l t
2
[Q*aargk UNITED STATES
}
NUCLEAR REGULATORY COMMISSION
't WASHINGTON. D.C. 30eeH001
%,*****/
January 5,199:8-MEMORANDUM T0:
Roy P. Zimerman ociate Director for Projects FROM:
a o ins. Director Office of Nuclear Reactor Regulation
SUBJECT:
NRR AUDIT OF LICENSEE PROGRAMS FOR MANAGING COMMITMENTS MADE TO THE NRC The NRC staff evaluated problems encountered with licensing basis issues at Hillstone and Maine Yankee and offered lessons learned from these experiences in SECY-97-036. " Millstone Lessons Learned Report. Part 2:
Policy Issues."
dated February 12. 1997, and SECY-97-042. " Response to 0IG Event Inquiry 96-045 Regarding Maine Yankee." dated February 18. 1997.
Both reports recommended that, as part of an overall revision of its oversight of licensing basis information, the staff proceed with its plans to evaluate the industry's implementation of commitment management systems.
In related communications with the Commission, such as SECY-96-135. "Respense to Event Inquiry - Maine Yankee Atomic Power Station (Case No.96-045)." the NRC staff also stated that an assessment would be performed to verify that licensees had implemented commitments made to the NRC in past licensing actions (amendments, exemptions, etc.) and licensing activities (bulletins, generic letters, etc.).
In SECY 95-300. " Nuclear Energy Institute's Guidance Document. ' Guideline for Managing NRC Commitments'." dated December 20, 1995, the staff informed the Commission that licensees' commitment change processes, either implementation of the NEI guideline or licensee-specific programs, would be monitored at all reactor facilities to verify that commitments are being appropriately controlled.
If the audit process shows that licensees have not implemented the NEI guidance. or have not adopted some equivalent level of control and documentation of changes to their comitments, the staff will reassess the need to promulgate staff guidance or initiate rulemaking.
This reassessment will be initiated after the commitment control process at selected facilities has been audited using the attached guidance.
In order to address the follow-u) items related to assessing licensees
- commitment management systems, t1e divisions of reactor projects should perform audits of eight licensee programs for managing commitments in accordance with the attached. " Guidance for NRR Audit of Licensee Programs for Managing Comitments Made to the NRC." These audits are currently addressed in the Consolidated Operating Plan for Reactor Licensing.
The audit should include licensees fro;n each NRC region, licensees different from those
<f5 "1 V
CONTACT: Wiliiam Reckley
- gt. g A4m U 415-1314 gv p) g h
i
- .se
,11,E,FlE NlER
,G8 liiE CENTER COPY
- o8"8882"7J815 eon
P V
RL Zimerman. included in previous commitment management audits, and 11'censees representing a variety of plant designs, plant ages, and performance assessment ratingt.
~
The; selection of plants for the audit should also consider the availability of those project managers with the desired level of experience to most effectively perform the audit.
i I recognize that an audit of comitment management programs at a selected sample of reactor facilities is less of a follow up than was described in SECY-95-300 (i.e., inspection of all facilities). Although resource-considerations and the need to complete other priority tasks preclude the more inclusive evaluations at this time, the audits may be sufficient to support a general assessment of commitment management programs implemented by licensees for operat'ing reactors and support a decision regarding the possible need for-additional actions by the NRC staff.
The results from the audits and, if necessary, subsequent audits and inspections will also be incorporated into
.other-staff activities ertaining to the appropriate controls for and maintenance of licensin basis information.
In order for-the audits to help determine if additional regulatory actions are needed in the area of commitment management, please have your staff, working with the regional offices.- select an appropriate sample of operating reactors for auditing of the licensees' programs for managing commitments made to the NRC. The-lead project manager and the project managers for the selected facilities should incorporate the performance of the audits into their activity planning so that the pilot audits may be completed by May 1998 and the results evaluated and documented by June 1998.
Attachment:
As stated 6
__.__.i___'.____________.._.._
- war p
,; - 4 _'
f s.
.s q.
- R. Z1 merman -,,
wS
,. included in previous comitment management audits, and licensees representing f
" t 7
\\la variety of plant designs, plant-ages. and performance assessment ratings.; /
I' W JThe selection of plants for-the audit should also consider the availability.of' y#
4:
.1 rthose project managers with the desired level of experience to most 5
1 4f
...effect,1vely perform the audit,
,'(l
~
ti;
<1 l i --
nfi %y 1
'P JI recognize that an audit of commitment management programs at a selectedW, '
- o
,4,. D 1 ; sample ofJreactor facilities is less of a follow up than was described in
- f I % SSECY+95 300 (i.e.. inspection of all facilities). Although resource?
t j ;
J i
s 4,
' considerations and the need to complete other_ priority tasks-preclude the more-
' inclusive evaluations at this time, the audits may be sufficient to support' a e general assessment of-comitment management programs implemented by licensees ~
=1;;'
t for~ ocerating reactors and 'urport a decision regarding the possible need for 4*
' addit'ional actions by the NRC staff. The results from the audits and, if ;
necessary, subsequent audits and inspections will also be incorporated into, e" - 'other staff activities pertaining to the appropriate controls for and-N c maintenance of licensing basis information.
