7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY DOCKET NO. 50-263

~

ENVIRONMENTAL ASSESSMENT-AND FINDING 0F NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of exemption from certain requirements of Section III.G of Appendix R to 10 CFR Part 50 to Northern States Power Company (the licensee) for Monticello Nuclear Generating Plant, located at the licensee's site in Wright County, Minnesota.

ENVIRONMENTAL ASSESSMENT Identification of Proposed Action:

The proposed action would grant exemption from certain requirements of 4

Section III.G of Appendix R to 10 CFR Part 50 which relates to fire protection features for ensuring that systems and associated circuits used to achieve and maintain safe shutdown are free of fire damage. The exemption is technical since the licensee must demonstrate that fire protection confiourations meet the specific requirements of Section III.G or that alternate fire protection configurations can be,iustified by an acceptable fire hazard analysis.

The Need for the Proposed Action:

The prooosed exemption is needed because the features described in the licensee's request regarding the existing and proposed fire protection at the plant would result in a net benefit to the public health and safety that compensates for any decrease in safety that may result from the granting of this exemption request.

8606030318 860523 PDR ADOCK 05000263 PDR.

7540-01 3.,

Environmental Impacts of the Proposed Action:

The proposed exemption will provide a degree of fire protection such that there is no increase in the risk of fires at Monticello. Consequently, the probability of fires has not been increased and the post-fire radiological releases will not be greater than previously determined nor does the proposed exemption otherwise affect radiological plant effluents. Therefore, the Commis-sion concludes that there are no significant radiological environmental impacts associated with th'e proposed exemption.

With regard to potential nonradiological impacts, the proposed exemption involves features located entirely within the restricted areas as defined in 10 CFR Part 20.

It does not affect nonradiological plant effluents and has ac ?ther environmental impact. Therefore, the Commission concludes that there are no significant nonradiological environmental impacts associated with the proposed exemption.

The Commission has determined not to prepare an environmental impact statement for the proposed exemption.

Based upon the foregoing environmental assessment, we: conclude that the proposed action will not have a significant effect on the quality of the human environment.

For further details with respect to this action, see the licensee's letters dated August 5, 1983 and February 21, 1986.

These letters are avail-able for public inspection at the Commission's Public Document Room, 1717 H Street, NW, Washington, D.C., and at the Environmental Conservation Library, Minneapolis Public Library, 300 Nicollet Mall, Minneapolis, Minnesota 55401.

(

7590-01 L'

3 Dated at Bethesda, Maryland, this 28th day of May 1986.

~

FOR THE NUCLEAR REGULA Y C0 ISSION J

{

v John:A. Zwolinski, Director BWR F ro,iect Directorate #1 Division of BWR Licensing

l..

i 9

9

~

t File PD#1 Rdg DOCKET NO.

Hay 28, 1986

  1. ** " U "

MEMORANDUM FOR:

Rules and Procedures Branch Division of Rules and Records Office of Administration FROM:

Office of Nuclear Reactor Regulation

SUBJECT:

DOCKET NO. 50-263; HORTHERN STATES POWER COMPA NY One signed original of the federal Register Notic id Register for publication. Additional conformed c e

entified below is enclosed for your transmittal to the Offi 5

opies (

Notice of Receipt of Application for Construction P

) of the Notice are enciosed for your use.

ce of the Federal Notice of Receipt of Partial Application for Constr ermit(s) and Operating License (s).

License (s): Time for Submission of Views on Antituction Permit (s)and Facility rust Matters.

Notice of Consideration of issuance of Amendm Notice of Receipt of Application for Facility Liceent to Facility Operating License.

Notice of Consideration of issuance of Facihty Liconse(s); Notice of Availability of Applican Notice of Availability of NPC Draft / Final Environm se(s) and Notice of Opportunity for Hearing.

nmental Report; and ental Statement.

Notice of Limited Work Authorization.

Notice of Availability of Safety Evaluation Report.

Notice of issuance of Construction Permit (s).

Notice of issuance of Facility Operating Lice Order.

nse(s) or Amendment (s).

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessm

)

ent.

Other:

\\

\\

00,aks l

'W i

Office of Nuclear Re or Regulation Division of BhR Licensing

\\

BWR Project Directorate il

Enclosure:

As stated

Contact:

Phone:

ggggg

. dbl. : P.D#1 ner.

y

.caamersa..

v >..Q.5/28/86...

m ORM 314 HO/8ol NRCM o24o m..

OFFICIAL RECORD COPY

. e.

DISTRIBUTION t File

~

PD#1 Rdg May 28, 1986 DOCKET NO.

Rules and Procedures Branch MEMORANDUM FOR:

Division of Rules and Records Office of Administration FROM:

Office of Nuclear Reactor Regulation

SUBJECT:

DOCKET N0. 50-263; HORTHER'l STATES POWER C0lPANY One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (

5

)of tne Notice are enciosed for your use.

Notice of Receipt of Application for Construction Permit (s) and Operating License (s).

Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility License (s)and Notice of Opportunity for Hearing.

Notice of Availability of NRC Draf t/ Final Environmental Staternent.

Notice of Limited Work Authorization.

Notice of Availability of Safety Evaluation Report.

Notice of issuance of Construction Permit (s).

Notice of issuance of Facility Operating License (s)or Amendment (s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Other:

' ~ J Office of Nuclear Re or Regulation Division of hR Licensing BUR Project Directorate #1

Enclosure:

As stated

Contact:

Phone:

29412 orrice.

DBL:PD#1 cu:~wc*.C4mersah om>

.0H28/.86.

une recu sie noinoi nacu ono OFFICIAL RECORD COPY


.-J