. _ _ _ _ _ - _ _ _ -
Mr. Martin L. Bowling January 7, 1998 l
Recovery Officer - Millstone Unit 2 Northeast Nucle:r Energy Company
]
c/o Ms. Patricia A. Loftue Director - Regulatory Affairs P.O. Box 128 Waterford, CT 06385
SUBJECT:
STATUS CHANGE RELATED TO NEED FOR REACTOR CORE SAFETY LIMITS TECHNICAL SPECIFICATION CHANGE - MILLSTONE NUCLEAR POWER STATION, UNIT 2
Dear Mr. Bowling:
Your staff had previously indicated that are amendment may be needed for the Millstone Nuclear Power Station, Unit 2, Technical Specification (TS) 2.1.1 " Safety Limits - Reactor Core." This determination was based on the initial results of the Configuration Management Plan being implemented at the Unit 2 faci'ity.
By letter dated December 9,1997, you indicated that the current TS for the reactor safety limits have been determined to be acceptable for the current operating cycle (Cycle 13) for Unit 2. It was further noted that the fuel vendor, Siemens Power Corporation, performed the necessary evaluations to support this detemilnation.
We have been tracking this as a potentiallicensing issue required for the restart of Ur;it 2 in the NRC staffs Restart Assessment Plan for the Millstone Station. We will remove this item as a potentiallicensing issue during the next update of the restart plan.
Sincerely, Original signed by:
Daniel G. Mcdonald Jr., Sr. Project Manager Special Projects Office - Licensing Office of Nuclesr Reactor Regulation Docket No. 50-336 cc: See next page DISTRIBUTION:
b
- Docket File?
PUBLIC 4
h,$?(( G)Qf SP ead n 8
LBerry WTravers PMcKee OGC ACRS,i M H
11 HH H I Ill H
JDurr, fil "
11 1,3 I,l ui, II, I,Ill I.I DOCUMENT NAME: G:\\ MCDONALD \\LIC. STATUS g
b recohre a copy of tNe document. Indcate M the boat "C" Copy without attaenmen,u;_ t
- E*. Copy with attachmentrenclosure
- N' = No copy OFFICE SPO-L:PM A
SPO-L:LA(% d SPAL:bD fs m
NAME DMcDonapf AA[ ) LBerry 7 ) (TP%IcRELGME/
DATE 0( &l/98 %
/(]/98
'V at /07/98 "
i
(
OFFICIAL RECORD COPY 9001150025 900107 PDR ADOCK 05000336 P
=.,
gs*n mag p
t UNITED STATES 1
g
,j NUCLEAR REGULATORY COMMISSION o,
WASHINGTON, D.C. 30806 4 001 January 7,1998 Mr. Martin L. Bowling
- Recovery Officer-Millstone Unit 2
. Northeast Nuclear Energy Company c/o Ms. Patricia A. Loftus Director - Regulatory Affairs P.O. Box 128 Waterford, CT 06385
SUBJECT:
STATUS CHANGE RELATED TO NEED FOR REACTOR CORE SAFETY LIMITS TECHNICAL SPECIFICATION CHANGE - MILLSTONE NUCLEAR POWER
- STATION, UNIT 2
Dear Mr. Bowling:
Your staff had previously indicated that an amendment may be needed for the Millstone Nuclear Power Station, Unit 2, Technical Specification (TS) 2.1.1 " Safety Limits - Reactor Core." This determination was based on the initial results of the Configuration Management Plan being implemented at the Unit 2 facility.
By letter dated De cember 9,1997, you indicated that the current TS for the reactor safety limits have been determined to be acceptable for the current operating cycle (Cycle 13) for Unit 2. It was further noted that the fuel vendor, Siemens Power Corporation, performed the necessary evaluations to support this determination.
We have been tracking this as a potentiallicensing issue required for the restart of Unit 2 in the NRC staff's Restart Assessment Plan for the Millstone Station. We will remove this item as a potentiallicensing issue during the next update of the restart plan.
Sincerely,
- -=
Daniel G. Mcdonald Jr., Sr. Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50 336 cc: See next page w
I*
' Northeast Nuclear Energy Company 1 Millstone Nuclear Power Station 5
- Unit 2 -
. cc:
Mr. F. C. Rothen
- Lillian M. Cuoco, Esquire :
- Vice President - Work Services -
_ Senior Nuclear Counsel -
- Northeast Utilities Service Company Northeast Utilities Service Company P. O. Box 128 -
P. O. Box 270;
--Waterford, CT 06385 Hartford, CT 06141-0270 Emest C. Hadley, Esquire Mr. John Buckingham
_1040 B Main Street
. Department of Public Utility Control-P.O. Box 54g Electric Unit -
- West Wareham, MA 02576
- 1C Liberty Square -
New Britain, CT 06051 Mr. D. M. Goebel Vice President Nuclear Oversight Mr. Kevin T. A. McCarthy, Director Northeast Utilities Service Company Monitoring and Radiation Division P. O. Box 128 Department of Environmental Protection Waterford, CT 06385
- 79 Elm Street Hartford, CT 06106-5127 Mr. David Amerine Vice President Nuclear Engineering Regional Administrator, Region I and Support U.S. Nuclear Reg alatory Commission Northeast Utilities Service Company 475 Allendale Road P O. Box 128 King of Prussia, PA 19406 W.erford, CT 06385 First Selectmen Mr. Allan Johanson, Assistant Director Town of Wateiford Office of Policy and Management
- Hall of Records Policy Development and Planning
-200 Boston Post Road Division Waterford, CT 06385 450 Capitol Avenue - MS# 52ERN P. O. Box 341441 Mr. Wayne D.- Lanning Hartford, CT 06134-1441 Deputy Director of Inspections Special Projects Office Mr. M. H. Brothers
- 475 Allendale Road Vice President - Operations King of Prussia, PA 194061415 Northeast Nuclear Energy Company P,0 Box 128 Charles Brinkman, Manager Waterford, CT 06385
- Washington _ Nuclear Operations ABB Combustion Engineering Mr. J. A. Price 12300 Twinbrook Pkwy, Suite 330 Unit Director - Millstone Unit 2 Rockville, MD 20852 Northeast Nuclear Energy Company -
P.O. Box 128
( Senior Resident Inspector -
. Waterford, CT 06385
- Millstone Nuclear Power Station
' clo U.S. Nuclear Power Station -
P.O.. Box 513 Niantic, CT= 06357-
i s.
Northeast Nuclear Energy Company Millstone Nuclear Power Station h
Unit 2 cc:
'Mr. B. D. _ Kenyon Chief Nucler Officer - Millstone Northeast Nuc: Jar Energy Company P.O. Box 128 Waterford, CT 06385 Citizens Regulatory Commission ATTN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, CT 06385 Deborah Katz, President Citizens Awareness Network P. O. Box 83 Shelburne Falls, MA 03170 The Honorable Terry Concannon Co-Chair Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, CT 06106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 h
Little Harbor Consultants, Inc.
Millstone - ITPOP Project Office t
P. O. Box 0630 Niantic, CT 06357-0630 Mr. Daniel L. Curry Project Director Parsons Power Group aic.
2675 Morgantown Road Reading, PA 19607 Mr. Don Schopfer Verification Team Manager Sargent & Lundy 55 E. Monroe Street Chicago,IL 60603
_ _ _ _ _ _ _ _ _