+
y'In order for the audits to help determine if additional regulatory actions are' needed in the area-of-commitment management, please have your staff, working with the regional offices, select an appropriate sample of operating reactors for auditing of the licensees' programs for managing commitments made to the-NRC. The lead project manager and the project managers for the selected facilities should incorporate the performance of the audits into their activity planning so that the pilot audits may be completed by May 1998 and the results evaluated and documented by June 1998.
Attachment:
As stated-DISTRIBUTION:
Central Files PD3-3 R/F PUBLIC L. Callan H. Thompson P. Norry A. Thadani J.Blaha C. Hehl. RI J. Johnson, RII G. Grant, RIII T. Gwynn, RIV K. Perkins. WCF0 J. Zwolinski E. Adensam (EGA1)
S. Collins /F. Miraglia B. Sheron J.' Roe W. Travers i
F: Gillespie-Directors. NRR Project Directorates NAME: -G:\\ COMMIT \\CVRMMO.FNL-l 4
. To receive a copy. Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N"go py
- -see previous concurrence W
/
Of C PD33 : fit **
l PD33:LA* lN DRPW:D* lL DKPE :D* - l t ADP*
lL
' NQIRT l L NAME-Wreck ley u$W"'T. Boy le JRoe BBocer R11mmerman
. SCollins,
DATE ll/ M /91 7/2b/9/
//26/9/
//31/9/
11/24/9/
VQ/) /96 1
- revised to. incorporate comments of ADP/00Nhk j
1
!J OFFICIAL RECORD COPY
+' q
~
j
' i
'~4.a_
~'
- p., a.
N,/ }
- 3. / "s,
c, g7 4
j z
r.
n
-~
ll f7 e-l R.1Zimmerman'~
- i implemented by licensees for operatir9 reactors-and support a decision regarding the possible need for additional short-term actions by the NRC staff.- The results from the audits and,-if necessary, subsequent _ audits and j
-inspections will also be incorporated into other NRR activities pertaining to the appropriate controls for and maintenance of licensing basis information.
l
.In order for the audits'to help determine if additional regulatory actions are needed-in the area of--connitment management, please have your staff, working with the regional-offices, select an appropriate sample of. operating reactors for auditing of the licensees' programs for managing-commitments made to the NRC.
The lead project managers and the project managers for the selected
~ facilities should incorporate the performance of the audits into their' activity planning so that the pilot audits may be completed by April 1998 and
-the results ovaluated and documented by May 1998.
- 1
Attachment:
As stated-DISTRIBUTION:
Central Files PD3-3 R/F PUBLIC L. Callan H.' Thompson P. Norry A.:Thadani J,' Blaha-C. Hehl. RI
-J.-Johnson, Ril G. Grant, RIII
- T. Gwynn. RIV K. Perkins WCF0 J. Zwolinski
~E. Adensam (EGA1)
Directors, NRR Project Directorates S. Collins /F. Miraglia-B..Sheron-J... Roe W,-Travers F. Gillespie NAMEi Gi\\ COMMIT \\CVRMMO.FNL To receive a copy, insincato in the bou: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
- - see previous concurrence OfC PD33:PM** lE PD33:tA* lN DRPW:D* l E DRPL D*
lE ADP*
lE NRR:D lE NAML WReckley CBoyle JRoe BBoger RZ1 merman SCollins-DATE 8/ - /97-7/25/97-
//25/91 7/31/97 10/22/97
? >10/
/97 revised to-incorpordte Comments of ADP.
I 0FFICIAL RECORD COPY
(
TC-q
-v(
93-y
- y 3 e
--N em t
R. Zimmerman In order for the audits to help determine if additional regulatory actions are needed in the area of commitment management, please have your staff, working with the regional offices, select an appropriate sample of operating reactors for auditing of the licensees' programs for managing commitments made to the NRC.
The lead project managers and the project managers for the selected facilities should incorporate the performance of the audits into their activity planning so that the pilot audits may' be completed and the results evaluated by September 1998
Attachment:
As stcted DISTRIBUTION:
Central Files PD3 3 R/F PUBLIC L. Callan H. Thompson P. Norry A. Thadani J. Blaha C. Hehl, RI J. Johnson. Ril G. Grant, RIII T. Gwynn, RIV K. Perkins WCFO J. Zwolinski E. Adensam (EGA1)
Directors, NRR Project Directorates S. Collins /F Miraglia B. Sheron J. Roe W. Travers F. Gillespie NAME: G:\\ COMMIT \\ AUDIT.MMO To receive a copy, indicate in the box:
"C" = Copy without enclosures "E" = Copy with enclosures *N" = Nr copy
- - see previous concurrence
,e s c,\\ a n Of C PD33:PM** lt PD33:tA* lN DRPW D*
lE DRPE:U* lE P ^ AITP'
' lE NRH:0 lL WWE WReckley W CBoyle JRoe BBocer C RJimermano tr?
sColl1ns DAll 8/Ji /9/
//25/9/
//25/91
//31/9/
is/ 7) /9/
8/
/9/
C revised to incorporate coments of ADP O IO 0FFICIAL RECORD COPY
/,
j R. -71 merman. et al. -!
