ML20198J337
| ML20198J337 | |
| Person / Time | |
|---|---|
| Issue date: | 12/23/1997 |
| From: | Mearse S NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Coorbarry S ADSYTECH, INC |
| References | |
| CON-NRC-33-93-225 NUDOCS 9801140104 | |
| Download: ML20198J337 (4) | |
Text
e
() c.p
- 3 #IC t
l'.
g"
- UNITED STATES.
-p
,i NUCLEAR REGULATORY COMMISSION
't WASHINGTON, D.C. 30666 0001
'+.....
DEC '2 31997 Adsystech, Inc.
A1TN: Sharon Coor Barry 8401 Colesville Road, Suite 450 Silver Spring, MD 20910
SUBJECT:
MODIFICATION No. 5 TO TASK ORDER NO. 5 UNDER CONTRACT NO.
NRC 33-93 225
Dear Ms. Coor-Barry:
The purpon of this task order modification is to extend the period of performance of the subject task order from December 31,1997 to March 31,1998, at no additional cost or obligation to the govemment beyond the current task t,rder ceiling amount of $284,363.75.
The issuance of this task order modification does not amend any other terms or conditions of the subject cori ract.
Please indicate your acceptance of this task order modification by having an official authorized 4
to bind your organization execute three copies of this document in the space provided below -
and retum two copies to Ms. Brenda J. DuBose, Contract Specialist. You should retain the third copy for your records.
Sincerely, XL J
M Je 1 Sharon earse, Contracting icer ontract Management Branch No. 3 Division of Contracts and Property Management Office of Administration
Enclosure:
As stated Name fy4S( Y l Title Ilv/1A/91 CDPoY oste.
!.l,Gil7 9901140104 971223 llh l l *h PDR CONTR MtC-33-93-225 PDR
. STATEMENT OF: WORK (MOD #5)
TASK ORDER NO. 5 UNDER 2 CONTRACT NO.'NRC-33-93-225 FORMS AUTOMATED WORKFLOW-AND ELECTRONIC APPROVAL SCOPE OF WORKr
- This; modification is being issued to extend the period.of_ performance from
- December 31, 1997 to March 31, 1998.
All deliverable dates were adjusted to
- reflect this extension.'
0--
- The contractor shall prepare an; Administrative Guide which
= identifies - the steps involved'to add / modify / delete forms images from the~ servers as'well as how to maintain the new 4.1 menu so
- that-it may reflect these. changes.
The user of this guide will be the forms administrator.
The form administrator, while he/she may not-be necessarily technical, must_be able to. determine from this guide the type'of technical support staff to use in order to wffect the desired changes.
This guide also must identify any steps required by - the forms administrator with respect to possible
- changes to users' drives and how these changes are to be handled.
A draft version of the. guide shall be submitted to the NRC TasA Manager 30 days prior to the final delivery date.
0 The Scope and Analysis Document (describing application /s required to allow forms data to be used by subsequent versions of the same form) has been approved.
The contractor shall implement the recommended automated process as described in the Scope and Analysis document.
The contractor.shall_ provide one (1) hard copy
- and an electronic
- copy, where appropriate, of the systems documentation such as source code, listings, macro language used, user's guides and systems-manual as appropriate.
The contractor shall _ provide ' up 'to two (2) demonstrations - -of 4.1 conversion utility and installation of the 4.1 menu.
. 0-The contractor'shall' provide the NRC with three (3) hard-copies of-
- all instructions and one-(1) copy of the software on disk to enable
' NRC to implement the conversion utility and 4.1 menu without
. contractor. support. _A-draft version of the instructions shall be submitted to the NRC Task Manager 30 : days prior to the final delivery date.-
~
o'
- With. NRC Project Officer approval the contractor shall modify
( i'. e.,. edi t ) up to forty (40) forms, selected by the NRC ' Task Manager; to provide a_new user interface.
These -' f orms shall be-implemented into the; production environment after approval is-given
_ by theLNRC Task Manager.
These are forms that have been identified p
-by the NRC;as having> unacceptable performance problems,due to the L
intensive 1 graphics: overhead. :
Therefore,, simpler data entry t-
.g=
p w
y
- v e
r-rr, -.
w.=
6 L
s Linterfacesinhall be developed.
O The~ contractor shall automate andLimplement;upLto-50 more-forms-l (251-300)', as-directed:by2the: NRC Task Manager, using'the INFORMS designer tool _ chosen _byfthe NRC.
These-forms will cont *in u full:
cr'ss edits,-
required / optional intelligence
' (e.g., _ edits, o
conditional fields, etc.).
Contractor is tasked to work directly_
'with Information: Records Management: Branch;(IRMB) to automate these forms.
TRAVEL
- It-is anticipated that local travel -f rom the contractor's Silver Spring, Msryland office to.the NRC_ Headquarters (Rockville,' Maryland) location will
- be: required =on a daily basis'for performance of work under this task order.
Any.other travel-requires the approval of the NRC Contracting Officer.
_nRLivERAnLEs Provide the draft Administrative Guide for Operational l Support Completed 11/97 Provide-the final Administrative Guide for March 31,1998 Operational Support R3-issue the Quick Reference Guide (if modified)
March 31, 1998 SProvide demonstration of 4.1 conversion utility cnd the installation of the 4.1 menu completed 11/97 Provide the draft instructions to imfa.aent the conversion utility and 4.1 menu Completed 11/97 Provide the fina1' instructions to implement the conversion utility and 4.1 menu completed 11/97
- All _ deliverablee to be provided to the NRC Project Of ficer under this task order shall describe the steps involved in performing the research/ analysis which shall' include:
'o
.a fulli. statement of the problem area (s);
lT a description of the people, organizations, and/or material which provided the information.
o --
.a summary;of the methodology employed; and 0-
- a; statement
.of the. conclusions (specific results) and/or recommendations reached, if any, to include supporting material as
--appropriate t
b 4
m w
y
=
giy
,y m..
-, + -
~
r-
-LEVEb OF' EFFORT 3 Th> 1evel of 'ef fort. for this task order is 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.
PERIOD OF PERFORMANCE-
- Thio-task order modification shall' expire March 31, 1998.
v
-e