Submits Revisions to 971113 Interim Response to 970806 Confirmatory Action Ltr on Circuit Breaker Failures at Clinton Power Station
ML20198M696
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/02/1998
From: Jackie Cook
ILLINOIS POWER CO.
To: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20198M365 List:
References
CAL, NUDOCS 9801200088
Download: ML20198M696 (2)


Text

'

Mno s Power Comp ny Chnton Power etabon P O Dos 678 Chnton. IL 01727 Tel 217 935 6623 I

F am 217 935-4G32 John O. Cook Sonor Vice Presnient U-602899 W.190 January 2, 1998 Docket No. 50-461 Mr. A. Bill Beach Regional Adm!nistrator, Region Ill U. S. Nuclear Regulttory Commission 601 Warrenville Road Lisle, Illinois 60532-4351

Subject:

Revision to Interim Response to Confirmatory Action Letter i

on Circuit Dgaker Failures at Clinton Power Station

Dear Mr. Beach:

On November 13,1997, Illinois Power (IP) provided the interim response to the Confirmatory Action Letter dated August 6,1997, concerning the failure of l

Westinghouse DIIP 4160 volt circuit breakers at Clinton Power Station. In that letter, IP committed to perforrr. interim special maintenance on Westinghouse DHP circuit breakers. Incloded in the description of the interim special maintenance was a commitment to perform measurement of the physical characteristics of the circuit breaker's opening springs. IP is discoatinuing performance of this portion of the interim l

special maintenance program.

IP has measured the physical characteristics on thirty-three of the seventy-nine Westinghouse DIIP circuit breakers instr!!cd at CPS. The results of there measurements showed that there is no evidence of general deterioration of spring conditions that could affect the circuit breaker's ability to function reliably until it is l

refurbished within the next three years. The data taken during these inspections confirm l

that the existing springs in the Westinghouse DHP circuit breakers are perfonning as designed. This data is available for your review. Also, timing tests are still being l

performed during the interim special maintenance. Successful completion of these tests l

validate the acceptability of springs in the circuit breaker. Therefore, IP is discontinuing the measurement of the physical characteristics of the Westinghouse DNP circuit breaker's opening springs during the performance of the interim special maintenance procedure 9901200000 900112 PDR ADOCK 05000461 0

PDR JAN 08 He

's U-602899 Page 2 If you have any questions regarding the change in this commitment, please contact Mike Stickney at (217) 935 8881 extension 3421 or Rick Reding at extension 3424.

Sirkerely yours, f)ssyn 9

J.G. Cook Senior Vice President MRS/krk Attachment cc:

John A. Grobe, URNRC, Region III Thomas J. Kozak, USNRC, Region III Geoffrey C. Wright, USNRC, Region III Mark Ring, USNRC, Region III NRC Senior Resident, V-690 Dave Zemel, IDNS Resident Inspector T-31Z 44 e