In order for the audits to help determine if additional regulatory actions are needed in the area of commitment management. please have your staffs, working with the regional offices, select an appropriate sample of operating reactors for auditing of the licensees' ptograms for= managing commitments made to the NRC.
The lead project managers and the project managers for the selected facilities should incorporate the performance of the audits into their activity planning so that the )ilot audits may be completed and the results evaluated by March 1, 1998.
T1e estimated resources required to complete the audit and the relatively short time allowed for its completion will require careful consideration and scheduling in order to minimize the impact of this activity on other important project manager tasks and responsibilities.
Attachment:
As stated
' DISTRIBUTION:
Central Files PD3-3 R/F L. Callan H. Thompson P. Norry E. Jordan J. Blaha C. Hehl, RI J, Johnson. RIl G.' Grant, Rill T. Gwynn, RIV K. Perkins. WCF0 J. Zwolinski E. Adensam (EGA1)
Directors, NRR-Project Directorates NAME: G:\\ COMMIT \\ AUDIT.MMO To receive a copy, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy Of C PD33:PM _]4 PD33:tA,lN
()RPW:0 'h ' / F t DRPt : 0
,.,t., l E SPO:D l
DISP:0 l
NAME KReckiP40\\h CBoyle (N5 JRoe W B8oger /.)
Wiravers FGillespie 9P-69--52+F%E9-- =
RAML MSlosson IMartin Rlimmerman-SCollins DAlt
//
/97 7/
/97-7/ - /97
//
/9/
041CIAL RECCRD COPY
1
- 9. Zimmerman
. included in previous.comitment management audits, and licensees representing a variety of plant designs plant ages, and performance assessment ratings.
The selection of plants for the audit should also consider the availability of
-those project managers with the desired level of experience to most effectively perform the audit.
I recognize that an audit of commitment management programs at a selected sample of reactor facilities is less of a follow-up than was described in SECY-95-300 (i.e., inspection of all facilities). Although resource considerations and the need to complete other priority tasks preclude the more inclusive evaluations at this time. the audits may be sufficier,t-to support a general assessment of commitment rianagement programs implemented-by licensees for operating reactors and support a decision regarding the possible need for additional actions by the NRC staff. The results from the audits and, if necessary, subsequent audits and inspections will also be incorporated into other staff activities ertaining to the appropriate controls for and maintenance of licensin basis information.
In order for-the audits to help determine if additional regulatory actions are needed in the area of commitment management, please have your staff, working with the regional offices, select an appropriate f. ample of operating reactors for auditing of the licensees' programs for managing commitments made to the NRC. The lead project manager and the project managers for the selected facilities should incorporate the performance of the audits into their dCtivity planning so that the pilot audits may be completed by May 1998 and t"
results evaluated and documented by June 1998.
Attachment:
As stated DISTRIBUTION:
Central Files PD3-3 R/F PUBLIC L. Callan H. Thompson P. Norry A. Thadani J. Blaha C. Hehl, RI J. Johnson Ril G. Grant. RIII T. Gwynn RIV K. Perkins, WCF0 J. Zwolinski E. Adensam (EGA1)
S. Collins /F. Miraglia B. Sheron J. Roe W. Travers F. Gillespie Directors. NRR Project Directorates NAME: G:\\ COMMIT \\CVRMMO.FNL To receive a copy, inecate in the bos: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" y
- - see previous concurrence
/
Of C PD33:PM**
[
PD33:LA* lN DRPW:D* l E DRPE:D* lEI ADP*
lE
'NFRT lE IMME,_ _ Wreck leyuitf"TBoyle JRoe BBoger R21mmerman
. SCollins,
DALE ll/DiT97 -
l?if5/97 1/26/97 7/31/97 11/24/97 dix /) /9h revised to incorporate coninents of AGP/0UNRk 0FFICIAL RECORD COPY
y, -
.t-i j
t 1
PD11II-3 DOCUMENT COVER PAGE DOCUMENT NAME;--
- G dCOMMIT\\CVRMMO.FNI-G
- \\COMMITMUDIT.FNL i
SUBJECT:
NRR AUDIT OF LICENSEE PROGRAMS FOR MANAGING COMMITMENTS i
f MADE TO THE,NRC-ORIGINATOR:J
-William Reckley SECRETARY:-
P Kleene DATE:-
October 28 ~1997-
+
ese ROUTING LIST ese-NAME DATE
'1, W; Recklev 07/23/97 2.
CBovie 07/25/97 3.
JRoe 07/25/97
-4, BBooer 07/31/97 5.
RZimmerman 10/22/97-1M/./gg 2
Y SCollins 6-Q
.lO f Secretary - Dispatch 10/
/97 Can Document be Deleted after Dispatch?
t J
Note:
Although not included in the concurrence chain, this guidance has been discussed with & a recent version has been provided_to regional DRP personnel. DISP, DRPM, and OGC.