ML20198J964
| ML20198J964 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/29/1986 |
| From: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| To: | Masnik M Office of Nuclear Reactor Regulation |
| References | |
| 0432A, 432A, 4410-86-L-0089, 4410-86-L-89, NUDOCS 8606030267 | |
| Download: ML20198J964 (2) | |
Text
GPU Nuclear Corporation NggIgg{
Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 4410-86-L-0089 Document ID 0432A May 29, 1986 Michael T. Masnik - Project Manager TMI-2 Cleanup Project Directorate Division of PWR Licensing-B Dear Mr. Masnik NRC Multi-Plant Actions Your letter dated May 2, 1986, requested the status of the following multi-plant actions (WA) for THI-2 by May 31, 1986:
WAf TITLE A-02 Appendix I - ALARA A-09 Pressure Vessel Beltline Material Surveillance A-ll Guard Training Plans A-12 Vital Area Analysis C-10 Control of Heavy Loads D-ll Fission Cas Release D-14 Reactor Vessel Weld - Wire Deficiency Based cn your discussions with members of my staff, it is unclear as to what constitutes the base requirements for satisfying the multi-pla.nt actions listed above. However, it appears that the majority of the above items are either not applicable to TMI-2 or have been completed. Since the referenced letter did not provide the required information to-determine the precise status of each of the above items, an official status af TMI-2's implementation of the listed W A's cannot be reported.
In order to respond to your request with the desired degree of specificity and accuracy, I request that you provide GPU Nuclear with a 8606030267 860529 0)
PDR ADOCK 05000320 0
P PDR g
I GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
(
- if.
Mr. Masnik May 29,1986 4410-86-L-0089 base rer.erence for each of the above. listed items so that an-accurate assessment of.the-status of compliance or need to comply with each item can be made.
Sincerely, 4
. R..Standerfer Vice President / Director, TMI-2 FRS/RDW/eml cc: Director - TMI-2 Cleanup Project Directorate, Dr. W. D. Travers 4
m
.