ML20198G186

From kanterella
Jump to navigation Jump to search
Advises That Exam of Excavation Should Be Scheduled for 1-month Period Beginning 760405 During Which Excavation Will Be Down to Ringold Formation & Uncovered,Per Util 760323 Notification
ML20198G186
Person / Time
Site: Washington Public Power Supply System
Issue date: 03/24/1976
From: Cox T
Office of Nuclear Reactor Regulation
To: Mcmullen R
Office of Nuclear Reactor Regulation
References
CON-WNP-1112 NUDOCS 8605290272
Download: ML20198G186 (1)


Text

,

MAR 2 41976

~

,/

Docket ilos: 50-460 and 50-513 I

Richard 8. fichu 11en, Geologist, Geology & Seismology Branch, DSE i

WriP-4 EXCAVATI0l4 WPPSS notified me by telephone on March 23, 1976, that the WriP-4 excavation would be down to the Ringold fonnation by April 5,1976 i

and would remain uncovered (by the mudmat) for about a month. Your visit to examine the excavation should be planned for some time in that period. Logs and maps will be available.

hami tecativ Thomas Cox, LPt1 i

Light Water Reactors Branch fio.1 cc: John F. Stolz J

.,_, g. C. Stepp.

Docket Files t

i I

l l

LWR-1 8605290272 760324 e..'....

TCox:1d 8 PDR ADOCK 05000460 PDR

.3/ 84 /76 l

l o.

Foems ABC.)ls (Rev. 9 53) AECM 0240

  1. u. s. aavsenesamt enintino osrics so?..ese. nee

-. _ -,