Forwards Review of PSAR Sections 13.2 & 13.5 Re Conduct of Operations.Info Acceptable
ML20198G444
Person / Time
Site: Satsop
Issue date: 04/18/1975
From: Collins P
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
References
CON-WNP-1308 NUDOCS 8605290590
Download: ML20198G444 (3)


Text

7 i

- ;_ _.- .-... s .a _JG , - .

L.

umtro srArts ',

NUCLEAR REGULATORY COMMISslON M p WASHINGTON D. C. 20555

' APR 181975 j Docket No: STN 508 i.

. O. D. Parr, Chief Light Water Reactors Branch 1-3, RL RESPONSE TO REVIEW PLAN ASSIGNMENT-WASHINGTON PUBLIC POWER SUPPLY SYSTEM REVIEW 0FCONDUCTOFOPERATIONS(SECTIONS 13.2AND13.5)

Plant Name: WPPSS 3 & 5 .

l

! Docket No: STN 508/509 Licensing Stage: CP Branch & Project Manager Requesting Assistance: LWR l-3, P. O'Reilly Review Branch Involved: RL:0LB Requested Completion Date: May 16,1975 Description of Review: Review of Conduct of Operations, Sections 13.2 and 13.5 Review Status: SER Reports We have completed our review of Sections 13.2 and 13.5 of the PS.Yl.

As shown in the attachments, we have concluded that the information submitted meets the requirements for approval.

4

- J., -

  1. / .

Paul F. Collins Chief

< d-Operator Licensing Branch Division of Reactor Licensing

Enclosure:

SF.R Reports

, cc: w/ enclosure D. Skovholt, RL R. Vollmer, QA -

R. DeYoung, ADRL P. O'Reilly, LPM W. Mcdonald, OPS ou lT#o ' y/ ,'

s 5 8 8605290590 750418 s# ADOCK 05000500 k+'%.d* PDR A PDR l

4 i

~ .

s .. .

- su.

- -..- .. ......,...a. - , , ,

_ g 13.2 TRAINING PROGRAM _

The overa11' conduct and administration of the plant ,

training prograr is the responsibility of the Plant Superintendent. The Plant Training Coordicator may be delegated the responsibility of development and implementation of the program.

The applicant states that a training program will be established to provide plant personnel.withoufficient knowledge and operating experience to start up, operate, and maintain the plant in a safe and efficient manner.

The training program is to be developed by WPPSS with principle assistance from the Combustion Engineering Company.

Training for the personnel to be licensed .will include; Basic Nucicar Training; Research Reactor Training and t

Operation; Observation at an operating PWR; a Plant -

System lecture series; Simulator Training and practical

{i On-the-Job training. Maintenance and technical staf f 8 personnel will receive specialized training in their particular iicids. Station personnel will als > receive

  • f training in security and energency plans, adrainstrative t

procedures and radiation protection, as appropriate.

The information submitted relative to these subjects is satisf actory at the construction permit stage of review, l for the preoperational test prograra. $se operar r licensing, and for fuel loading.

e e

l .

1 I,

l .

i 4

.,

  • ee d a

f --

I.

.* . . . . .. ..- .. . u. . - . - - - *- ... - .-..

.. L

  • ' I 13.5 PLANT PROCEDURES
  • All safety related operations will be performed using

. detailed and approved procedures. Procedures will be prepared for the plant to cover all normal and reasonably foreseeable abnormal operating conditions. The following types of procedures will be prepared:

a. Administrative Procedures
b. General Operating Procedures ,
c. Systems Procedures *
d. Instrumentation Procedures
e. Chemical Control Procedures
f. Emergency, Procedures ,

-3 Surveillance Procedures

h. Maintenance Procedures
1. Radiation Control Standards .and Procedures J. Environmental Protection Procedures
k. Refueling Procedures
1. ~ Quality Assurance Procedures -

~

The dministrative and Operating Procedures will be completed and reviewed at least three months prior to fuel loading.

The information submitted relative to these subjects is

, satisfactory at the construction permit stage of r2 view.-