BABCOCK & WILCOX CO.
To: Berlinger C
Office of Nuclear Reactor Regulation
References
JHT-86-104, NUDOCS 8606030120
Download: ML20198J462 (3)


Text

_ _ _ _ - _ _ - _ _ _

Babcock & Wilcox nuewr r- w*a a McDermott company JHT/86-104 3315 Old Forest Road P.O. Box 10935 Lynchburg,VA 245064935 (804) 385-2000 May 23, 1986 Mr. Carl H. Berlinger, Chief Reactor Systems Branch Division of Pressurized Water Reactor Licensing-A Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Licensing Plan for Catawba /McGuire Reloads

Dear Mr. Berlinger:

Enclosed is a copy of B&W's proposed licensing plans for safety /ECCS analysis submittals for the Catawba and McGuire reloads. This is the same plan that was summarized in a phone call with you on May 22, 1986. Comparison with the original licensing plans is provided where applicable.

Please note that the revised plans addresses only the safety and ECCS analysis submittals. The mechanical, nuclear, and thermal-hydraulics topicals, with the exception of BWCMV, will be submitted on the original scheduled date of April 1, 1987. BWCMV was submitted on May 12, 1986. A list of all the topicals that B&W plans to submit for the Catawba and McGuire reloads is also attached.

Very truly yours, f.3 Me/*Wf J. H. Taylor Manager, Licensing Services cc: R. B. Borsum T. L. Baldwin 8606030120 8605231.

PDR ADOCK 05000369 P PDR;f h00 } ,

i i

6 LICENSING PLAN COMPARISON DATE ORIGINAL PLAN DRAFT PLAN 7/ 1/86 Letter Report sent to the NRC delineating the codes ,

to be used in the Evaluation Model and what information flows between the codes.

9/ 1/86 The first draft topical, RELAP5/ MOD 2, is sent to the NRC. This report has only 2 or 3 sections complete but has the intent and purpose of all remaining sections described.

4/ 1/87 Code topicals Initial drafts of all complete, submitted code topicals complete, to NRC submitted to NRC.

Outstanding sections committed for submittal.

7/ 1/87 EM topicals complete, Initial draft EM topicals submitted to NRC. complete, submitted to NRC.

Outstanding sections camitted for submittal.

10/ 1/87 Technical content for all sections of Revision 0 of all code and EM topicals established.

12/31/87 Revision 0 of all code and EM topicals submitted to NRC.

7/ 1/88 All Rev.1 changes No change.

to all code and EM topicals identified.

NRC approval to No change.

proceed with plant specific analysis.

10/ 1/88 Revision 1 to all No change, code and EM topicals submitted to NRC.

.-.,,-,w ~ - - - - +

y _____m

. . s Topical Report List BWCMV Critical Heat Flux Correlation Statistical Core Design Operating Limits Methods Fuel Assembly Design RELAP5/ MOD 2 FRAP-T6 BEACH FOAM 2 REFLOD3 ECCS Evaluation Model Safety Analysis Evaluation Model ECCS Applications Safety Analysis Applications 1

7 l

.