ML20198F621

From kanterella
Jump to navigation Jump to search
Notification of 770714 Meeting W/Util & USGS in Bethesda,Md to Discuss Draft Rept on 1872 Earthquake Issue
ML20198F621
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/20/1977
From: Cox T
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
References
CON-WNP-1146 NUDOCS 8605290022
Download: ML20198F621 (2)


Text

\\

/

UNtTED STATES y'

~' g NUCLEAR REGULATORY COMMISSION g,

j WASHINGTON, D. C. 20555 JUN 2 01977 Docket Nos. 50-460 and 50-513 MEMORANDUM FOR:

0. D. Parr, Chief, Light Water Reactors Branch No. 3, DPM FROM:

T. H. Cox, Project Manager, Light Water Reactors Branch No. 3, DPM

SUBJECT:

MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

AND U. S. GEOLOGICAL SURVEY DATE & TIME:

Thursday, July 14, 1977, 1:00 p.m.

LOCATION:

Room P-110, Phillips Building, Bethesda, Maryland PURPOSE:

To discuss a draft report on the 1872 earthquake issue.

The draft report is to be simultaneously delivered to both the USGS and the NRC staff, on or about July 8,1977.

PARTICIPANTS:

NRC T. Cox, C. Stepp, J. Kelleher, R. McMullen WPPSS D. Tillson, A. Hosler, L. Grume, H. Coombs, H. Waldron, R. Holt, V. Murphy USGS R. Morris, J. Devine, S. Brockman, P. Hanshaw A

,)

C/Ar o.W.

c Thomas H. Cox, Project Manager Light Water Reactors Branch No. 3 Division of Project Management l

t 8605290022 770620 PDR ADOCK 05000460 A

PDR

s e_

e MEETING NOTICES DISTRIBUTION Docket File J. Knight NRC PDR D. Ross Local PDR R. Tedesco TIC S. Pawlicki LWR #3 File I. Sihweil NRR Reading P. Check E. G. Case T. Novak D. Crutchfield Z. Rosztoczy R. Boyd T. Ippolity R. DeYoung V. Benaroyo D. Vassallo G. Lainas D. Skovholt F. Rosa R. Denise V. Moore F. Williams R. Vollmer J. Stolz M. Ernst K. Kniel W. Gammill 0..Parr G. Knighton S. Varga B. Youngblood R. Clark W. Regan T. Speis D. Bunch P. Collins J. Collins C. Heltemes W. Kreger R. Houston R. Ballard R. Heineman M. Spangler H. Denton J. Stepp ACRS (16)

L. Hulman L. Crocker H. Ornstein H. Berkow L. Dreher Attorney, ELD Project Manager Zin,tfez IE (.3 )

B. Faulkenberry, IE SD (7)

M. Rushbrook Receptionist NRC

Participants:

i l

--..