete 11/31/97 4
O&M and Testing Reviews 10/31/97 11/31/97-Corrective Action Reviews 10/24/97 11/31/97 Assumes that RFI 336 Lists are received by 10/21/97 Assumes that all other Wave 1 RFis are received by 10/24/97 I
Jlh
~
_ Tier 1 - System Review Status SWP QSS/RSS Total.
Total.
... Pop. j Compj. Pop. j Comp
................... _ System Boundary Definition N/A. 100%
N/A ;100%
Document Gathering (RFii)~ YA'50d5~ 'N/A[i665" l 100%
Screen NU CMP Findings N/A i100%
N/A
~Idesify~Sysiemhequire.
~ 55~ [icos" ~i485fiOO5" 6
Caiculaifon" Reviews
~iC~965~ ~A45"~955" Component Reviews 1535 100%
1681 97 %
' Drawing Reviews 173l100'5 201 100 %
Topical Raviews 2
75%
0 N/A
_.._....._.....a......_.................a................
.....Disposifon System Require.
655 l 81 %
1485 i-78%
..... - -......d Reviews.,
.....,......j......../....
74 35 %
7 - AN I
Y 3
t Tier 1 - System Review Status HVX DGX
.~
..................................._..........._.............. Pop y Com pi Po p. Com p_
System Boundary Definition N/A 100 %
N/A 100 %
" 6iuseniGathering(RFisj"
" WIA"""i66W~~~Rik'~tT66W Screen NU CMP Findings N/A 100 %
N/A 100 %
Identify System Require.
700 48 %
160 72%
Calculation Reviews 429 15%
496 19%
" dom %neriiReviews "i755"~56W~l685"""55W Topical Reviews 3
0%
2 0%
' Dispos' tion"Sisiem Riquire,
~ 66" ~20W ~700~~""5C i
7 Aw F
Tier 1 - Physical Configuration Review Status sWP QSS/RSS
.._.... Pop. !. Comp.!. Pop,. [ Comp _
... ~... Scope Walkdown Boundary 1726 100% 1497_ 100%
Dwas
~ idiiheWaE55Uwgi" ' "665 "=IOO W ~45 T "iOO W R
'PhysicafE5/g Review vs.
"'f3I" {"iOOW ~75f'IOOW Upper Tier Dwgs FU55tionaIWaiEdwns "ii45TI60 C ~857 '"IOO W (No. of Dwgs)
Madification Walkdowns 48 100%-
6 100%
,(N.o. cf Llods)_
w.
4
_ __u
Tier 1 - Physical Configuration Review Status HVX DGX Total Total Pop... Comp;,,90mp.gomp_
. Scope Walkdown Boundary 1177 48%
1357 15%
Dwgs Redline Walkdown Dwgs 264 15%
135 2%
"Eiiysical Dwg Review vs.
335 31 %
450 10W Upper Tier Dwgs Functional Walkdowns 735 25 %
617 0%
(No. of Dwgs)
M6dificailoriWaidowns 16" ' '0%"
" 58" "0%
_(No. of. Mods) _
g
-- Ag-Tier 1 - O&M & Testing Review Status SWP QSS/RSS
. Pop.. Comp. Pop.jComp.
System Boundary Definition N/A 100 % N/A l 100%
Documeiij Gathering (RFisf "'N/h" ~98%"' ~ N/A"I"98%
Screen NU CMP Findings N/A 100 % N/A j 100%
Identify System Require.
102 100 % 175 l 100%
OPS /M.iint/TesEng/ Training
~294 "i7% ~435" ~37%
Procedure Reviews Disposition Systern Require.
' 102" ^ '73W ~175'"I46 % ".
~
.,......r.
- Plus 20% on hold for RFI
" Plus 18% on hold for RFI t
5
Tier 1 - O&M & Testing Review Status HVX DGX Total Total Pop. ; Comp - Pop. Comp System Boundary Definition N/A 100 %
N/A 100 %
Document Gathering (RFis)
N/A 75 %
N/A 75 %
Screen NU CMP Findings N/A 85%
N/A 85%
Identify System Require.
78 78%
90 66 %
OPS /Niaidt/TUtinNraining
~ I7"~ ~dWo' ~393 ~ ~ 5~
1 8
Procedure Reviews DispositioriSystem Requlie.
