ML20198F786

From kanterella
Jump to navigation Jump to search
Notification of 740710 Meeting W/Util & Weston Geophysical in Bethesda,Md to Discuss Geology & Seismology of New Site Based on Recent Util Findings from Deep Borings,Seismic Refraction Line Surveys & Trenching
ML20198F786
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/20/1974
From: Cox T
US ATOMIC ENERGY COMMISSION (AEC)
To: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0980, CON-WNP-980 NUDOCS 8605290092
Download: ML20198F786 (1)


Text

-

JUN t 0 574 Docket No. 50-460 A. Schwencer, Chief, Light Water Reactors Branch No. 2-3, Licensing MEETING WITil WASHINGTON PUBLIC POUER SUPPLY SYSTEM (WPPSS) TO DISCUSS GEOLCGY AND SEISMOLOGY OF NEW SITE Time and Date:

9:00 a.m., Wednesday, July 10,1974 Location:

Room P110 Bethesda, Maryland

Purpose:

To discuss geology and seismology of new site, based on recent findings by applicant from deep borings, seismic refraction line surveys, and trenching.

Participants:

AEC (THCox, RMcMullen and SCoplan)

WPPSS (AHosler, DTillson, l' Coombs)

Weston Geophysical (TSexton)

FUGRO (EDanehy)

' ESC (GThorne and GValentenyi)

J Original Signed Thomas H. Cox, Project Mcnager g"s Light Water Reactors Branch No. 2-3 Directorate of Licensing DISTRIBUTION:

AEC PDR RP ads R0(3) local PDR RP BCs its(3)

Docket JHendrie EIGoulbourne LUR 2-3 Rdg TR ads Receptionist j

L Rdg TR SCs RWKlecker EGCase ACRS(16)

R.9cMullen AGiambusso SVarga SCoplan RSBoyd Tilcox VAMoore RLoose DEisenhut DKartalia Lh

~

LWR ?-3

- " - ~ '

e605290092 740620

- ~ ~ ~ - -

ccT snts

....c.

W' PDR ADOCK 05000460 THCox":k'mf.

A PDR 4-.

6/.40./74

.4,.

form AFC 31s (Rev,9 53) ABCM 0240 W i. e. novs==uant eninvine o,ricas is,4.eae. nee

,s.

F1

< / a r

L

/

/.,Y r b'AIC ! +;id 4%yb' >h s

f i

[f k'*

i Y

4.

UNITED STATES

, i,.

]

ATOMIC ENERGY COMMISSION

,(

'I/\\

WASHINGTON. D.C. 20545 s,(er,r., fy ne JUN 2 o 1374 Docket flo. 50-460 A. Schwencer, Chief, Light Water Reactors Branch No. 2-3, Licensing f1EETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS) TO DISCUSS GE0 LOGY AilD SEISM 0 LOGY OF flew SITE @ V8ctm,ThMsd A.S Time and Date:

^ : C^ gr,., ',lgdr y,

y j

.,. ~,

"llib *MMIb Location:

Pn~"

Bethesda, Maryland

Purpose:

To discuss geology and seismology of new site, based on recent findings by applicant from deep borings, seismic refraction line surveys, and trenching.

Participants:

AEC (THCox, RMcMullen and SCoplan)

~

WPPSS (AHosler, DTillson, HCoombs)

WestonGeophysical-(TSexton)

FUGR0 (EDanehy)

UE&C (GThorne and GValentenyi) d Thomas H. Cox, Project Manager Light Water Reactors Branch flo. 2-3 Directorate of Licensing DISTRIBUTION:

AEC PDR RP ads R0 (3)

Lo 1 PDR RP BCs RS (3) ockeD JHendrie EIGoulbourne LWR 2-3 Rdg TR ads Receptionist L Rdg TR BCs RWKlecker EGCase ACRS (15)

RMcMullen AGiambusso SVarga SCoplan RSBoyd THCcx VAMoore RLoose DEisenhut DXartalia

~

.O pu J