ML20198H938

From kanterella
Jump to navigation Jump to search
Notifies of 1986 Indian Point 2 full-participation Exercise on 860604 (Insp Rept 50-247/86-13).Team Assignments, Schedule,Exercise Event & Time Line,Open Items,Objective Lists & Synopsis of State & County Matl Encl.W/O Encl
ML20198H938
Person / Time
Site: Indian Point 
Issue date: 05/16/1986
From: Amato C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ronald Bellamy, Van Neil R, Vito D
NRC, NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8605300607
Download: ML20198H938 (4)


See also: IR 05000247/1986013

Text

__

.

_ - - _

__

-

_.._

_ _ _ _

__.

. _ _ _ . _

_

I

.

,

!

!

,

Docket No. 50-247

t

i

MEMORANDUM FOR:

Distribution

THRU:

Terry L. Harpster, Chief, Emergency Preparedness Section

'

2

Emergency Preparedness and Radiological Protection Branch

Division of Radiation Safety and Safeguards

FROM:

Charles G. Amato, Regional Team Leader, EPS, EP&RPB, DRSS

SUBJECT:

1986 INDIAN POI: i-2 FULL PARTICIPATION EXERCISE

j

,

j

!

The exercise will be held on June 4 beginning at 6:10 A.M. and ending about 12

l

1

hours later. Our inspection number is 50-247/86-13.

2

i

We will stay at the Thayer Hotel, West Point, New York.

Reservations have

!

been made for Monday through Thursday morning.

The hotel cannot accommodate

,

j

anyone after noon Thursday.

Please call 914-446-4731 to guarantee your

i

reservation no later than Friday, May 23, 1986.

(Those staying beyond

i

Thursday are to make their own arrangements).

The rate is $49 per day; there

!

is no State tax.

Three R/As have been reserved for Region I team members.

]

Travel request forms have been completed for team members.

!

Familiarize yourself with IE Inspection Procedure 82301; Indian Point-2

!

Emergency Plans and Inspection Procedures which relate to your assignment; the

.

l

openitemsandobjectives(listofeachattached);andthescenario.

i

There may be intense public awareness.

NRC and FEMA will hold a public

meeting beginning at 10:00

A.M.

Friday, June 6 in Building 1 of the

i

Westchester County Airport to discuss the exercise.

!

]

Attached are the team assignments and schedule, exercise event and time line,

)

open items, objective lists, and a synopsis of the New York State /four county

!

RERP.

Additional material may be forwarded at a later date, if needed, and

,

j

may be hand written.

-

1

If you have questions, comments, suggestions or problems, call me at FTS

'

488-1394 or 215-337-5394.

,

l

Wh.

&

!

Charles G. Amato

l

Regional Team Leader

!

1

I

]

0FFICIAL RECORD COPY

5000h47

p

m

a

gg

.

-

-

- -

.

Distribution

2

Attachments:

1.

Team Assignments and Schedule

2.

Exercise Event and Time Line

3.

Open Items and Objectives List

4.

Synopsis of Off-site Plan

Distribution:

R. Bellamy, RI

R. Van Neil, HQ

D. Vito, RI

P. Gaul, RI

P. Koltay, SRI, IP3

E. Podolak, HQ

L. Rossback, SRI, IP2

J. Hawxhurst, RI

J. Jamison, PNL

'.

k

to 78

5//4/86

5/l@6

0FFICIAL RECORD COPY

. -

_ _ . .

._

_

.

-

_.

!

,

.

.

Enclosure I

Team Schedule and Assignments

!

A.

Schedule

i

l

Monday, June 2

Team members arrive at hotel

i

j

Tuesday, June 3

0800-1030 Accesstrainingandbadging

,

1100 Controller-observer briefing

!

1500 NRC team meeting

'

Wednesday, June 4

0610 Exercise begins

1745 Exercise ends

2

,

1815 Initial NRC team debriefing

2

Thursday, June 5

0830 NRCteamdebriefingcontinueg

1100 Consolidated Edison critique

1

l

1330 NRC exit meeting

j

1330 FEMA / State / County meeting

Friday, June 6

1000 NRC/ FEMA public meeting

,

fSimulatorbuildingconferenceroom

!

E0F conference room

C

.

,

4

l

'

!

!

I

i

l

4

3

0FFICIAL RECORD COPY

l

_.

.

-

_

_

_

-

.-

1

4

.

.

.

Enclosure II

B.

Team Assignments

!

1.

Control Room

Gary Weale, PNL

2.

Technical Support Center

Larry Rossback, SRI, IP2

t

3.

OSC/ accountability

Darrell Fisher, PNL

4.

E0F

Ed Podolak, HQ

I

5.

EOF

Charles Amato, RI

6.

On-site team

John Davis

{

,

7.

Off-site team

Joseph Stephen

8.

JNC

Davo Vito

9.

RAC Observer

Jim Hawxhurst

fTeam Leader / Floating Observer until E0F activation ordered

.i

,!

Senior Inspector / Floating Observer. Will observe JNC after activation

i

a

1

1

0FFICIAL RECORD COPY

4

f

i

!

!

l

.

-