ML20198M792

From kanterella
Jump to navigation Jump to search
Rev 1 to ANO-1 Cycle 14 to Colr
ML20198M792
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/12/1998
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20198M765 List:
References
95-R-1025-03, 95-R-1025-03-R01, 95-R-1025-3, 95-R-1025-3-R1, NUDOCS 9801200121
Download: ML20198M792 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ - _ - -

i . .

a Table Of Contents Pace Fig. 1 A Rod Position Setpoints for Four Pump Operation From 0 to 200 10 EFPD

- ANO-1 Cycle 14.. . . .4 Fig. 1 B Rod Position Setpoints for Four Pump Operation From 200 10 EFPD to EOC

- ANO 1 Cycle 14.. .5 Fig. I-C Rod Position Setpoints for Four-Pump Operation From 400 EFPD to EOC

- ANO-l Cycle 14, including a Known Inoperable Rod Ll4. . . 5a Fig. 2 A Rod Position Scipoints for Three Pump Operation From o to 200 10 EFPD

- ANO-l Cycle 14.. . .6 Fig. 2-B Rod Position Setpoints for Three-Pump Operation From 200 10 EFPD to EOC

- ANO-l Cycle 14.. . .7 Fig 2-C Rod Position Setpoints for Three-Pump Operation From 400 EFPD to EOC

-- ANO 1 Cycle 14, including a Known Inoperable Rod Ll4. . 7a Fig. 3 A Rod Position Sctpoints for Tuo-Pump Operation From 0 to 200 10 EFPD

-- ANO l Cycle 14.. .8 Fig 3-D Rod Position Scipcints for Two-Pump Operation From 200 t 10 EFPD to EOC

- ANO-1 Cycle 14.. .9 Fig 3-C Rod Position Setpoints for Two-Pump Operation From 400 EFPD to EOC

-- ANO-l Cycle 14. Including a Known inoperable Rod Ll4. . 9a Fig 4 Operational Power imbalance Setpoints for Four-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 14. .10 Fig. 5 Operational Power imbalance Scipoints for Three-Pump Operation From o EFPD to EOC - ANO l Cycle 14. .Ii Fig 6 Operational Pouct Imbalance Setpoints for Two-Pump Operation From o EFPD to EOC -- ANO-l Cycle 14. . 12 Fig. 7 N1L-BSZL and NIL-89ZL LOCA Linear Heat Rate Linutt .13 Fig. S Axial Poucr imbalance Protectisc Limits.. . 14 Fig 9 Protection System Ntasimum Allowable Sctpoints for Axial Pouct imbalance. 15 Fig 10 Vanabic Lou RCS Pressure-Temperature (P-T) Protectisc Linuts.. .16 Fig 1I RCS Pressure-Temperature (P T) Protectne N!asimum Allowable Sctpoints.. .17 KW/FT Limit for Asial Pouct imbalance Protectisc Limits. .18 Altaimum Shutdown N1argin.. .19 Asial Power Shaping Rod Insertion Limits and Sctpoints_ .20 ANO l Cycle 14 Tilt Limits and Setpoints (Quadrant Power Tilt Limits).. .21 Design Nucicar Power Peaking Factors. .22 95.R-1025 4 Revision 1 l

9001200121 980112 COLR i PDR ADOCK 05000313 page 3 of 22 P PDR S

_ - - - - - - - - ------ ----- ~'

-J &

Figure can be used with Technical Specification 3.5.2.2.2 Figure 1-C Rod Position Setpoints for Four-Pump Operation From 400 EFPD to EOC-- ANO-1 Cycle 14 Including a Known Inoperable Rod Ll4 110 (263.3,102) _(268.9.1C2)

OPERATION IN THIS (300,102)

REGION IS NOT ALLOWED OPERATION d

(248.5,90)

RESTRICTED 80 - REGION o (248.5,78) e 70 -

.e ce

$ i.o . SHUTDOWN (181.5,58)

MARGIN (225.5,58)

('

} 3, ,

LIMIT d

$ an -

- PERMISSIBLE OPERATING (114.7,24.1) REGION

~

(102.5,18)

'"~

(9.8, 0) a  : , , ,

0 20 46 60 30 100 120 140 160 180 200 220 240 NO 280 300 Rod index, % withdrawn 0 20 40 60 80 100 I

l l I 1 I GROUP 7

0. 20 40 60 80 100 l i I I I I GROUP 6 0 20 40 60 80 100 l  ! I I GROUP 5 95 R-102540 Revision 1 COLR page 5a of 22
  • r Figure can be used with -

Technical Specification 3.5.2.2.2 Figure 2-C Rod Position Setpoints for Three-Pump Operation From 400 EFPD to EOC- ANO-1 Cycle 14 Including a Known Inoperable Rod Ll4 110 100 <

90 -

80 - (269.8, 77)i OPERATION IN THIS ^ ^

REGION IS NOT OPERATION (264.5,77 3 70 ALLOWED RESTRICTED (300,77) 2 REGION < (248.5,67)

. ,, m.

.{' i(248.5,58) o SHUTDOWN MARGIN p LIMIT (181.5,43.5) (225.5,43) p 40 30 <

(114.2,17.9) PERMISSIBLE 2n . OPERATING (102.5,13.5) io . /

0 0 20 40 60 30 100 120 140 160 18') 200 220 240 200 230 300 Rod Index, % withdrawn 0 20 40 60 80 100 l l l I I I GROUP 7 0 20 40 60 80 100 l  !  ! l  ! I GROUP 6 0 20 40 60 80 100 l l i I l l GROUP 5 95.R- m25 m Revision 1 COLR page 7a of 22

, ., o .

c . .

Figure can be used with Technical Specification 3.5.2.2.2 L Figure 3-C Rod Position Setpoints for Two-Pump Operation From'400 EFPD to EOC- ANO-1 Cycle 14 Including a Known inoperable Rod Ll4 110 100 -

90 -

NO -

2 N

x 70 -

g OPERATION IN THIS

' 60 - REGION IS NOT A

g ALLOWED OPERATION (267,52) J271.2, 5;!)

s. 3a . RESTRICTED ,

e '. I '

REGION 3 < (248.5,44) 40 -

$ SHUTDOWN , (248.5, 38) -

0-MARGIN '

(181.5,29) 30 - LIMIT 225.5, 28) o.

PERMISSIBLE (113.3,11.7) OPERATING I" "

(9,8, 0) 02.5,9) REGION 0 0 ,

0 20 40 60 N0 100 12D 140 1(,0 iho 200 220 240 260 280 300 Rod index. % withdrawn 0 20 40 60 80 100 I I I I I I GROUP 7 0 20 40 60 80 100 l l I I  ! I GROUP 6 0 20 40 60 80 100 l 1 l I I I GROUP 5 95-R-in25-(O Revision !

COLil page 9a of 22

-