Requests Confirmation of Review Schedule for WPPSS 1 License Application to Formalize Site Relocation & Addition of WPPSS 4 Duplicate Plant
ML20198F968
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/16/1974
From: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
To: Schroeder F
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0991, CON-WNP-991 NUDOCS 8605290160
Download: ML20198F968 (2)


Text

.

l l

a.,,,

1 l

AUG 161974 Docket Nos: 50-46 and 50-513 F. Schroeder, Acting Deputy Director for Technical Review, L A N.Tr TO WPPSS NO. 1 LICENSE APPLICATION TO PORMALIZE SITE RELOCATION AND ADDITIGH OF Wh7-4 DUPLICATE PLANT on August 5,1974, the Washington Public Power Supply System (WPPSS) sub-mitted an amendment to their WPPSS-1 license application docketed on October 18, 1973. This amendment is to document 1) the site relocation from the Banford 1 area to the Hanford 2 area, and 2) the addition of a duplicate plant, WNP-4, to be constructed.on the same site area as the previously planned WNP-1.

By August 8, 197,4, WPPSS plans to have submitted the last in a series of three PSAR amendments that will completely document both the site relocation and the duplicate plant addition. The duplicate plant (WNP-4) is an exact replica of the WNP-1, with the containment center located approximately 3200 feet northwest of the WNP-1.

Both WNP-1 and -4 are about 1 mile east of the Hanford 2 nuclear plant now under construction. The only systems shared between the two duplicate plants will be the cooling tower makeup and blow-down systems, the off-site power system, and the meteorological monitoring system.

On April 29, 1974, a review schedule change was approved which documented the review plan resulting from the planned site relocation. The essential element of this change was to continue the review on a branch by branch basis as the new material was submitted by WPPSS, in each case continuing the review from the Q-2 stage. PSAR amendment No. 8 and a new ER, received on July 1, 1974 completed the technical information updating for the site relocation and WNP-4 addition with the exception of that material necessary for the Site Analysis, l

Auxiliary Power and Conversion Systems and the Electrical Instrumentation and Control Systems branches. Amended material pertinent to these branch reviews is the only mate-ial expected to change significantly due to the addition of the WNP-4 plant. This information is expected to be docketed on August 8, 1974, seven days ahead of the scheduled date.

s.

8605290160 740316 l

PDR ADOCK 05000460 l

A PDR t

l

V

{_ _

. Considering that the addition of WP-4 is concurrent with the ongoing review, and that it is an entire plant duplication of the WNP-1, with the minimum of shared systema noted above, we believe that the review should continue on the current schedule. I would appreciate your confirmation of this approach.

Ori2H.*!! rn:d by i

Regcr S.Sayj A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing ces: J. ^ im., m., '.la ds/I R TR ads /BCs DISTRIBUTION Wocket (2)

LWR 2-3 Rdg AGiambusso RSBoyd VAMoore DEisenhut TCox EIGoulbourne ASchwencer LWR BCs l

e i

LWR 2-3 LWR 2 $

LWR.2x2 EK100DG DDRP 7

o,,,c a,

%%r Af.fg'_,.

n>

eva a== >

.ICox ASch'wkncer _

7 or AGiambusso- -

8f.9 [74 8/._/74 8/l(/74 5

..__/98/ -/74 o.ve w

.._ s pone AEC.313 (Rev. 9 53) AICM 0240 W u. s. novs===rne paintino oprics sera.sae. nee