.._
-.-
- -
- -
-
. - . . . .
_
. - =
h*31'oug#o.
UNITED STATES
- #
NUCLEAR REGULATORY COMMISSION
8
REGION 111
'y.
LISLE,ILLINOls 60532-4351
]
801 WARRENVILLE ROAD
- +
December 18, 1998
Mr. M.Wadley
President, Nuclear Generation
Northern States Power Company
' 414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
PRAIRIE ISLAND INSPECTION REPORT 50-282/98020(DRP);
50-306/98020(DRP)
Dear Mr. Wadley:
On December 3,1998, the NRC completed an inspection at your Prairie Island Nuclear
Generating Plant. The enclosed report presents the results of that inspection.
. Based on the results of this inspection, the inspectors concluded that performance remained
strong. A challenging and unexpected dual unit outage was effectively managed and
controlled. Severalinfrequently performed operations and complex maintenance tasks were
conducted well and in a controlled and deliberate manner. Examples of these tasks included
extended operation of both units with reduced reactor coolant inventory, steam generator and
pressurizer manway repairs, and emergency diesel generator five-year preventive maintenance
activities. Operators also responded well to two unexpected reactor trips and conducted a
'
reactor startup without problems.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its
enclosure, will be placed in the NRC Public Document Room.
Sincerely,
1
l't'd
Bruce Burgess, Chief
Reactor Projects Branch 7
Docket Nos.: 50-282,50-306
,
l
Enclosure:
Inspection Report 50-282/98020(DRP);
50-306/98020(DRP)
cc w/ encl:
Plant Manager, Prairie Island
State Liaison Officer, State of Minnesota
State Liaison Officer, State of Wisconsin
i
Tribal Council, Prairie Island Dakota Community
,
9812300014 981218
ADOCK 05000282
G
j
4
w
_ . _ .
_ . . . ..
_
_
_ . _ , .
_
._ ._.
..
_ _.
_ _
. . _ . . . _ _ _
. . .. ;V ,a
4 -.
.4
y.
]
!
M. Wadley .
-2-
Distribution:
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/ encl
C. Pederson, Rill w/enci
B. Clayton, Rill w/enci
SRI Prairie Island w/ enc!
DRP w/enci
TSS w/enci
DRS (2) w/enct
Rlli PRR w/ encl
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
1
\\
\\
l
,
.
o90023
~
l
.
- - - .
-
l,
e
e
December 18, 1998
Mr. M. Wadley
President, Nuclear Generation
i
Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
PRAIRIE ISLAND INSPECTION REPORT 50-282/98020(DRP);
50-306/98020(DRP)
!
Dear Mr. Wadley:
I
On December 3,1998, the NRC completed an inspection at your Prairie Island Nuclear -
Generating Plant. The enclosed report presents the results of that inspection.
Based on the results of this inspection, the inspectors concluded that performance remained
i
strong. A challenging and unexpected dual unit outage was effectively managed and
l
controlled. Severalinfrequently performed operations and complex maintenance tasks were
l
conducted well and in a controlled and deliberate manner. Examples of these tasks included
'
extended operation of both units with reduced reactor coolant inventory, steam generator and
l
pressurizer manway repairs, and emergency diesel generator five-year preventive maintenance
j
l_
activities. Operators also responded well to two unexpected reactor trips and conducted a
L
reactor startup without problems.
!
l.
. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its
,
L
_ enclosure, will be placed in the NRC Public Document Room.
Sincerely,
/s/ Bruce L. Burgess
Bruce Burgess, Chief
f
Reactor Projects Branch 7
,
L
1
Docket Nos.: 50-282, 50-306
!
Endosure:
Inspection Report 50-282/98020(DRP);
'
l
50-306/98020(DRP)
,
L
cc w/ encl:
Plant Manager, Prairie Island
State Liaison Officer, State of Minnesota
l
State Liaison Officer, State of Wisconsin
_.
Tribal Council, Prairie Island Dakota Community
DOCUMENT NAME: G:\\PRAl\\PRA98020.DRP
L
To receive a copy of this document, Indicate in the box "C" = Copy w/o attach /enci"E" =
l
- Copy w/ attach /enci "N" = No copy
[
OFFICE
RilllM/
l A/
Rill, #
lA/
l
l
NAME
KurdissWr61
BtMAs
'
DATE
12//ff/98
12fM/98
,
L
OFFICIAL RECORD COPY