. Mailing Address Alibama Power Company 600 North 18th Stract Post Office Box 2641 Dirmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald
%! 's'*3;fn"2 AlabamaPower d
resc w eexc w May 30, 1986 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear. Regulatory Commission Washington, D.C.
20555 Attention: Mr. L. S. Rubenstein Gentlemen:
Joseph M. Farley Nuclear Plant - Units 1 & 2 NUREG-0737, II.K.3.31' SBLOCA Generic Analyses Report By letter of May 23, 1985, the NRC advised Alabama Power Company that resolution of NUREG-0737 Action Item II.K.3.31 could be accomplished by a generic analysis. This generic analysis is due May 30, 1986, one year after receipt of the May 23, 1985 NRC letter. Alabama Power Company has elected to meet the NUREG-0737, II.K.3.31 requirement as part of a Westinghouse Owners Group (WOG) generic effort. However, as stated in a May 27, 1986 WOG letter to the NRC (0G-186), the submittal of the completed analyses has been delayed.
In the event that the WOG submittal will be further delayed beyond June 1986, Alabama Power Company will advise.
Respectfully submitted, L
({ Q R. P. Mcdonald RPM / JAR :ds t-0-T.S. 3 cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves g
Mr. W.' H. Bradford
' O 603ggys O
o P-