ML20198J457
| ML20198J457 | |
| Person / Time | |
|---|---|
| Issue date: | 12/23/1998 |
| From: | King D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Kalmbach R, Patrick W CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES |
| References | |
| CON-FIN-J-5220, CON-NRC-02-98-002, CON-NRC-2-98-2 NUDOCS 9812300191 | |
| Download: ML20198J457 (5) | |
Text
--
MD T-sn p.gua? Job-ui d
p.g-n-98 11:13 Fros:$WRI CONTRACTS
)
,,s g.p.
.,3
""W I
A undiews.
i wuourAR nuovutowcomuumion weswearels,g.a.anwen ene*g osamur22,1ees i
,98 DEC 22 Pl'19 38 i
W j
negula ie
)
Sh i
orah rses10 Antotio. Tk 782240810 t
j TA8K ORDER No. 006. Entitled ' TECHNICAL. $UPPORT FOR 8tX i
IN8PeCriON80F MI.E II 81TW Undw Contract No. NRC 0240 002 Cser Mr.
i itiecoordados With'the Boollon 0.6,T"o. dam==
dinitires Teek Order No. 6. This eNort eheit be perfo% of the subpot contract, thle letter d
alsmenbeiW4fk and the Ontractor's technrmedin accordenac with the onolosed l
8 1
O toombed 22,1998, which is incorporated by prepossi dated October 21,1908, revloed i
l and made e part of this task order.
i Took Onia phuhiber 5 shen be in effect from January 11,1999, throu0h July 12,1999, with e ocetcetinC of $66.340. 'the amount of $80,390 bpresente reimbutesble costs, the amount of l
81,732 ar.i;is the cost of fooHities capital, any the sum of $4,227 mpresent the Axed fee.
i 1
' d'oriourW. shen, et no time, exce6d the teek prder eeEng. When end if the Tteetd e
beid s'nd payable to the contractor hwoundw shall equel the obilseled amount, the er contractor shell not be abilgeled to continue performance of the work unless and until the I
C4atre i OfRoer shell inemsee the amount ob4peted with respect to this teak order. Any work by the contractor in excese of the obikisted amount spealRed above le done so et un th0 gr's tale risk.
Tha task el Algetee funds in the emotml of $e6,349, of which $60,390 repeceente g(96 one 2, $1.782 represents the cost of.ftcW6es capital, and $4,227 represents the g o. fixedlee.
date for lhle teek order lo se follows:
E nl 84 9 No.:
96 016-306 106 "8
- 1000E, J8220 gM 3:
282A gg w.
s1xo200.os0 ou i
5000R040 (6
OUNh
$08.849 t
mdo The " "4,IndlJIduel le coneWered to to essenhet to the eucasseful performance of the work wnden dr. P.'Metidn. The Contreetor agrees that such personnel shall not he removed w
I
' romthe effort under the took oreer without complianos with the Contract Clause H.1 Key
?ar normel. ;
Nf 0
kW
^
L y6*ns c cm
%%k.id
..m..... Med.M-
e i
DEC-23-98 11:13 From:sWRi CONTRACTS T-983 P.04/07 h b-281
- p o,
u l
fg g5 Page 2 i
'fourconbiudn0 the courseof tNo teek are'i 5
i echnico Matters:
Jayne Hohereen PreitetCHloor (801 418 4001 i
l Sene)dJegenneth i
3 TechnicalMonitor 4
(001)4154g63 I
CentrsotuniMasers: Donald A. King i
l 8eniorContreat Spoolellet (801)415 4 731 4
j The d of this task order does not amend pny terms or conditions i
meneeindbete your acomptance of this task order by having en oRiolai, Who is autherle hiid youragenlaation, esecute thme (3) oopies of thle document in the speces provided and i
re tum two soples to the U.8. Nuclear Re0ulatory Commiselon, Attn: Mr. Donsid King, l
AINWl/DCMACMB3, Mall 8 top T-712, Washingtori, D.C. 20665. You should reta fWyourretords.
1 1
peu have any helione negarding this matter, if j
(301) 4164157, or e-mail et DAK1gNRC. GOV. please contact me on (301) 4154781, facolmile l
i
/
{
I Donald A. Kin Controot".r+g, Contracting OHloor
_wiiBranch No.3
(
Division of Contracts and i
npiiM$na0ement Oftce ofAdministration i
5 00Ml l i
' Ast4 seed I i
i i
A0llEPTEDI J
)
be E^35 R. B. Kalmbach i
a
_ Di; ector. Contracts 1,
TITO !
Der ember 23. 1998 DATIl i
I i
i a..s.sw... a. ~. -
k
. _ ~ -.. -. -
DEC-23-38 11:14 From: SWR 1 CONTRACTS i
1
~ TAaK hs. OE Tm.5:
TECHNKMt. 8dPPORTf0R SIX INSPECTIONS OF TITLE 1 SITES I
JOB OC IIE:
J6Bso "
NRoit i ICE:
NMSS.
NRCPf OJ
., P^.3ER:
JAYNE HAINORSEN,418 0001 NRC TE0HNICALMONITOR:
BANADJAGANNATH,4164858 000KETNUIlBER:
VARIOUS h
i 1.0 jaakgrhund i
1 i
Jranium mbi elles under loanee after Novemb(r 8,1978, era regulated under Tite il of the
{
JraniumNil i
j Radetion control Act (UnpMCA), whloh amended the Atomic Energy Act.
The realomation
)
for theeo ahes should most the requiremente of 10 OPR 40 j
dichero,in part, that tion of Uranium proosselno thes be conducted in accordance with a plan which provideo reasonable sasurance of long term etebility and does not rel j
oct!ve m0intenance.
