Requests Schedule for Completion of First Round Review of Util & Suppl Docketed 751110 Re Reactor Pressure Vessel Support Structure Design by 760131.Review Should Be Completed by June 1976
ML20198G034
Person / Time
Site: Washington Public Power Supply System
Issue date: 12/30/1975
From: Stolz J
Office of Nuclear Reactor Regulation
To: Heineman R
Office of Nuclear Reactor Regulation
References
CON-WNP-1103 NUDOCS 8605290198
Download: ML20198G034 (1)


Text

,

i e ekd &

Docket Nos.: 50-460 and 50-513 j

R. Heineman, Director, Division of Systems Safety, NRR REACTOR PRESSURE VESSEL SUPPORTS - WNP-1,4 1

Applicant submitted a report on the Subject Support Structure Design on September 3, 1975. This report is the subject of a current Technical Assistance Request to your office dated September 30, 1975 (attached).

Applicants' September.3 report was supplemented by additional information docketed November 10, 1975. The supplement dealt primarily with computational methods used by B & W to calculate vessel internal pressure differential loads.

This memo is written to request your estimate of the schedule on which you will be able to complete a "first round" review of Applicant's two submittals on this generic issue. The issue is post-CP and not reflected i

in normal Blue Book schedules. I understand that this review will be accomplished in three branches in three assistant directorates within your Division.

I believe a prompt review of Applicant's submittals is warranted because at the November 13, 1975 Radiological Safety Hearing on UNP-1,4, we stated, in effect, that Applicant's September 3 and November 10 documents considered all the applicable loads and that. the results presented in the documents probably would not change on further review. (Teciose m p i P,10 0 Applicant's construction schedules are such that changes in the concrete structures surrounding the vessel can be effected up to June 1976, at some engineering expense but with no construction schedule delays. If practical to do so, I believe we should exert reasonable effort to complete our review of the RPV supports issue for this Applicant prior to June 1976.

I hope that your "first round" response to Applicant's submittals can be scheduled to DRL by January 31, 1976.

\\

860529019e 751P30 PDR ADOCK 0500 60 John F. Stolz,-Chief R

A Light Unter Reactors Project Branch 1 Division of Project Ifanagement

Attachment:

TAR dated September 30, 1975 W.

-LWR 2-3 L

1

.TCox/BK g to.;

.u....*

. J2/3125.

12/3(/75 o.v.

  • Form AIc.313 (Rev. 9 53) AECM 0240 W u. s. eavsan-ane pnentino orrecs: esta.sas.see