"78~
~8%"
"90~
~ 6 *S"
' od Reviews
~26"
" O'S
~58~
0*5 M
A 4ip M'~
3 i
1 Tier 1 - Programmatic Review Status Corrective Action Reviews UlRs ACR/CRs I
SYSTEMS Total.
Total Pop. l Comp; Pop. Comp SWP 210 96 %
254*
75%
DGX 340 97 %
238 96 %
TdiALS 861 57@o 675-84 %
- Additonalitems added as a result of NRC audit: SWP - 177 QSS/RSS - 70
)
~
6
I 4
Tier 1 - Programmatic Review Status i
182 DDRs apply to ICAVP systems
- 61 remain for review after screening
- List sent to NU on 10/17/97 l
- Screening criteria and resulting list sent to NRC
- Working with NU to find a smarter way to obtain and review the DDRs
- Expected completion 1 week after obtaining the DDRs i
b A$$
~
Tier 2 J Accident Mitigation Review Status i Crttical Characteristics No. ! Compi Prog. Start j
FSAR Section 15.1 51 49 2
0 FSAR Section 15.2 j 39 35 4
0 FS^R"5ectioiiiST
~I 9~ ~ ~ ~
T ~^ T 2
9 7ggg ggg gg3 - -
- gg-gg
-, ~ -- - g- -
FS AR Section 15.5 7
7 0
0 FSAR Section 15.6 49 K
13 0
"F5^R SEtion T5'7 '
"i6~I"If ~s ~
~0~
~
FS^R'Secfion T5.8'
~ l' T
~f "0"~
...s...
.............,........'1 16 pendog RFI response 16 handled in SRG
,,,.3
,(
)gp.
7 7
)
Tier 2 - Schedule I
Completion will be 1 week after receipt of information - 10/31/97 assuming all information can be provided by 10/24/97 4
1' Jt;3.
7 ~
Tier 3 - Programmatic Review Scope Current change process - Complete Current change implementation'- In process NRC Sample of CA documents -In process Past changes -In process Jlh
~ "~~~
8
Tier 3 - Programmatic Review Status Additional Corrective Action items for Review 71 Documents (LERs, OIRs, ACRs/CRs, UIRs)
- RFI 460 issued; partial response received
- 4 of 8 OlRs not scheduled for closure l
- 7 of 14 UlRs not scheduled for closure
- 7 items not yet provided 35 E&DCRs - 100% Complete
~
4 t
Tier 3 - Programmatic Review Status Past Change Reviews Sample Docs
..... Size -
Compi Nee.ded?
.......... _. -. Procedures 70 45%
Yes
. Temporary Alts.
80%_
Yes 25
,, Licensing Documents 24 95 %
Yes Vendor Manuals 3
100%
No uke-for-Like Replacements 16 100 %
No
.Setpoints,
40.,
5%
Yes _
MEPL Determinations 16 100 %
No
.Comm. Grade Dedications
..16 100%
_,No
..sSection XI Repairs and Repimnts 10 50%
Yes l
4le 3
r 9
y
l Tier 3 - PRG Schedule Current change implementation - 10/24/97 NRC Sample of CA Documents - 10/31/97 Past Change reviews --1 Week ARI 4
d$
Y~
Discrepancy Summary 565 DRs initiated
[
- 263 Valid DRs issued to NRC/NUINEAC.
58 DRs considered invalid 244 DRs in process
- 107 NU Resolutions entered into database
- 26 NU Resolutions reviewed by S&L
- 23 Accepted
-3 Not accepted Of the 23 Acceptable resolutions
- 4 Previously Identified by NU.
- 5 Non-discrepant conditions
~
)
10
h Discrepancy Summary NRC Significance Level for the 263 issued DRs i
0 Level 1 0
Level 2 55 Level 3
+ 208 Level 4 i
.jjj 3
Discrepancy Type & Level Summary i-Disempancy Type Level 3 Level 4
. Calculations -
24 67 Component Data 4
11 Corrective Actions 5
16 Design Change Process 7
3 Drawings 1
38 installation implemenmtation 4
22 Installation Regiurements 0
3 Licensing Documents 9
33 O&M and Testing implementation 0
1 O&M and Testing Procedures 0
10 I
Procedure implementation 1
1 Testing implementation 0
2 Testing Requirements 0
1 4
)3
~I~
11