Text
-
3
/ % }hu s- 00 ' VfC DISTRIBUTION :
Docket Files (2)
NRR Reading QAB Project DJShovholt, QAB SEP 141977 CJHeltemes, QAB AMGarland,QAB FRAllenspach, QAB Docket Hos.: 50-460 JCostello,QAB and 50-513 i
HEMORANDUM FOR:
- 0. D. Parra Chief. Light Water Reactors Branch No. 3, DPM FROM:
C. J. Heltemes, Chief Quality Assurance Branch, DPM
SUBJECT:
FIRE PROTECTION Q-l's & Q-2's QUALITY ASSURANCE BRANCH (FIREPROTECTI0AORGANIZATIONANDQUALITYASSURANCE)
APPLICANT: Washington Public Fower Supply Systems (WPPSS)
PLANT NAME: WPPSS Nuclear Projects Nos. I and 4 LICENSING STAGE: Fire Prccection Review RESPONSIBLE BRANCH: LWR No. 3 PROJECT MANAGER:
T. Cox REQUESTED COMPLETION DATE: October 10, 1977 REVIEW STATUS: Q-l's and Q-2's Complete The Quality Assuranca Branch has completed its review of the quality assurance program as well as the organizational structure and responsi-bilities for fire protection for WPPSS Nuclear Projects Nos.1 and 4.
The information received was included in the document entitled "WPPSS Nuclear Projects Nos.1 & 4 Fire Protection Systems Review," submitted on April 6, 1977.
WPPSS has comitted fra the above document that ddsign, procurement, festallation and testing activities conducted after '4 arch 7,1977 will be conducted in accordance with the applicable portions of the existing Design and Construction Quality Assurance Progrars necessary for compliance with the fire protection program described In Appendix A to Branch Technical Position APCSB 9.5.1.
When the applicant meets the fire protection QA program criteria as part of the QA program under 10 CFR Part 50 Appendix B (Section 17 of the PSAR) it is not necessary i
to submit a detailed description for NRC review. Therefore, there trill be no fire protection quality assurance questions or positions relative to this application.
t j;ig, ' C I
I I
r c = >
8605290036 770914 PDR ADOCK 05000460
(
'u "" a ""
- F PDR 772140030 l
l l
l
\\ __ _ _32-- -
NRC FORM 318 (9 76) NRCM 0240 W w. s aovanmusnv emurine orrics. s,7e-wo-eae
O. D. Parr SEP 141977 The staff has reviewed and evaluated the fire protection organization and finds it acceptable. There will be no fire protection organization questions or positions relative to this application.
i Original si-a.ed by:
c R. J. McDermott C. J. Heltames, Jr., Chief Quality Assurance Branch Division of Project Management cc:
P. Mathews, DSS W. LeFave, DSS T. Cox, PM i
m
- '# E W Ibfk
.. hk1hh
...h!.hf
.;,.k]
su a~a = = *
..JCos.teno:ak._FAnehh*War'5an'
- d. t.,
temes.-
/
t oavs
- _.-9 /8/ 7 7.--...
9//Z/77-
-9//3/7L -
-9/2U7L --
NRC PORM 318 (9 76) NROt 0:4 W us s.eovannusur rainvine orrecas sore-uwas