HMCatefi generally conduct routine Inspections of Iloensee's activltlee in accordanos with ppiloablo inspection guidelines. These inspections may be supplemented by esperate
(
laspections of speelfic reclamation plan construction activities. After an inspection (and review of suppor ling dommneme), NHC staff will document that construolloWoperation is in accordance with the a ppreved plan, or altamatkety,iate action, including issu that deviations from the approved plan are noted.
When dedatione are indlotted, appropr 1
be initiate d by NRC.
e,o QlW Tbe obico$ve of an inspection is to determine v$ ether the lloonese's edivities a to being conducted in accordanos with approved plane bytheirllos;1ee and tion saein corr with applicable ter44ations. The contreolor shall NROin performenos mod doeur pien.
of these inspections to contirm that the me. built desi0n meste the approved 3.3 igm Quaillinqttions Ranuired der shall provide the servloos of a gottechnical engineer and /or groundwater Tte contra h)droloWW. Thette persons should have earth enaluate We conbtructico and quelltr controli ruotion experience with the capabletty to aspects of earthen Uranium mill tallings M.; %,wie, and evolusta youncwater monitdring and remediation leeues. FamWadty with the Standard Rotlow Plan and construction inepeation procedures used by the Uranium RecoveryI lranchle required.
4.4i kmbl,1 Gig!
Tha estimated eflott for providing con'.ract suppen for ela ineptotione under this task le 40 ho Jre (0.90 FTE) for a geotechncal snelneer and/or Th a does not include time apent waiting for l'ac;; groundwater hydmiogist, as apptopilate.
responeet orNRC and menagement a
_,,,..., a.....
h.i..a.b. w. + - -
s M
DEC-83-98 11:14 Frost $WRt CONTRACTS Y~III II i
j on the scope of the inspectkm, all of the above espertlee may not be uped, own s.o fwindpf agefannanne
^
January 11,1999 through July 12,1990.
l j
h.o aanneatWork The contractorshau use appropriata esotions of the 7"- "- NRC Manuel chaptore i
iM08801, Mot 041, M00610), alte spoolfic background information, and dinousolone with NRC l
eff.10:,
8 1.
back0 mund information and become familler with NRC's pmoedures for ing construc:lon and ground water monhoring inspections.
i h.
F6r each inspection prepare an inspection plan, in consukation with the NRC staff, i
NWiding the ableellves of the inspection, IdentNylne what manual chapter and n)peceon procedures wls be fonowed, and what areas wm be inspected.
i d.
Adelet NRO in performing or !ndependerIlly perform inspeMm of lei. foollities and/or l
THe 11 rec %mation actMiles. 'rNe could include observation of earthwork operations 1
j ar d/or groundwater monitorin9 and cleanup, assessment of floorisse quality contre!, and reylew ct construollon and monitoring stoofde to assess whether the lloonoce le meeting the requirements of the approved reclamation plan and 10 CFR Part 40.
I 4.
Prspare input to the inspection report (almilar to a model report 19 be provided by NRC i
etdf)p the evaluation of the inepeated activiiles and recorde, with conclusions j
on the Noenees performance with roepooi to lloonse conditione appucable to the l
redfematon plan.
740
- r4 T=='
2 itis estimoted that one, one day 4wo person wul be held at NRC's offloes in Roolwille.
l 1
Maryland tW required). In addison, travel to the 4ra recoveryaltos wid be required,to 1
reviewoorstruodon and monitoring data and phyelostf perform the finalInspection. The elles j
tobeinopooted Wil be deslenatod at the time of inilletng work underthis.'teek. For the purpose ciestimatisg aedume NM (2 different ahea,1 person,1 de
/ each plus travel time) WY (e d0forentehes,1 person,1 doy each plus travel time), and I itah (e different sites,1 person,1 1
dey each I tus travel time), inspections can generally be completed in one day, allowin9 two
&J M,allravellisys per elle.
Md y'"'-
8.0 NR Gits4pe(fle $enes,
.g e
.i 9
5-foolamellon plan and other hsArpound dcoumontation.
5 Apptoeble Manual Chapters, and any previous inspection reports.
8te f Technioni Poellion on Testing and Inspection.
i i
s.o i
aqnedpie t
l l
i 4
DEC-23-08 11:14 @ rom: SWR 1 CONTRACTS I
i The febNachedule of the eleff time requir$d le bened on cettmates of time intervals to I
socompleha linspection. The time reqUlred Wobtain responses from the lleensee of I
- menessment of various phases le estimated under the response column. Deliverdble i
idates er a not provided because the scheduling of Inspections Will be bened on construction ie84%-
Calender T'ime To Aogompiloh Each InspooWon I
CNWRA 8teff
Response
C:!;;2LM)
(weeks)
(weeke)
(weeks from Teek l
inillation) i j
1 3NWRAvpvlo$s the i
lloones aritideWlope lnepeatiom plan 1.0 ONWRA perfo#vns Igeatio) 0.6 ONWRA propere draft i
hepootlou toport 0A 2wks afterinitiedoh ofinspection task 4
HRCrevbye draft 1.0 Provide commente!to.
CNWRA i
ONWRAI hiepectior 0.6 Finalreport due 3 wks afterinitletion of task 1 ).
IsahningiDirmation T w Technical Monitor will be designated et the time of initiation of this tepk. Inspection iO#M e hall be ocordneted with Region IV NRC offloe. Technicalinstructions may be leeued fram time o tim $ durin0 the duration of this task. Technloallnetruc1lons ehell not constflut
'm
^
J.
of Work or changes of such nature se to justify 4.n edlustment in cost or period of arformenne. Directions for changes in the scope of work, cost, or period of performance must p
bo coordinated through the NMSS Project Offloor and approved by the NRC controoting 0 Mioer, g
I r
t i
i 4
.i.
4 *
$$$END***
..