ML20198G547

From kanterella
Jump to navigation Jump to search
Notification of 761215 Meeting W/Util in Bethesda,Md to Discuss Current NRC Position Re Component Cooling Water Supplied to Reactor Coolant Pump Seal Hxs.Preliminary Agenda Encl
ML20198G547
Person / Time
Site: Washington Public Power Supply System
Issue date: 12/09/1976
From: Cox T
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
References
CON-WNP-1136 NUDOCS 8605290662
Download: ML20198G547 (4)


Text

.

DEC 0 9 pyyy Docket Hos. 50-460 and 50-513 MEMORANDUM FOR: Olan D. Parr, Chief. Light Wate; Reactors Branch No. 3 DPH FROM:

T. Cox, Project Manager, Light Water Reactors Branch !!o. 3. DPM

SUBJECT:

FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTE!!

l (WPPSS)

TIME & DATE:

3:30 A.M., Wednesday December 15, 1976 LOCATION:

Room P-110 Phillips Building Bethesda, Maryland i

t PURPOSE:

To discuss the current staff position regarding component cooling water supplied to reactor coolant pump motor and bearing coolers and purap.

seal heat exchangers. This position was given to WPPSS by letter dated October 19, 1976, 0. D. Parr to J. J. Stein. See attached preliminary agenda.

PARTICIPANTS:

NRC T. Cox, W. LeFav, S. Israel, V. Benaroya, D. Basdekas, R. Kirkwood WPPSS A. Hosler I

I orr.. s.

8605290662 761209 suama==

  • PDR ADOCK 05000460 A

PDR onve *

.. l l

_.. l Forma ABC 318 (Rev. 9 53) AECM 02+3

  1. u. s. oovsamuemt eminesma orrics: tev4.ssa.see

f 4

45 rs,v %T6

~e 2-l D&W f

R. Starkey, J. Happell, A. McBride, R. Brockman, H. Baker VE&C V. Mani, A. J. Friedman, E. Richardson, W. Gibson, J. Hill, S. Schumer

.Origir.alSIEd ryhoIna8901f i

T. Cox, Project Manager Light Water Reactors Branch No. 3 Divisic,n of Project Management

Enclosure:

As Stated I

i i

l l

l l

l 1

l I

orrica >

sungams >

DATE M Forma AEC 318 (Rev. 9 53) AECM 0240

  1. u. s. oovanmuswr enantine orrecas sen.sas.ies 4

j EllCLOSURE 1

MEETIriG AGEtIDA WPPSS NiD flRC STAFF i

DECEMBER 15, 1976 WPPSS wants to discuss details of staff position regarding component cooling water (CCW) supply to reactor coolant (RC) pump, pump motor and seal coolers. They are primarily interested in that option in the position that pemits upgrading the CCW to Seismic Category I, Quality Group C, and ASME Section III Class 3, and other requirements.

l Specific questions advanced by WPPSS prior to the meeting area i

1.

If " safety grade" automatic protection is supplied on loss of cooling water, or CCW is single active failure proof and designed I

to accept moderate energy line cracks, must they also design CCW to Seismic Category I, Quality Group C and ASME III, Class 37 l

2.

To what extent must CCW system meet upgraded criteria, e.g.,

back to and including the makeup source for the systaa?

3.

What are staff's detailed requirements on safety grade automatic j

protection of plant in the event of CCW failure to one or more pumps.

I i

I I

i t

8U""""

omes >

Forse AIC 318 (Rev. P.5)) AECM 0240

  1. u. s. oovanNusar PalNTING OPPICs3 le?4 988 9 SS

s k

\\

MEETING NOTICE DISTRIBUTION Docket File NRC PDR D. Ross Lccal POR R. Tedesco TIC J. Knight LWR-3 File S. Pawlicki NRR Reading I. Sihweil ACRS (16)

P. Check IE (3)

T. Novak SD (7)

Z. Rosztoczy OELD V. Benaroya Receptionist G. Lainas B. Rusche T. Ippolito E. Case V. Moore J. Miller R. Vollmer R. Boyd M. Ernst R. DeYoung W. Gammill V. Stello G. Knighton D. Skovholt B. Youngblood F. Williams W. Regan J. Stolz D. Bunch K. Kniel J. Collins

0. Parr W. Kreger D. Vassallo R. Ballard R. Clark M. Spangler T. Spets J. Stepp P. Collins L. Hulman C. Heltemes H. Smith R. Houston M.Rushbrook(3)

R. Heineman Project Manager - T. Cox H. Denton NRC Participants S. Varga OPA H. Berkow W. LeFav B. Faulkenberry, IE S. Israel W. Butler D. Basdekas Dr. Harold L. Ornstein R. Kirkwood M. Srinivasan

-