ML20198L442

From kanterella
Jump to navigation Jump to search

Forwards SER Granting 980102 Request for Relief VRR-4B from Inservice Testing for Point Beach Nuclear Plant,Units 1 & 2, Pursuant to 10CFR50.55a(f)(6)(i) Until End of 1998 Unit 1 Refueling Outage
ML20198L442
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/02/1998
From: Hannon J
NRC (Affiliation Not Assigned)
To: Grigg R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20198L447 List:
References
TAC-MA0346, TAC-MA346, NUDOCS 9801160032
Download: ML20198L442 (2)


Text

.. ~

  • i Mr. Richard R. Grigg Chief Nuclear Officer Anur 2. M8 L Wisconsin Electric Power Company 231 West Michigan Street, Room F379 Milwaukee,WI 53201

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT NOS.1 AND 2 - REQUEST FOR RELIEF VRR 4B FROM INSERVICE TESTING (MA0346)

Dear Mr. Grigg:

The staff has reviewed and evaldated the information provided in your January 2,1998, letter related to Request for Relief VRR-4B from the Point Beach Nuclear Plant, Unita 1 and 2.

Inservice Testing Program.

The staff has determined that for' Relief Request VRRMB, the requirements of the Code are impractical and the relief is granted pursuant to 10 CFR 50.53a(f)(6)(i) until the end of the 1998 Unit i refueling outage (no 16ter than June 30,'1998). The relief granted is authorized by law and will not endanger life or property or the common defense and security and is otherwise in _ 4 the public interest given due consideration to the burden upon Wisconsin Electric that could ~

result if the requirements were imposed on the facility. You should maintain documentation -

supporting the basis for VRR-4BJ' A copy of the Safety Evaluation is enclosed. Please contact Linda Gundrum of my staff if you have any questions regarding this action, Sincerely, Original signed by:

Kevin A, Connaughton Bor:

John N. Hannon, Project Director Project Directorate lll-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc w/ encl: See next page D.lSTRIElUTION See attached page Docket file PUBLIC gg N ,g, h {Ig ] g PDill 1 Reading E. Adensam -

ClJamerson L. Gundrum I OGC

/

G. Hill (4)'-

K, Dempsey- ACRS

, blf J. McCormick-Barger, Rlli .

f

' T. Harris (TLH3), SE only ll l l lllllll,l DOCUMENT NAME: G:\WPDOCS\PTBEACH\WP61\PTBA0346.RR is veceeve a copy of tNa docum mdicaw in trw bon *C" = cocy weout att h.usure T = Cony we attachmenuencpere io copy OFFICE PM:PD31 ,, L E LA:PD31 E C:EMEBs q( OCg(PQFg D:PD31,, , ,,

NAME LGundrurnh CJamerson (3/ RWessmir#W/ /,f///(4p JHann$Fl54, DATE 1/ 4,/98 ~ V 1/A /98 / 1/bl98 1/M98 1/2 /98 S 9001160032 980102 OFFICIAL P,ECORD COP PDR ADOCK 05000266 Q4 owet P PDR ~

L

@. - Mr. Richard R. Grigg Point Beach Nuclear Plant  :

Wisconsin Electric Power Company Unit Nos. i and 2 cc:

Emest L. Blake, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

. Washington, DC 20037 Mr. Scott A. Patuiski Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 1 Mr. Ken Duveneck -

Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7864 Madison, Wisconsin 53707-7854 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60632 4351 Resident inspector's Office U.S. Nudear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241

' Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P,0. Box 7854 Madison, Wisconsin 53707-7854 l

==n wr

. _ _ - - . - - - _ _ _ _ - _ . _ _ _ _ _ _ .