ML20198J972
| ML20198J972 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 05/30/1986 |
| From: | Corbin McNeil Public Service Enterprise Group |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20198J977 | List: |
| References | |
| NUDOCS 8606030271 | |
| Download: ML20198J972 (3) | |
Text
.
.. ~.. _ ~
'. G
.M Public Service Electric and Gas 4
Company Ctrbin A. McNeill, Jr.
Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4800 Vice Presidenb Nuclear May 30, 1986 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 4
Attention:
Ms. Elinor Adensam, Director Project Directorate 3 Division of BWR Licensing
Dear Ms. Adensam:
SINGLE LOOP OPERATION HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) is submitting proposed changes to the Hope Creek Technical Specifications (Attachment I) in support of operation with one recirculation loop out of service, i.e. Single Loop Operation (SLO).
The results of a Hope Creek-specific analysis performed by General Electric and documented in a report entitled
" Hope Creek Single Loop Operation Analysis" dated February 1986 (Attachment II) justifies the proposed Technical Specification changes and SLO.
This report will be included as Appendix l,
15C to the Hope Creek FSAR in a future amendment.
In addition, PSE&G notes that the proposed Technical Specification changes do not involve any significant hazard considerations as demonstrated in Attachment III nor constitute an unreviewed safety question.
In the event there are any questions with regard to this submittal, do not hesitate to contact us.
Sincerely, 1
a i
h
[
P I
j.
. Attachments 8
l 1
t s
Director of Nuclear 2
5-30-86 Reactor Regulation C
D.H. Wagner USNRC Licensing Project Manager R.W.
Borchardt USNRC Senior Resident Inspector
I ATTACHMENT I O
l l
t e
l l
l
..