ML20198G256
| ML20198G256 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 05/25/1976 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1119, RTR-REGGD-01.075, RTR-REGGD-1.075 NUDOCS 8605290344 | |
| Download: ML20198G256 (2) | |
Text
.
D m
- ,7 s
(y hf~
'*', ]
NAY g 5 W3 Docket Nos'. 50-460
\\ 50 v
R. C. DeYoung, Assistant Director for light Water Reactors, DPH WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP UNITS NUMBERS 1 AND 4 -
REVIEW OF POST-CP RESPONSES TO OITTSTANDING SAFETY REVIEW ITEMS 5, 6, AND 7, IN LETTER FROM WPPSS DATED APRIL 2,1976 (TAR 3701)
Plant Name:
WNP Units Number 1 and 4 Docket Numbers:
50-460/513 9 Responsible Branch LWR 1 and Project Leader:
T. Cox Systems Safety Review Branch Involved:
EIGCS Branch Review Status:
Complete By letter from J. F. Stol: to R. lleineman dated April 16, 1976, you requested that we develop comments and/or requests. or information for f
transmittal to the applicant on outstanding items number 5, 6, and 7 remaining from thu CP review. Our, comments on these outstanding itens are as follows:
Item No. 5 - App 2.ication of Regul_atory Guide 1.75 to BGW Supplied Safety and Protection System Cabine_ts The B4W program intended to demonstrate compliance of their equipment to the provisions of Regulatory Guide 1.75 is presently in the planning stage and the testing schedules for isolation amplifiers and electro-magnetic interference have not been established. This information was supplied to us by telecopy of a memorandum from C. S. Banwarth to T. Cox, dated' Hay 14, 1976, regarding the BSAR-205 and WNP 1 and 4 applications.
Since the subject item pertains to BGW supplied equipment, we require that the applicant make a commitment to implement the resolution found acceptable as a result of our review of BGW's test program presently under review on the BSAR-205 docket. Furthermore, the applicant should also make a com:nitment that in case the BGW program is either not com-pleted within the time required for the WNP Units Number 1 and 4 OL review, or the BGN test results are found unacceptable by the staff, the applicant will provide a modified design to satisfy Regulatory Guide 1.75 requirements.
8605290344 760525 orric = >
PDR ADOCK 05000460 i'
gynn Au t >
s--
PDR A
DATS 5
. Forse AEC 318 (Rev. 9 53) AECM 0240 TT u, en eovsneenstar enmvine orreces esta.see.too
c.
~
R. C. DeYoung 2
pp 9 5 pm Item 6 - Electrical Separation Test Results for RTDC i
The applicant has found it necessary to reschedule subnittal of infor-i mation on this item for September,1976, because of a delay in the I
procurement of these sensors.
We will review this information when submitted under the new schedule.
Item 7 - RPS-II Single Failure Analyses In response to our Question 7.34 the applicant had originally made the commitment to submit a B6W topical report sddressing our concerns on the subject item by December 15, 1975. The related analyses are now scheduled for completion in September, 1D77. We will review the requested information hon submitted, per the revised schedulo; however, tho applicant should be made aware that a timely subnittal of this infor-mation for the OL stage of review is very important, and any further delays might adversely affect the OL review schedule.
DISTRIBITTION DOCKET FILES Original Signed by NRR READING T. A. Ippolito EIC READING
~
PS READING Robert L. Tedesco, Assistant Director R. TEDESCO for Plant Systems Division of Systems Safety cc:
S. Hanauer R. Heineman P. Schroeder R. Boyd J. Stolz T. Cox T. Ippolito M. Srinivasan C. Miller D. Tondi R. F4tzpatrick D. Basdekas W. Mcdonald J. Glynn EICSB:PS EI
- PS EI. ":P y
.,,,C.,.