Forwards Insp Repts 50-282/98-20 & 50-306/98-20 on 981023- 1203.Performance Remained Strong
ML20198H767
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/18/1998
From: Burgess B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20198H772 List:
References
50-282-98-20, 50-306-98-20, NUDOCS 9812300014
Download: ML20198H767 (3)


See also: IR 05000282/1998020

Text

.

~-

-

. - ..

.

.. .~

.._

-.-

- -

- -

-

. - . . . .

_

. - =

h*31'oug#o.

UNITED STATES

  • #

NUCLEAR REGULATORY COMMISSION

8

REGION 111

'y.

LISLE,ILLINOls 60532-4351

]

801 WARRENVILLE ROAD

        • +

December 18, 1998

Mr. M.Wadley

President, Nuclear Generation

Northern States Power Company

' 414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

PRAIRIE ISLAND INSPECTION REPORT 50-282/98020(DRP);

50-306/98020(DRP)

Dear Mr. Wadley:

On December 3,1998, the NRC completed an inspection at your Prairie Island Nuclear

Generating Plant. The enclosed report presents the results of that inspection.

. Based on the results of this inspection, the inspectors concluded that performance remained

strong. A challenging and unexpected dual unit outage was effectively managed and

controlled. Severalinfrequently performed operations and complex maintenance tasks were

conducted well and in a controlled and deliberate manner. Examples of these tasks included

extended operation of both units with reduced reactor coolant inventory, steam generator and

pressurizer manway repairs, and emergency diesel generator five-year preventive maintenance

activities. Operators also responded well to two unexpected reactor trips and conducted a

'

reactor startup without problems.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its

enclosure, will be placed in the NRC Public Document Room.

Sincerely,

1

l't'd

Bruce Burgess, Chief

Reactor Projects Branch 7

Docket Nos.: 50-282,50-306

License Nos.: DPR-42, DPR-60

,

l

Enclosure:

Inspection Report 50-282/98020(DRP);

50-306/98020(DRP)

cc w/ encl:

Plant Manager, Prairie Island

State Liaison Officer, State of Minnesota

State Liaison Officer, State of Wisconsin

i

Tribal Council, Prairie Island Dakota Community

,

9812300014 981218

PDR

ADOCK 05000282

G

PDR

j

4

w

_ . _ .

_ . . . ..

_

_

_ . _ , .

_

._ ._.

..

_ _.

_ _

. . _ . . . _ _ _

. . .. ;V ,a

4 -.

.4

y.

]

!

M. Wadley .

-2-

Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/ encl

C. Pederson, Rill w/enci

B. Clayton, Rill w/enci

SRI Prairie Island w/ enc!

DRP w/enci

TSS w/enci

DRS (2) w/enct

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

1

\\

\\

l

,

.

o90023

~

l

.

- - - .

-

l,

e

e

December 18, 1998

Mr. M. Wadley

President, Nuclear Generation

i

Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

PRAIRIE ISLAND INSPECTION REPORT 50-282/98020(DRP);

50-306/98020(DRP)

!

Dear Mr. Wadley:

I

On December 3,1998, the NRC completed an inspection at your Prairie Island Nuclear -

Generating Plant. The enclosed report presents the results of that inspection.

Based on the results of this inspection, the inspectors concluded that performance remained

i

strong. A challenging and unexpected dual unit outage was effectively managed and

l

controlled. Severalinfrequently performed operations and complex maintenance tasks were

l

conducted well and in a controlled and deliberate manner. Examples of these tasks included

'

extended operation of both units with reduced reactor coolant inventory, steam generator and

l

pressurizer manway repairs, and emergency diesel generator five-year preventive maintenance

j

l_

activities. Operators also responded well to two unexpected reactor trips and conducted a

L

reactor startup without problems.

!

l.

. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its

,

L

_ enclosure, will be placed in the NRC Public Document Room.

Sincerely,

/s/ Bruce L. Burgess

Bruce Burgess, Chief

f

Reactor Projects Branch 7

,

L

1

Docket Nos.: 50-282, 50-306

License Nos.: DPR-42, DPR-60

!

Endosure:

Inspection Report 50-282/98020(DRP);

'

l

50-306/98020(DRP)

,

L

cc w/ encl:

Plant Manager, Prairie Island

State Liaison Officer, State of Minnesota

l

State Liaison Officer, State of Wisconsin

_.

Tribal Council, Prairie Island Dakota Community

DOCUMENT NAME: G:\\PRAl\\PRA98020.DRP

L

To receive a copy of this document, Indicate in the box "C" = Copy w/o attach /enci"E" =

l

- Copy w/ attach /enci "N" = No copy

[

OFFICE

RilllM/

l A/

Rill, #

lA/

l

l

NAME

KurdissWr61

BtMAs

'

DATE

12//ff/98

12fM/98

,

L

OFFICIAL RECORD COPY

e

l'

_

_

_ _ - -