ML20198J635
| ML20198J635 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 12/18/1998 |
| From: | Sorensen J NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20198J639 | List: |
| References | |
| NUDOCS 9812300229 | |
| Download: ML20198J635 (2) | |
Text
o Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 December 18,1998 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Core Operating Limits Report for Prairie Island Unit 2 Cycle 19, Revision 0 The attached revision to the Core Operating Limits Report for Prairie Island Unit 2 Cycle 19 is being provided in accordance with the requirements of Technical Specification Section 6.7.A.6. The limits specified in the attached Core Operating Limits Report have l
been established using NRC approved methodology.
The Unit 2 Core Operating Limits Report has been revised for Cycle 19 to incorporate the following changes:
l
- 1. Table 1 has been updated to incorporate revised bounding V(z) values.
- 2. Figures 2a through 2d have been updated to incorporate revised bounding V(z) l values. Figures 2e,2f and 2g nave been deleted.
We have made no new Nuclear Regulatory Commission commitments in this letter or the attachment. Please contact Gene Eckholt (612-388-1121)if you have any questions related to this report.
c' 7 c.
i f00l
}
Joel P. Sorensen Plant Manager Prairie Island Nuclear Generating Plant 9812300229 981218 PDR ADOCK 05000282-P PDR _
~
l l
USNRC NORTHERN STATES POWER COMPANY December 18,1998
. Page 2 -
c: Regional Administrator - Region 111, NRC NRR Project Manager, NRC Senior Resident inspector, NRC State of Minnesota Attn: Kris Sanda J E Silberg
Attachment:
Core Operating Limits Report - Unit 2 Cycle 19, Revision 0 l~
l COLRLTR. DOC