ML20198M792

From kanterella
Jump to navigation Jump to search
Rev 1 to ANO-1 Cycle 14 to Colr
ML20198M792
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/12/1998
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20198M765 List:
References
95-R-1025-03, 95-R-1025-03-R01, 95-R-1025-3, 95-R-1025-3-R1, NUDOCS 9801200121
Download: ML20198M792 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ - _ - -

i Table Of Contents a

Pace Fig. 1 A Rod Position Setpoints for Four Pump Operation From 0 to 200 10 EFPD

- ANO-1 Cycle 14..

.4 Fig. 1 B Rod Position Setpoints for Four Pump Operation From 200 10 EFPD to EOC

- ANO 1 Cycle 14..

.5 Fig. I-C Rod Position Setpoints for Four-Pump Operation From 400 EFPD to EOC

- ANO-l Cycle 14, including a Known Inoperable Rod Ll4.

. 5a Fig. 2 A Rod Position Scipoints for Three Pump Operation From o to 200 10 EFPD

- ANO-l Cycle 14..

.6 Fig. 2-B Rod Position Setpoints for Three-Pump Operation From 200 10 EFPD to EOC

- ANO-l Cycle 14..

.7 Fig 2-C Rod Position Setpoints for Three-Pump Operation From 400 EFPD to EOC

-- ANO 1 Cycle 14, including a Known Inoperable Rod Ll4.

. 7a Fig. 3 A Rod Position Sctpoints for Tuo-Pump Operation From 0 to 200 10 EFPD

-- ANO l Cycle 14..

.8 Fig 3-D Rod Position Scipcints for Two-Pump Operation From 200 t 10 EFPD to EOC

- ANO-1 Cycle 14..

.9 Fig 3-C Rod Position Setpoints for Two-Pump Operation From 400 EFPD to EOC

-- ANO-l Cycle 14. Including a Known inoperable Rod Ll4.

. 9a Fig 4 Operational Power imbalance Setpoints for Four-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 14.

.10 Fig. 5 Operational Power imbalance Scipoints for Three-Pump Operation From o EFPD to EOC - ANO l Cycle 14.

.Ii Fig 6 Operational Pouct Imbalance Setpoints for Two-Pump Operation From o EFPD to EOC -- ANO-l Cycle 14.

. 12 Fig. 7 N1L-BSZL and NIL-89ZL LOCA Linear Heat Rate Linutt

.13 Fig. S Axial Poucr imbalance Protectisc Limits..

. 14 Fig 9 Protection System Ntasimum Allowable Sctpoints for Axial Pouct imbalance.

15 Fig 10 Vanabic Lou RCS Pressure-Temperature (P-T) Protectisc Linuts..

.16 Fig 1I RCS Pressure-Temperature (P T) Protectne N!asimum Allowable Sctpoints..

.17 KW/FT Limit for Asial Pouct imbalance Protectisc Limits.

.18 Altaimum Shutdown N1argin..

.19 Asial Power Shaping Rod Insertion Limits and Sctpoints_

.20 ANO l Cycle 14 Tilt Limits and Setpoints (Quadrant Power Tilt Limits)..

.21 Design Nucicar Power Peaking Factors.

.22 95.R-1025 4 Revision 1 l

9001200121 980112 COLR i

PDR ADOCK 05000313 P

PDR page 3 of 22 S


~'

-J Figure can be used with Technical Specification 3.5.2.2.2 Figure 1-C Rod Position Setpoints for Four-Pump Operation From 400 EFPD to EOC-- ANO-1 Cycle 14 Including a Known Inoperable Rod Ll4 110 (263.3,102)

_(268.9.1C2)

(300,102)

OPERATION IN THIS REGION IS NOT ALLOWED OPERATION (248.5,90) d RESTRICTED 80 -

REGION o (248.5,78) e$

70 -

._.e ce$

i.o.

SHUTDOWN (181.5,58)

('

MARGIN (225.5,58)

LIMIT

}

3,,

d an -

PERMISSIBLE OPERATING REGION (114.7,24.1)

~

(102.5,18)

' " ~

(9.8, 0) a 0

20 46 60 30 100 120 140 160 180 200 220 240 NO 280 300 Rod index, % withdrawn 0

20 40 60 80 100 l

l I

1 I

I GROUP 7 0.

20 40 60 80 100 l

i I

I I

I GROUP 6 0

20 40 60 80 100 l

I I

GROUP 5 95 R-102540 Revision 1 COLR page 5a of 22

r Figure can be used with -

Technical Specification 3.5.2.2.2 Figure 2-C Rod Position Setpoints for Three-Pump Operation From 400 EFPD to EOC-ANO-1 Cycle 14 Including a Known Inoperable Rod Ll4 110 100 <

90 -

80 -

OPERATION IN THIS (269.8, 77)i REGION IS NOT OPERATION (264.5,77

^

^

_3 70 ALLOWED RESTRICTED (300,77) 2 REGION (248.5,67) m.

.{'

i(248.5,58) o SHUTDOWN MARGIN p

LIMIT (181.5,43.5)

(225.5,43) p 40 30 <

PERMISSIBLE (114.2,17.9) 2n.

OPERATING (102.5,13.5) io.

/

0 0

20 40 60 30 100 120 140 160 18')

200 220 240 200 230 300 Rod Index, % withdrawn 0

20 40 60 80 100 l

l l

I I

I GROUP 7 0

20 40 60 80 100 l

l I

GROUP 6 0

20 40 60 80 100 l

l i

I l

l GROUP 5 95.R-m25 m Revision 1 COLR page 7a of 22

,., o c

Figure can be used with Technical Specification 3.5.2.2.2 L Figure 3-C Rod Position Setpoints for Two-Pump Operation From'400 EFPD to EOC-ANO-1 Cycle 14 Including a Known inoperable Rod Ll4 110 100 -

90 -

NO -

2 N

70 -

x g

OPERATION IN THIS 60 -

A REGION IS NOT g

ALLOWED OPERATION (267,52)

J271.2, 5;!)

s.

3a.

RESTRICTED I

e '.

REGION 3

(248.5,44) 40 -

SHUTDOWN

, (248.5, 38) -

0-MARGIN (181.5,29) 30 -

LIMIT 225.5, 28)

,o.

PERMISSIBLE (113.3,11.7)

OPERATING I" "

02.5,9)

REGION (9,8, 0) 0 0

0 20 40 60 N0 100 12D 140 1(,0 iho 200 220 240 260 280 300 Rod index. % withdrawn 0

20 40 60 80 100 I

I I

I I

I GROUP 7 0

20 40 60 80 100 l

l I

I I

GROUP 6 0

20 40 60 80 100 l

1 l

I I

I GROUP 5 95-R-in25-(O Revision !

COLil page 9a of 22

-