Forwards SER for Portions of PSAR for Which Auxiliary & Power Conversion Sys Branch Has Primary Responsibility.Psar Info Acceptable W/Listed Exceptions Including Capability of Auxiliary Feedwater Sys to Assure Shutdown
ML20198G272
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/28/1975
From: Tedesco R
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-1035 NUDOCS 8605290384
Download: ML20198G272 (4)


Text

'

~~~ t M_ M P-) L>

6 o

.~

-.- \\

s $75

- - - ~

DISTRIBUTION:

~

Docket Files (2)

L Reading Docket Nos. 50-460 L:CS 50-513 L:APCSB Yoss A. Moore, Assistant Director for Light Water Reactors Group 2, L

^

SAFL'TT EVALUATION REPORT Plant Names Washington Public Power Supply System Nuclear Projects No.1 and 4 (WNP-184) l Licensing Stage:

CP l

Docket Ninnber: 50-460; 50-513 Responsible Branch: LWR 2-3 Project Manager: Thomes Cox Requested Completion Date: Jannery 23, 1975 The enclosed Safety Evaluation Report covers those portions of the P, pag for which the Auxiliary and Power Conversion Systems Branch has primary responsibility.

We prepared two formal requests for information and submitted them to the applicant, the first dated February 22, 1974 and the second dated October 11, 1974. The' plant site was changed between the first and second requests and as a result the design of all systems within our scope of review were changed. In our second Intter dated October 11, 1974 we stated that additional requests might be required if the responses to the second round of regnests were 4=enemplate. However, we feel this will be unnecessary as a result of our review of the applicants responses.

Based upon the results of our review of the PSAR we find the PSAR infore,ation l

to be acceptable with t.he exception of the following itemas t

1.

The capability of the auxiliary feedwater system to assure facility cold shutdown following a pipe break in the main' or auxiliary feedwater line inside contai= ant coincident with a single active I

failure in the a==414=ry feedwater train supplying the operable staan generator.

2.

The auxiliary feedwater system does not meet our branch position which requires diversity of power supplies to the control valves on lines to each staam generator.

[WM l

4 8605290384 750128 PDR ADOCK 05000460 E___

ppg O F FIC E >

e I

L CS: APCSB~ "D CS~ APCS,H/- L:CS~

~ ~ " ~ " - ~ " ~ ' -

~ " ~ ~

sunwams >

(

oavu >

t._,_.,

.......g..

j i

j Foesa AEC 518 (Rev. 9 53T'ARCMGl40

7'

W y1 eoEs~a' uawr enentswe or.,cas i.74.sto.sse m

M A E $Q voas A.

acoro.

Theem itsee seset be resolved in a future anwndnent to the PSAE and a i

suboegment supplement to this report.

Origina} syg y -

{

Robeet L. c%

y Robert L. Tedesco, Assistant Director l

for Containamat Safety Direstorate of Licensir.g l

l Enclosure l

As Stated ces (w/o emel.)

a. ci d ssee j

'd. McDoemld (w/

=1.)

s. sanauer F. Schroeder
1. Elecker
8. Yorge D. Eisenbat J. Carter I

A. Scisuuncer T. Cox l

J. Glynn i

C. Long W. LaFave i

l l

t f

1 l

4 E

e,.

m os-

...s-.

-..~.-..-e....-...

~

.- ~

."-=e-.*--

'~

eunaaae

  • n arg h 1

Forw ABC-3ta (Rev. 9 5)) AACM 0240 W w. e. oovammusar pa1=1hae OPP.cas ser4.sae-ese

'i

'" ~~'

4 4

a* 1 N

a M ~

NY S

{ Q g

l

. DISTRIBUTION:

Docket Files (2) 2 8 1975 L Reading i

Docket Nos. 50-460 L:CS l

50-513 L:APCSB_

Yoss A. Moore, Assistant Director for Light Water Reactors Group 2. L SAFETY EVALUATION REPORT Plant Names Washington Public Power Supply System Nuclear Projects No.1 and 4 (VNP-1&4) t Licensing Stage: CP Docket Number: 50-460; 50-513 l

Responsible Branch: LWR 2-3 Project Manager: Thomas Cox Requested Completion Date: Janu.ary 23, 1975 The enclosed Safety Evaluation Report covers those portions of the RSAR for which the Auxiliary and Power Conversion Systems Branch has primary responsibility.

1 We prepared two formal requesta for information and submitted them to the applicant, the first dated February 22, 1974 and the second dated October 11, 1974. The plant site was changed between the first and second requests and as a result the design of all systems within our scope of review were j

changed. In our second letter dated October 11, 1974 we stated that i

additional requests might be required if the responses to the second round of requests were incomplete. However, we feel this will be unnecessary l

as a result of our review of the applicants responses.

Based upon the results of our review of the PSAR we find the PSAR informat, ion to be acceptable with the exception of the following items:

1.

The capability of the auxiliary feedwater system to assure facility cold shutdown follow 1ng a pipe break in the rain or auxiliary t

feedvater lina inside containment coincident with a single active i

failure in the auxiliary feedwater train supplying the operable steam generator.

2.

The auxiliary feedwater system does not meet our branch position which l

requirac diversity of power supplies to the control valves on lines to each steam generator.

l

.y f+

t

^

L:CS...f....

a"'e =

  • L S*

.L:ES:AEC

  • uaaa==>

W. Le ave..

C ng R....Tedesco.

1/4//75 1/ 2275 L,

16.fl.75..

=ar= >

Forne AEC-)l3 (Rev 9 53) A.ECM 0260 W u. e, eovannusut ramtme orricas tota.sse. tee

T st, G

4 JAN 28 W 5 so..

o.

. uom These itama must be resolved in a future amendment to the PSan and a subsequent supplement to this report.

Orfgfsal St.qued by Ilohert L. Tedeace i

l Robert L. Tedesco, Assistant Director for Contain= ant Safety Directorate of Licensing

{

Encloonre:

As Stated

[

ces (w/o encl.)

A. Ciambusso I

W. Mcdonald (w/ encl.)

l t

S. !!.taauer l

F. Schroeder L Klecker I

S. Varga c

j D. Eisenhet J. Carter A. Schweneer j

T. Cox J. Clynn

(

C, Long W. LaFave l

}

l

. j 1

i I

l I

i i

l I

i I

I ePNC 8

  • s eun=a asa >

i osse n

- ~ - - - ~ ~

foran AEC Sta (Rev. 9-53) AECM 0240 W v. o. novenansamt passerine oericas esta.sae.sse

..