ML20198G436
| ML20198G436 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 06/04/1976 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20198G441 | List: |
| References | |
| CON-WNP-1123 NUDOCS 8605290584 | |
| Download: ML20198G436 (1) | |
Text
N
}
L JUN 4 1376 l
Harold Denton, Director, Division of Site Safety and Environmental Analysis R. Heineman, Director, Division of Systems Safety 1
TECHNICAL ASSISTANCE REQUEST NO. LWR-1 (13-76)
Your assistance is requested for the following:
PLANT NAME:
WNP-1, 4 DOCKET NOS:
50-513 l
RESPONSIBLE BRANCH:
LWR-1 l
CONTACT:
Tom Cox, Project Manager X27391 TECHNICAL REVIEW BRANCH:
Geology-Seismology, Hechanical Engineering 1
i and other technical assistance as deemed necessary by appropriate DSS or DSE management.
TARGET COMPLETION DATE:
July 15, 1976
[
DESCRIPTION OF REQUEST:
Review Amendment 21 to WNP-1, 4 PSAR.
Evaluate changes specified in cover letter j
to amendment (copy enclosed).
Item 1: Revisions to Section 2.5 and Appendix 2P: The infomation submitted in the DISTRIBUTION:
amended PSAR is the final version of a report
[DCket File WPPS$ made on soll density investigations, LWR-1 File which report was reviewed by the staff and J. Stolz commented on in memoranda dated 2/24/76 and T. Cox 3/10/76 (both from W. Gamill to R. DeYoung).
F. Williams Applicants PSAR amendment is intended to H. Smith (3) respond to those coments.
Item 2: Revision to Table 5.2-1: Examine for compliance with 10 CFR 50.55a.
"^
PDR Light Water Reactors Branch No.1 Division of Project Management
Enclosure:
cc:
W. Mcdonald, MIPC Letter D.Renberger(WPPSS) to F. DeYoung Director, OHRR, dated 4/20/76.
- b. Varga (Amendment 21 transmittal letter)
H. Berkow anzarella LWR-1 LW -1 o,,,,,,
TCox:Id Y Sto 6/ OJ /76
_6/ k./76 Forma AEC-)IS (Rev. 9 53) AICd 0240
- u. e. sovsmaassar reinvime orricas se74.ese-see
_