APR 1 8 E74 Docket File No. 50-460 L-Rdg i,
Docket No. 50-460 '
SEB RF l\\
t V. A. Moore, Assistant Director for Light Water Reactors, Group 2 Directorate of Licensing WASHItGT0!! PUBLIC POWER SUPPLY SYSTEM - WPPSS NUCLEAR PROJECT NO.1 SECOND ROUND REVIEW OF PSAR Plant Name: WPPSS Iluclear Project lio.1 Licensing Stage: PSAR - CP Review (Q2)
Docket Nunber: 50-460 Responsible Branch and Project Manager: LUR 2-3 T. Cox Requested Completion Date: April 29,1974 Applicant's Response Date Kecessary for Completion of Next Action Planned on Project: Unknown Description of Response: Answers to Questions Review Status: Complete The second round review of the PSAR has been completed by the Structural Engineering Branch and we find that additional infomation is required in order to complete the review. The additional information requested, which concerns structural aspects, is contained in the enclosure. The naterial reviewed to date consisted of infomation provided through Amendment No. 5, dated March 19. 1974
\\
R./ 5/accary, Assistant Director R. M for Engineering.
Directorate of Licensing
Enclosure:
Second Request for Infomation l
l cc w/o encl:
cc w/ encl:
A. Giambusso, L S. Hanauer, DRTA L. Shao, L W. Mcdonald, L J. Hendrie, L T. Cox, L A. Schwencer, L C. P. Tan, L l
S. Varga L R. Shewmaker, L i
8605290042 740418
/
PDR ADOCK 05000460 A
PDR O^
l
\\
ar >< =
- _L:SEB
.. L:S EB. 4 L:SEB.'
/
i x7341
- -\\
U"
\\
~a-=
- CPT m. g g.y.RShe r-LCSha -
a ry --
.b "',' '
\\
.. 4/u. /74 _..._..
4//6 /74 4////74--
4/ti / 74.-
.. n.-
\\AEC 318 (Rev,9 93) AECM 0240 e*=
C*a se s t e s.:
se se.
=
L
~
WASHIMGTON PUBLIC PO'.lER SUPPLY SYSTEli
'i?P55 3UCLEA:t Pd.u]ECT.;0.1
~
DOCKET M0. 50-460 STRUCTUP.AL EliGINEERIliG BRAllCH SECOND REQUEST FOR IMFORMATION Section 3.7.2.13 Questions 3.9 and 3.28 Although t.he Staff concern was expressed in the Section entitled, "l-fethods to Determine Category I Structures Overturning !!oments", it was meant to apply to the analysis of all structures, systems and subsystems for all forces (moments, shears, normal forces etc.) acting internally upon the structures, systems or components.
The Staff position as stated in the original question, Question 3.9, was as follows:
"Hence it is required that the effects of earthquakes on' structures, components, or elements be computed by taking the square root of the sum of the squares of the particular effects or responses at a particular point caused by each of the three components of motion (two horizontal motions at right angles to one another, and one vertical motion)."
Noting that this statement was applied to include all structures, systems and components it is advisable to include the statements related to this analysis procedure in each of Sections 3.7.2.1, Seismic Systen Analysis and Section 3.7.3.1, Seismic Subsystem Analysis.
In this manner the procedure can be specified in a general way to apply to the method of combining the three responses simultaneously for all Category I structures, systems and components.
It is acceptable to the Staff that the elements being combined as the square root of the sum of the squares be stresses.
Revise the SAR document to reflect these comments.
Section 3.8.1.4 Question 3.34 In response to this question, you indicated that the problem is under study. An approximate date of completicn of the study should be provided.
.