ML20198G026

From kanterella
Jump to navigation Jump to search
Summary of 751111-13 Radiological Safety Hearing in Richland,Wa Re All Safety Matters Except Financial Qualifications
ML20198G026
Person / Time
Site: Washington Public Power Supply System
Issue date: 11/18/1975
From: Cox T
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
CON-WNP-1102 NUDOCS 8605290192
Download: ML20198G026 (4)


Text

.

b

.i

?

NOV. I 81975 DOCKET NOS:

50-460 and 50-513 APPLICANT: Washington Public Power Supply System (WPPSS)

FACILITY: WNP-1,4

SUMMARY

OF RADIOLOGICAL SAFETY HEARING FOR THE WNP-1,4 FACILITY The hearing was held on November 11, 12, and 13, 1975 in Richland, Washington. The hearing was closed about 1:00 p.m. Thursday, November 13, 1975 after the post-hearing schedulo for submittal of proposed findings and conclusions was discussed. The hearing did cover, as planned by the parties, all safety matters for both units 1 and 4 excepting the Applicant's financial qualifications to construct the -4 unit. An ASLB decision on CP issuance should be forthcoming prior to December 25, 1975. Staff proposed findings and conclusions, including a proposed CP, will be submitted to the Board on December 8, 1975.

Transcripts are available from ACE Federal Reporters, Inc. (Telephone 202-547-6222).

I s

Themas Cox, Project Manag Light Water Reactors Dranch 2-3 Division of Reactor Licensing cc: Washington Public Power Supply System Mr. J. R. Schmieder Joseph B. Knotts, Jr., Esq.

Mr. E. G. Ward ll'/h.

8605290192 751118 g,k PDR ADOCK 05000460 A

PDR

_'* R 2-3 orrie s

  • sume.aess >

0 g4

.3 oars >

11/ /75 Foran MC 318 (Rev 9-53) MCM 0240 W u. s. oovspmusm? Pmmvine orraess sera.sas.sse

F J

l DISTRIBUTION FOR MEETING

SUMMARY

LWR 2-3 File S. Varga Docket File (2)

R. W. Klecker NRC PDR (2)

M. Williams Local PDR R. Heineman TIC R. Tedesco PF V. Stello NRR Reading (M. Groff)

R. Maccary R. C. DeYoung H. Denton V. A. Moore J. Collins D. Skovholt G. Lainas K. Goller V. Benaroya R. Denise J. Knight D. Muller S. Pawlicki D. Vassallo L. Shao W. Butler D. Ross O. Parr T. Ippolito J. Stolz T. Novak K. Kniel B. Grimes A. Schwencer M. Spangler P. Collins R. Ballard R. Vollmer J. Kastner R. Houston W. Ga= mill R. Purple J. Norris D. Ziemann T. Cox G. Lear E. Ketchen R. Reid IE (3)

R. Clark E. Goulbourne T. Speis ACRS (16)

G. Knighton G. Dicker B. Youngblood W. Regan

DISTRIBUTION FOR MEETING

SUMMARY

LWR 2-3 File.

S. Varga Docket File (2)

R. W. Klecker NRC PDR (2)

M. Williams Local PDR R. Heineman TIC R. Tedesco PF V. Stello NRR Reading (M. Groff)

R. Maccary R. C. DeYoung H. Denton V. A. Moore J. Collins D. Skovholt G. Lainas K. Goller V. Benaroya R. Denise J, Knight D. Muller S. Pawlicki D. Vassallo L. Shao W. Butler D. Ross

0. Parr T. Ippolito J. Stolz T. Novak K. Kniel B. Grimes A. Schwencer M. Spangler P. Collins R. Ballard R. Vollmer J. Kastner R. Houston W. Gammill R. Purple J. Norris D. Ziemann
  • T. Cox G. Lear E. Ketchen R. Reid IE (3)

R. Clark E. Goulbourne T. Spels ACRS (16)

G. Knighton G. Dicker B. Youngblood W. Regan

e.

UNITED STA 'ES NUCLEAR REGULATORY COMMISSION W ASHIN G ton, 0. C. 20555 NOV.181975 DOCKET NOS:

50-460 and 50-513 APPLICANT: Washington Public Power Supply System (WPPSS)

FACILITY: WNP-1,4

SUMMARY

OF RADIOLOGICAL SAFETY HEARING FOR THE WNP-1,4 FACILITY The hearing was held on November 11, 12, and 13, 1975 in Richland, Washington. The hearing was closed about 1:00 p.m. Thursday, November 13, 1975 after the post-hearing schedule for submittal of proposed findings and conclusions was discussed. The hearing did cover, as planned by the parties, all safety matters for both units 1 and 4 excepting the Applicant's financial qualifications to construct the -4 unit. An ASLB decision on CP issuance should be forthcoming prior to December 25, 1975. Staff proposed findings and conclusions, including a proposed CP, will be submitted to the Board on December 8, 1975.

T'ranscripts are available from ACE Federal Reporters, Inc. (Telephone 202-547-6222).

1 L.

M)

M Thomas Cox, Project Manager Light Water Reactors Branch 2-3 Division of Reactor Licensing cc: Washington Public Power Supply System Mr. J. R. Schmieder Joseph B. Knotts, Jr., Esq.

I Mr. E. G. Ward i

-