ML20198G346

From kanterella
Jump to navigation Jump to search
Informs That 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps, Will Be Submitted by 980119
ML20198G346
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/02/1998
From: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-98-03, BVY-98-3, GL-97-04, GL-97-4, NUDOCS 9801130005
Download: ML20198G346 (1)


Text

- _ _ - _ _ _ - _ _ _ - - -

~

VERMONT YANKEE

'IQ CNUCLEAR POWER CORPORATION:

7 85 Old Ferry Road, Brattleboro,VT 05301 7002 1

(802) 257 5271 i

DoNAto 'A, RED January 2, I990 SENIOR VICE PRESIDENT, BW 98 03 OPERATIONS --

-(802) 258-4192 :

United States Nuclear Regul6 tory Commission ATTN: Document Control Desk

. Washington, DC 20665

References:

(a) -

Letter, USNRC to WNPC, Generic Letter 97 04, Assurance of Suffloient Not Positive Suction Head for 8 Emergency Co o Cooling and Containment Heat Removal Pumps, dated 10/7/97

@)~

Letter, WNPC to USNRC,30 day Response to Generic Letter 97-04, BW 97-142, dated 10/31/97 Suhlect:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)-

Sutwntttel of 96 day Response to Generic Letter 97-04 On October 7,1997 the Nuclear Regulatory Commission issued Generic Letter 97-04 (Reference 4 regarding a potentietty sit,nificant lesue which may have generic implicaticns with regerd to the pedormance of Emergency Core Cooling System pumps. The generic letter requested, within 30 days, a written response indicating (a) whether or not the requested information will be submitted, and (b) whether or not the requested information will be submitted within the requested time period. Vermont Yankee provided a 30-day response (Reference b) and committed to providing the requested Information within the 90 day time period specified. The 90 days specified in the generic letter corresponds to January 5,1998, 1

-We have fourdi that our intomal preparation, review and approval of the response to this generic letter, M is taking longer than originally anticipated, and that in order to properly prepare the submhtal, /

additional time wi'l be necessary. Therefore, ws now propose to subrnit the 'nformation requested in the generic letter by January 19,1998, i

S0&

Should you have any questions or concerns with this chenge in schedule, please contact us.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORP s

l 20001-

oon, noio Senior Vice President, Operations cc

' USNRC Region 1 Administrator USNRC Project Manager WNPS -

n:

USNRC Rasident inspector WNPS Vermont Department of Public Service l

  • c) 9901130005 990102 c e.

PDR ADOCK 05000271:

.P PDR

_ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _