ML20198F723

From kanterella
Jump to navigation Jump to search
Forwards Jm Hendrie 720807 Request for Schedule Change.Input from Accident Analysis Branch Received on 720804,in Time to Meet Accelerated Schedule for Publishing Des
ML20198F723
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/15/1972
From: Dicker G
US ATOMIC ENERGY COMMISSION (AEC)
To: Muller D
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0905, CON-WNP-905 NUDOCS 8605290062
Download: ML20198F723 (2)


Text

L

\\

.y.

,,I

~~

.u

.L. \\

AljG 151Q72 4

.. s' v '

Docket No. 50-397.a.

D. R. Muller, Aest. Dir. for Environmental Projects, L SCHEDULE CHANGE M R RECEIPT OF ACCIDENT ANALYSIS IMPUT

Reference:

Raquest for Schedule Change, Hanford 2, J. M. Hendrie, August 7, 1972 (copy enclosed) 11, 1972, A. Giambusso requested resolution of schedule By note of August change problems as identified in referenced Requast for Schedule Change.

No continuing proble: exists. Input from the Accident Analysis Branch was received by the EPM on August 4, 1972, in time to meet the accelerated schedule for publishing the DES.

It may be noted that the reason given for the change in the above reference is not literally correct. The target date for publication of the DES was advanced on short notice by management by one month.

Apparently notice of need for corresponding revision to the Accident Analysis schedule failed to reach the Of fice for Technical Review.

The EPM, nevertheless, arranged with Accident Analysis Branch for acceleration of completion of the received material.

Original signed by L B. Werner G. K. Dicker, Chief Environmental Projects Branch 2 Directorate of Licensing Enclosures Request for Schedule Change, Hanford 2, dtd. 8/7/72 ces C. K. Dicker, EP-2 L R. R. Loose, EP-2, L L. B. Werner, EP-2, L DISTRIBUTION:

DOCKET FILE (ENVIRON)

RP Reading EP-2 Readinc l

i omcce

_EP-2 : L.

..lEP-2:L 8605290062 720015 PCR ADOCK 05000397 D

PDR LBVerner : peb...GKDicker summaut.

8/15/72 8/ /72 to uc.s[^8Nucw mo

". Z,5% ZG.w..<., m

~

~

~~~

t

s 4'

/

REQUEST FOR SCHE lE Cil/J;GS i

s Joseph M. Hendrie INITIATOR OF CHANGE REQUEST: _ Deputy Director for Technical Review DATE:

8/7/72 PL/J;T NN:Z: _Hanford 2 DOCl:ET 1;0. : 50-397 MILESTONE DESCRIPTIO:1:

34.

Accident Analysis received by Environmental Projects Manager.

l REASON FOR CilANGE:

(Use additional chects if necessary)

Scheduled date incorrectly set: Enviro mental Projects did not check with Accident Analysis Branch.as to available manpower.

(Applicant infomation not available to meet old 7/6 target date.)

8/4/72 E TARGET DATE:

7/6/72 T

~'

ESTIMATED DATE:

8/21/72 VARIMiCE : 17._

CONCURRENCE:

(Project Org,anization)

A. Giambusso, RP 8/9/72 C0!;CURRESCE:

(Technical Review Organi::ation)

QQ g

IIFACT DATA (To be Prepared by OPS)

(Additional sheets should be used if neccosery)

~

TOTAL PROJECT VARIAI;CE Fuel Prospective Variance

/

Load Decision Date Date RESPO:;SIBLEPARI1ES:

RECO:O; ENDED FOR APPROVAL:

DATE:

Ipirector of Licensing APPROVED / DISAPPROVED:

DATE:

Director of Regulation f

a l

s o

!